A partition sliding system looks simple on a drawing: two or three panels, a track, a run of wall that opens and closes. On site it is one of the more coordination-heavy items in a joinery package, because the opening has to be exact, the track has to carry the panel weight, and the finish has to match the cabinetry beside it. When the same order also crosses an ocean, most of the risk moves out of the workshop and into the paperwork before production starts. This guide walks through how we take a Santerson Partition Sliding Systems order from enquiry to handover at our own factory, and what a buyer or specifier should have settled before the panels are cut.
What a Partition Sliding System Actually Covers
In our catalogue, partition sliding systems sit in the Sliding Panel Systems collection alongside closet, acoustic, glass and textured sliding panels. The difference is function. A closet panel closes a wardrobe; a partition panel divides a room. It carries the visual weight of a wall, and it has to work as an operating element every day, often across a wide opening where one fixed panel would not make sense.
All of these listings are configurable rather than standard sizes. Each one is made to measure, with material and finish selected per project and the layout set out around the actual space. That is exactly why the specification conversation matters: the same opening can take a single sliding panel, a two-panel bypass, or a multi-panel stacking arrangement, and each one changes the track, the wall build and the clearance you need to plan for.
Related items in the same family are worth deciding on at the same time. Santerson Closet Sliding Panels close built-in storage, Santerson Acoustic Sliding Panels are specified where separation between two spaces matters as well as the visual screen, and Santerson Sliding Panel TV Systems hide a screen behind a panel. If your project uses more than one of these, we produce them together so the track heights, panel thickness and finish are consistent across the job.
The Information We Need Before Quoting
Most delays on an overseas joinery order trace back to a drawing that was not dimensioned for manufacture. For sliding panels specifically, these are the points we ask a buyer or their site team to confirm. Without them we can give a rough idea of cost, but not a production-ready quotation.
- The finished opening width and height, plus the head condition: is there a ceiling void above the opening that the track can sit inside, or does the head need to be built up?
- Panel count and stacking direction. Which side do the panels park on when open, and how much pocket space is available for them?
- Track type, and whether the system is top-hung or floor-guided. This drives what the structure above has to carry.
- Panel core and surface: timber and wood-veneer fronts, lacquered or matte fronts, glass infill, or an acoustic build where separation between rooms is part of the brief.
- Edge and hardware detail: handleless or handle, integrated pulls, soft-close gear, and any lock or latch for a private room.
- The finishes already fixed on site, so we can match veneer tone, lacquer sheen and metal colour to what your project has installed.
A note on scope: our product pages list made-to-measure sizing, material and finish options, and a layout tailored to the project. They do not publish fixed panel thicknesses, load ratings or separation figures. Track, hardware, opening dimensions and any performance requirement are confirmed for each order against your drawings, so treat anything in this article as process guidance rather than a technical data sheet.
How the Order Runs Through Our Factory
SANTERSON has been making furniture and building materials in China since 2008, and we produce these systems in our own workshops rather than buying them in from a third party. That matters when an order mixes trades: the same team that builds your wardrobes, kitchen cabinetry and wall panelling is cutting the sliding panels alongside them, so the veneer batch and the lacquer batch are shared.
1. Design and shop drawings
We start from your layout or a brief for the space and return shop drawings showing panel sizes, division points, track position and how the panels stack. In an existing building, on-site measurement by your team is usually the deciding step; in a new build, we work from architectural dimensions and flag any tolerance that needs closing before the opening is fixed. Nothing enters production until those drawings are signed off.
2. Material and finish selection
This is where an overseas order either gets smooth or gets expensive. We send finish samples and confirm the selected surface before cutting, because a veneer or lacquer approved on a screen in another country is hard to reverse once panels are made. Where your project already has cabinetry installed, matching to a physical sample you provide is safer than matching to a colour name.
3. Production and quality control
Panels are made to the signed dimensions, with hardware positions set at the bench rather than adjusted on site. We check panel squareness, edge condition and the operation of the gear before packing, and we pack tracks, hardware and panels as a labelled set so the installer is not opening thirty identical cartons looking for one bracket.
4. Freight and delivery
We arrange freight forwarding by sea, air or rail, prepare the shipping documents, and organise container loading and door-to-door delivery to site. Sliding panels are long, flat and easily chipped at the edges, so the packing plan and the stowage plan are agreed with the forwarder before loading. Import terms, duties and any permit requirements for your country are confirmed case by case with you, because they change by destination and by shipment.
5. Installation and handover
Track alignment decides whether a sliding system feels good or feels cheap, so we provide installation guidance for the site team, and where the project scope calls for it, on-site installation support. Handover includes an inspection walk with your team and a snag list, followed by spare parts and maintenance support afterwards.
Buying Partition Sliding Systems as Part of a Larger Package
The clearest saving on an overseas order is usually not the unit price of one item; it is consolidating items that share materials, finishes and a single shipping cycle. A wardrobe door and a room partition in the same veneer, ordered together from one factory, arrive consistent. Ordered separately from two suppliers, they rarely do.
If your project needs sliding panels alongside other built-in work, we supply them as part of the wider joinery package: Wall Panel Systems for the fixed wall surfaces around the opening, Santerson Acoustic Panels where surface treatment is part of the design, and Santerson Sliding Storage Panels where the panel front is doing storage duty rather than zoning. As a one-stop project furnishing supplier, we also produce the cabinetry, doors and interior fixtures that sit next to these systems, which is how a whole villa or apartment floor can be kept to one finish schedule and one delivery window.
Our Custom & OEM Service covers bespoke sizes, finishes and textures, prototyping, and OEM manufacturing with flexible order quantities. For buyers who specify rather than install, that means the same workshop can produce a prototype panel set for client approval before the production run is released.
A Worked Example: Sliding Screens Inside Whole-House Joinery
Our Mid-century Whole House Custom Cabinetry & Built-in Storage Project shows how a sliding screen behaves in a real installation rather than in isolation. In that home we built an integrated bay-window desk with layered drawers, open staircase bookshelves and wood-grain kitchen cabinets, and used a vertical slat partition to separate two spaces while still letting daylight pass between them. Every cabinet dimension was measured on site so the joinery met the appliances and the wall lines exactly.
Two things from that project apply directly to sourcing sliding panels overseas. First, the partition was designed with the rest of the joinery, not after it, so the slat spacing and wood tone carried through from the kitchen and the shelving. Second, the site survey came before design, which is what allowed a full-height element to sit flush against an existing floor and ceiling. If you are comparing suppliers, ask whether their quotation includes measured dimensions or assumes your drawings are correct.
Common Problems, and How They Are Avoided
| Problem on site | Where it usually starts | What to settle before production |
|---|---|---|
| Panels bind or jump the track | Track set out of level, or floor guide fixed after the panels are hung | Confirm top-hung or floor-guided, and who sets out the track on site |
| Veneer tone does not match existing cabinetry | Finish approved from a screen image instead of a physical sample | Approve a sent sample, or send us a sample of your installed finish |
| Panels do not stack in the available pocket | Stacking space never dimensioned on the drawing | Show open and closed positions with panel thickness included |
| Chipped edges on arrival | Packing plan left to the freight forwarder | Agree edge protection and stowage before container loading |
| Hardware missing at handover | Gear ordered separately from panels | Order tracks, gear and spares in one labelled set |
| Schedule slips by weeks | Drawings reissued after cutting started | One signed drawing set as the release condition for production |
Questions Buyers Ask Us Most
Can you supply a sample before we commit to an order?
Yes. Finish and material samples go out before production, and for larger schemes we can build a prototype panel set for client approval under our custom service.
Do you ship directly to a residential site?
We organise door-to-door delivery, so the consignment can go to your project address rather than to a port for you to collect. Freight mode and delivery scope are confirmed for the specific destination.
Who installs the system?
Either option is possible. Many buyers let their local fitter install from our assembly drawings; where the project scope includes it, we provide installation support and an inspection walk with your team.
What if a panel is damaged in transit?
Report it with photographs on arrival. Because the panels are made to measure, replacing the affected panel is arranged through our after-sales support rather than an off-the-shelf swap, so keep the packing and note the carton labels.
A Practical Checklist Before You Send an Enquiry
- Measured opening width and height, or architectural drawings with dimensions marked.
- Photographs of the space, including the ceiling condition above the opening.
- Preferred panel count, stacking side, and whether the system stands open most of the day or closed.
- Surface direction: timber, lacquer, matte, glass, or an acoustic build.
- A physical sample of any finish that must be matched on site.
- Your delivery address and preferred shipping terms, so the quotation includes freight rather than adding it later.
- The programme date you need panels on site, which determines whether sea, air or rail is realistic.
Getting a Production-Ready Quotation
Send us the opening dimensions, your drawings and the finish requirement, and we will come back with shop drawings and a quotation that states what is included: panels, track, hardware, packing and the freight option you chose. If your project also needs wardrobes, cabinetry, doors or wall panelling in the same finish, send those schedules too — consolidating them into one order is usually where an overseas supply arrangement starts to pay for itself.
Talk to us about Santerson Partition Sliding Systems for your project, or browse the full product range to see what else comes off the same production line.