A light grey shaker kitchen looks simple on a mood board and complicated on a purchase order. The door profile is easy to agree on; the checklist behind it is where projects go wrong — sizes that do not match the room, finishes that drift between batches, appliances that were never confirmed, and hardware quoted separately from the cabinetry. Below is the checklist we use when specifying this style for villas, apartment units and boutique hotel kitchens, written so a buyer can compare quotations on the same basis.

1. Door profile and panel construction

Shaker means a five-piece door with a recessed centre panel, but the detail varies. Decide first what you are actually buying: a flat recessed panel or a raised one, how wide the stiles and rails are, and whether the panel is fixed or allowed to move with humidity. Narrow stiles read modern; wider stiles read classic. This choice changes tooling and price, so it belongs in the enquiry, not in a later revision.

Our light grey shaker style kitchen cabinets use a raised panel door with warm metallic hardware and a two-tone light grey and off-white scheme, which is the softer, more traditional reading of the profile. If your design calls for a flatter face, ask for samples of both and view them in the room's own light before signing.

2. Colour, sheen and batch control

"Light grey" covers dozens of real colours. Lock it down with a physical sprayed sample, a stated sheen level, and the reference used for approval — a RAL number or a signed board, not a photograph. Then confirm two practical points: that all door panels for one kitchen are sprayed in a single batch, and that the same reference is archived so future units, replacement doors or a second villa phase can be matched later.

Two-tone schemes need one more line on the checklist. If uppers are light grey and lowers are a darker tone, request both samples together and check them side by side under the same lamp, because each finish reflects light differently.

3. Carcase material and substrate

The door is what you see; the box is what fails. Specify the substrate behind the paint — painted MDF, plywood or particle board — and the carcase board thickness and edge treatment. Kitchens near a sink or dishwasher need closed, well-sealed edges at the base and sides. Our painted shaker cabinets are made to measure with material and finish selected per project, so the substrate is a line you should confirm in writing for your order rather than assume.

For wet or high-use settings, ask about alternative constructions in the same door style. We also supply shaker style plywood cabinets where a plywood substrate is specified instead.

4. Layout, dimensions and the interface drawings

A complete checklist includes drawings, not just a rendering. Before production you should have a elevation set with overall and cabinet-by-cabinet dimensions, a plan showing appliance positions and clearances, and an interface drawing covering services: water supply and waste, electrical outlets, and the flue or ventilation route for any hob. Countertop thickness, splashback edges and where the worktop meets the carcase should be shown too.

Ask who measures on site and who signs off the final dimensions. In project work this single confirmation step prevents most installation-day surprises.

5. Internal configuration

  • Deep drawers at the base instead of shelf-and-door units, where pot storage is needed.
  • Adjustable shelving with stated pin-hole spacing and shelf thickness.
  • Pull-out trays, cutlery organization and corner solutions listed item by item, with quantities.
  • Tall units sized for the specific appliances you intend to buy, not generic openings.
  • Bin and laundry provisions if the kitchen adjoins a utility area.

6. Appliances and integration

Appliances decide cabinet widths, ventilation gaps and door surrounds, so confirm them before the drawings are frozen. Specify which units are built in, which are integrated behind a cabinet panel, and who supplies each item. The light grey shaker configuration shown on our site integrates a wine refrigerator, an oven and a microwave within the run, with glass display cabinets and open niches lit by warm LED strips — useful as a reference layout, but the appliance models in your quotation must be listed individually.

Light grey shaker style kitchen cabinets with raised panel doors, integrated appliances and lit glass display cabinets

Custom light grey shaker cabinetry with raised panel doors, integrated appliances and LED-lit glass display cabinets.

7. Hardware schedule

Hardware is where quotations differ most because it is often quoted separately. Request a schedule naming hinges (with or without soft close), drawer slides and their load rating, handle and knob finish, support legs, adjustable feet and connecting brackets, plus the quantity of each. Handle finish should be sampled against the tapware. Our custom built-in kitchen cabinets are supplied with matching hinges, slide rails, support legs and connecting brackets on request, which keeps the whole set on one specification.

8. Display, lighting and detailing

If the design includes glass-fronted uppers or open niches, add them to the checklist explicitly: glass type and thickness, glazing bars or none, the LED strip specification, transformer location and how it is accessed for replacement. Lighting inside a cabinet fails far more often than the cabinet itself, so access matters.

Our glass front shaker cabinets cover this detail within the same collection, keeping door profile and finish consistent between solid and glazed doors.

9. Sampling, production approval and packing

  • A sprayed door sample and a carcase corner sample approved and signed before mass production.
  • Written confirmation of final drawings, dimensions and hardware schedule.
  • Packing method stated: individual cartons, edge protection, and how doors are labelled to their opening.
  • A packing list that matches the drawing set, so a site team can identify every module on arrival.

10. Delivery, installation and after-sales terms

For international orders the checklist continues past the factory gate. Confirm Incoterms and delivery address, who handles customs clearance, container loading method, and whether installation guidance or on-site support is included. Then record what after-sales cover means in practice: which parts are supported, how replacement panels or hardware are ordered, and the response route if a module arrives damaged. We handle freight by sea, air and rail with door-to-door delivery, plus installation and after-sales support, so these terms should be written into your order rather than assumed.

11. Cost basis and comparison

Compare suppliers line by line, not on a single total. A quotation that looks cheap often excludes appliances, glass doors, internal fittings, special finishes or delivery. Put every supplier onto the same sheet: linear metres of cabinetry, each module, hardware quantities, appliances, lighting, packing and freight. That is also how you spot a missing item before it becomes a variation order.

A useful test: if your enquiry to two suppliers produces identical line items, your checklist is complete. If the answers differ wildly, something in the specification is still open.

Ready to price your kitchen?

Send us your drawings or a photograph of the space, together with the appliance list and the finish you have chosen. We will quote made-to-measure cabinetry against that specification, confirm substrate, hardware and layout in writing, and arrange production, delivery and installation support for villas, apartment units and hotel projects.

Talk to a cabinet specialist

SANTERSON is a China-based furniture and building materials manufacturer supplying custom cabinetry and interior fixtures for residential and hospitality projects worldwide. Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com to start a quotation.