A carpet quote is where a guest room scheme either holds together or quietly falls apart. The pattern you approved on a mood board and the roll that arrives at site loading are two different documents, and everything between them is written down in the quotation. If you are specifying a custom blue grey ink pattern carpet for hotel guest room and villa projects, the quotation needs to describe an engineered product, not a picture. Here is what a complete, comparable quote should state before you sign it.
1. Pattern definition: how the design is actually reproduced
An ink-wash design has no repeat lines and no obvious symmetry, which makes it easy to misread on a small sample tile. Ask the supplier to state, in writing, which of these applies to your order:
- A supplied artwork file at production resolution, with the scale at which the pattern will be tufted or printed relative to the room dimensions.
- The direction the pattern runs on the roll, and whether it is directional when installed wall-to-wall.
- How the design behaves on a cut edge — an abstract wash that looks balanced in the middle of a room can end abruptly at a wardrobe line if nobody scaled it for the room width.
A quote that only says "blue grey, as picture" has committed you to nothing. A usable quote names the artwork reference and the scale.
2. Fibre and construction, stated as options rather than assumptions
The same ink-wash design can be made in several constructions, and each one changes both price and how the surface wears under a trolley. Our customizable commercial carpet for hotel, banquet hall and villa projects is made to order in size, colour, pattern and fibre blend — from wool through to nylon, jacquard or tufted. What matters commercially is that the quote names the blend you are buying instead of leaving it open.
Check for these lines on the quotation:
- Fibre content and pile construction, with the alternative constructions priced separately so you can compare like for like.
- Primary and secondary backing, and what the carpet is suitable for — a guest room floor and a corridor are not the same duty.
- Total thickness and approximate weight per square metre, because these drive freight cost as much as they drive underfoot feel.
3. Sizes, cut lengths and waste allowance
Guest room floors are repetitive; villa floors are not. A quote built on a single room type will break down when it meets the irregular bay in a suite or the angled wall in a living room.
| Item to see on the quote | Why it matters |
|---|---|
| Cut lengths per area, not one total figure | Lets you verify that each room is measured separately and check the maths yourself. |
| Roll width being used | Determines where seams fall and how much offcut you are paying for. |
| Stated waste or matching allowance | An abstract pattern needs less matching than a striped design, but it is not zero. Ask for the percentage used. |
| Seam locations for wide rooms | Shows whether seams fall in door lines or across the middle of the room. |
For a related colourway, compare how our blue white stripe ink pattern carpet for hotel guest rooms is quoted: a striped design carries pattern-matching waste that an ink-wash design does not, and the difference shows up in the allowance line.
4. Colour approval: sample before production, in writing
Blue grey is a difficult colour to hold. It shifts warm or cool depending on the fibre, the pile direction and the lighting in the room — and a guest room lit by warm downlights reads very differently from a villa living room with north light.
A quote should include a pre-production sample stage: a physical sample of the actual design and blend for approval before manufacturing starts, with the approved sample kept as the reference for the whole order. If colour matching to an existing carpet or a fabric is required, say so on the request for quotation; matching work is priced differently and needs a physical reference sent to the factory.
5. Order quantity, lead time and how they are linked
Custom carpet is manufactured in production windows, so the minimum order and the lead time move together. Ask the supplier to state both for your exact specification, and to show what changes if you reduce the quantity or split delivery between room types.
- Minimum order per design, and whether trial quantities are accepted.
- Production time from approved sample, not from purchase order — the sample round is where most delays hide.
- Whether later rooms on the same project will be produced in the same batch. Batch differences in pile are invisible on a drawing and obvious on site.
6. Packing, freight terms and what the price includes
Carpet is bulky, and it arrives damaged when it is packed loosely. Ask how the goods are rolled, wrapped and protected at the ends, and confirm which Incoterm the price is quoted on — ex works, FOB or delivered to site produce very different landed costs once freight and duties are added.
For project work we handle packing, container loading, customs documentation and door-to-door delivery as part of the package, so the quotation can be read against a delivered cost rather than a factory gate figure. Confirm the terms for your own port and site access before comparing two suppliers' numbers.
7. Installation support and after-sales scope
The last section of a serious quote covers what happens after the container arrives: seam treatment on site, skirting and threshold details, snag inspection, and who is responsible for replacement if a section is damaged during the fit-out phase. Even where you appoint your own floor layer, ask what technical support the supplier provides and how claims are handled.
A quick comparison sheet before you choose
Put every quotation into one table with the same seven rows: artwork reference and scale; fibre and construction; cut lengths and waste allowance; sample stage; minimum order and lead time; packing and Incoterm; installation and after-sales. Two quotes that look close on price per square metre often separate by a wide margin once those rows are filled in, because one supplier has priced the whole job and the other has priced a roll of carpet.
Send us your room schedule
SANTERSON has manufactured furniture and building materials for hospitality, villa and office projects since 2008. For custom carpet enquiries, send the room dimensions, the pattern reference and your target delivery port, and we will quote the specification rather than the photograph — with a sample before production.
Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com. Browse the full range in carpets and rugs.