A patterned acrylic cabinet package fails on site far more often because of what was never written down than because of the panel itself. Finish names that mean different things to two factories, dimensions taken from a drawing that no longer matches the wall, and hardware listed as "as per standard" are the usual causes of rework, delayed handover and disputed invoices. The submittal is where those gaps get closed before production starts.

Below is the content we expect to see in a complete submittal for patterned acrylic cabinets, written from the point of view of a contractor, designer or procurement lead who has to sign the document off and then live with the result.

What a product submittal actually has to do

A submittal is not a brochure. A brochure sells; a submittal records an agreement. Its job is to give every party on the project — main contractor, interior designer, client representative, installer and factory — one document that can be quoted against, inspected against and, if necessary, argued over.

For custom-made cabinetry this matters more than for catalogue goods. Our custom furniture design and prototyping work starts from a project brief, not from a stock code, so anything the submittal leaves open will be decided by someone on the production line, usually without asking you.

1. Project identification and document control

  • Project name, address and the unit, floor or villa reference the cabinets belong to.
  • Your purchase order number and our sales order or quotation reference.
  • Submittal version number and issue date, with a one-line change log on every revision.
  • The drawing revision each dimension in the submittal was taken from, stated explicitly.
  • Names of the people who can approve the document, and the date their approval was given.

Version control sounds administrative until a second design revision arrives halfway through production. A submittal marked "Rev B, supersedes Rev A dated 14 March" settles which drawing governs; an unnumbered PDF settles nothing.

2. Scope of supply and item schedule

List every item included in the package, and just as importantly list what is excluded.

Include in the scheduleTypical exclusions to state clearly
Base units, wall units, tall units, pantry and appliance housings, by item code and quantitySite preparation, plastering, electrical first-fix and plumbing connections
Doors, drawer fronts, panels, trims and scribes that belong to each unitWorktops, splashbacks and stone fabrication, unless quoted together
Appliance towers and integrated appliance housings, with the exact cut-out they are built aroundDelivery to floors above ground level, hoisting or crane lifts
Loose interior accessories: shelves, drawers, baskets, lighting if specifiedOn-site adjustments caused by out-of-tolerance walls and floors

Where the cabinets form part of a wider fit-out, say so. A kitchen package ordered alongside wardrobes, vanities and wall panelling should reference the same finish schedule and drawing set, which is how interior fixtures stay visually consistent across rooms instead of matching only by accident.

3. Dimensions that are tied to the site, not to a model file

Our acrylic kitchen cabinets are made-to-measure, so the submittal carries the finished dimensions for each unit: overall height, width and depth, plus module splits, plinth or toe-kick height, and the reveal at ceilings and corners.

  • Give dimensions in one unit throughout and state that unit once, clearly.
  • Show running dimensions along each wall, not only individual widths, so gaps and cumulative error are visible.
  • Record which measurements were taken on site and which were read off a design drawing. Finished-floor levels change floor-to-ceiling heights.
  • Note scribing allowances at uneven walls and ceilings, and who decides on site how much is trimmed.
  • Confirm clearances for doors and drawers in front of the unit, including clearance from an island or opposing counter.

Add a plan elevation for each wall, plus a section through one typical run. A section showing carcass depth, worktop height and the position of the tall units answers more questions than three extra renders.

4. Substrate, door construction and edge treatment

"Acrylic" describes a surface, not a door. A workable submittal separates the three layers:

  • Core or substrate. State what the panel is built from and the grade, since moisture resistance in a kitchen differs by zone and by supplier grade.
  • Surface. Whether the decorative layer is applied as a board-level laminate or as a wrap, and which direction the pattern runs on each face.
  • Edges. Edge banding material and colour code, or wrapped edges, plus which edges are visible. Pattern-matched edges on a run of doors look consistent only if the grain direction is agreed for every door.
Ask for the substrate grade to be named in writing rather than described as "moisture resistant board". Two factories can both use that phrase and ship different boards.

5. Pattern, colour and sheen references

This is where patterned acrylic most often goes wrong, because a pattern has more variables than a solid colour: repeat size, direction, scale relative to the door, and how much of the motif appears on a small drawer front compared with a full-height door.

  • Pattern or decor name plus the supplier code — never a trade name alone.
  • Sheen stated as a defined value or an agreed band, not "glossy" or "satin".
  • Pattern direction and repeat, with a note on whether motifs are centred, aligned to a datum line, or allowed to run continuously across the run.
  • Cutting layout for large doors: which part of the pattern is kept, and what happens at the trim edge.
  • A reference photograph of a real installed panel, not only a digital render.

Where the design calls for a different sheen in the same kitchen, list each finish against the units that carry it. A single line reading "high gloss on tall units, matte on base units" prevents the two being quoted as one price and delivered as one look. The acrylic range covers both ends of that choice — high gloss acrylic cabinets and matte acrylic cabinets — so the submittal should name which units take which finish rather than leaving it to a mood board.

6. Physical samples and their status

A printed or digital swatch is not enough for patterned acrylic. Include in the submittal:

  • A physical sample of the actual door construction — substrate, surface and edge together — at a size large enough to read the pattern.
  • The sample reference code, matching the code on the order.
  • Who signed for the sample, and on what date.
  • Whether the approved sample is a full-size door or a cut-off. Cut-offs hide how a pattern behaves across a wide panel.

Keep the approved sample until handover. At inspection it is the only reference that cannot be argued about.

7. Hardware, mechanisms and integrated appliances

  • Hinge brand, model and closing action; slide brand, load rating and whether soft-close is included.
  • Handle specification, or the profile of a handleless rail and the material it is made in.
  • Interior fittings by unit: drawer boxes, baskets, pull-out trays, shelf pins, waste sorting bins, lighting and its transformer location.
  • Appliance cut-outs with the manufacturer's model number and installation drawing attached.
  • Load limits for shelves and extension mechanisms, if the manufacturer publishes them.

Where a submittal says "quality soft-close hardware throughout", replace it with named parts. Substitutions are only defensible when the original part is on paper.

8. Fabrication, tolerance and assembly detail

  • Carcass construction and assembly method, and whether units arrive assembled or flat-packed.
  • Admissible tolerance for level, plumb and line at installation, plus the maximum scribe width.
  • Fixing method to each wall type on site, including fixings into stud, masonry or a steel frame.
  • Protection applied to doors and worktops during transit and on site.
  • Pack marking that ties each crate to a room and elevation, so the installation sequence is readable from the boxes.

9. Logistics, sequencing and site readiness

Our logistics and door-to-door delivery service covers freight, customs paperwork and container loading, but the submittal still has to say how the cabinetry fits into the programme. Record:

  • The agreed lead time from approved submittal to despatch, and what starts that clock.
  • Delivery port or door, Incoterms, and who handles customs clearance and duties locally.
  • Container or shipment split, if the kitchen is part of a larger furniture and building materials order for the same project.
  • Site prerequisites with dates: plastering complete, floor levels set, services first-fix signed off, storage available.
  • Access route and lift or stair dimensions for the longest unit in the package.

A cabinet order that arrives before the wet trades finish is a storage cost and a damage risk. Sequencing belongs in the submittal because it depends on the specification — assembled tall units need an access route that flat-packed panels do not.

10. Installation, inspection and after-sales terms

  • Who installs: our installation and after-sales support team, your joiner, or a split of the two.
  • The snag list process and the standard the cabinets are inspected against.
  • Warranty period and what it covers: panels, mechanisms, edges, and separately anything damaged on site by others.
  • Spare parts availability — how replacement doors and drawer fronts are ordered later, and whether pattern continuity can be repeated.
  • Cleaning and maintenance guidance for the acrylic surface, including what to avoid.
Ask specifically whether a future replacement door in a patterned decor will match an aged installed panel. Batch variation is real; the answer changes how many spare doors are worth ordering with the original package.

11. Sign-off block

Close the document with a signature table: name, role, company, date, and revision approved. State what approval covers — dimensions, finish, hardware — and state that approval of one does not release the other parties from their own site checks. Then attach the drawing set, sample record, hardware schedule and any appliance sheets as numbered appendices, so nothing circulates loose.

Frequently asked questions

When should the submittal be issued?

After the layout is fixed and the site dimensions are taken from finished surfaces, but before any panel is cut. Issuing it earlier means approving numbers that will change; issuing it later means production has already made the decisions for you.

Is one submittal enough for a whole villa?

One document can cover kitchens, wardrobes and vanities if each room has its own schedule and finish references. What matters is that a single finish code means the same thing on every page.

What is the most common omission?

Pattern direction and repeat on wide doors, together with the edge treatment. Those two items decide whether a run reads as one design or as a set of separate panels.

SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with custom cabinetry made to project-specific dimensions, finishes and layouts. Send us your drawing revision, finish codes and appliance list, and we will return a submittal pack built around the checklist above — contact PHILLIP to start one.