A long outdoor swim spa that pairs a full-length swimming channel with a separate hydrotherapy and relaxation pool is not an off-the-shelf purchase. It is a made-to-order water feature that has to fit a deck, a set of electrical supply limits and a maintenance routine before it is ever filled. The buyers who get accurate quotations fastest are the ones who arrive at the first conversation with the same information their supplier needs to price the job.

This guide sets out what to have ready before you contact SANTERSON about a long swim spa with a hydrotherapy relaxation area, and what we will ask you in return.

1. The site: dimensions, access and structure

Before anything else, send us the space the unit has to occupy. A swim spa of this type is delivered as a finished shell, not as parts assembled on site, so the delivery route matters as much as the final position.

  • Clear floor area. Length, width and the height clearance along the delivery path, including doorways, gates, stairwells and any overhead obstruction. Long-format shells in our range run to over ten metres in overall length on a narrow two-metre-plus footprint, so a tight side access can rule out a unit that would otherwise fit the terrace. Confirm the exact external dimensions of the configuration you are considering against its product page.
  • Load path. For a rooftop, balcony or first-floor terrace installation, we need the structural engineer's allowable point load and the position of supporting beams. A filled long swim spa carries a very heavy concentrated load, and this is the single most common reason a project stalls after quotation.
  • Base specification. Tell us whether the unit sits on a concrete slab, a bearers-and-joist deck, paving or a plinth, and whether you want it fully above ground, semi-recessed or flush with the surrounding finish. Recessed installations need an inspection opening on the equipment side.
  • Lifting and access. Crane lift, forklift, or manual carry? Note the floor level relative to the street, and any lift or hoist available in the building.

2. How the two zones will actually be used

The value of this format is that exercise and recovery happen in the same shell but at different settings. Be specific about who uses each zone, because it drives the specification.

  • Swimming zone. Is it for lap swimming against a resistance current, water walking, children's play, or general splashing? A continuous swim current needs a dedicated propulsion unit; casual length swimming does not.
  • Hydrotherapy zone. How many bathers at once, and do you want targeted jet massage for the lower back, shoulders and legs, or gentler all-round circulation? Jet count and layout follow from this.
  • Water temperature expectations. A warm therapy pool and a cooler swim channel are two different habits. Tell us whether you intend to run one shared temperature or hold the two zones differently.
  • Season of use. Year-round outdoor use calls for insulation, a heat pump and a cover; summer-only use does not.

3. Power, heating and water treatment

Electrical supply is the other specification that cannot be changed after manufacture. Total connected power for our long models sits in the mid single-digit to low double-digit kilowatt range depending on pump and jet configuration, so a standard domestic socket will not carry the load.

Have your electrician confirm and send us:

  • Supply type and phase — single or three phase — and available service capacity;
  • Voltage and frequency at the installation point;
  • Cable route, circuit size and RCD/earth-leakage protection;
  • Where the control panel may be mounted, within reach of both zones and protected from direct weather.

Then decide on heating and treatment. Catalogue-listed options across the range include heat pumps, UV sterilisation, ozone sanitation, sand filtration, additional water pumps, insulation and access steps. Tell us which you want quoted as standard and which as optional, so the figure you receive is comparable between models.

4. Shape, finish and how the spa meets your landscape

Where a standard rectangular shell does not suit the site, the range also covers customizable shape outdoor spas in square, round, oval and curved configurations, built on an acrylic shell with structural reinforcement. Send us:

  • A site plan or a simple sketch with dimensions and the position of seating, planting and privacy screens;
  • The exterior cabinet finish you want — grey, wood-look cladding or a matched colour — so the shell reads as part of the terrace rather than equipment placed on it;
  • Lighting intent: underwater LED fixtures, accent lighting and whether you want the water features shown on our long outdoor swim spa with hydrotherapy and relaxation pool page;
  • Integration details: steps, bench seating along the coping, handrails for the therapy zone, and a cover mechanism if the unit will be left uncovered between uses.

5. Comparing the long models side by side

To make the first conversation productive, shortlist two or three configurations rather than one. As an illustration of how the catalogue separates them:

ModelCatalogue dimensions (mm)Jet totalTotal powerFeatures shown
WS-S1010000 × 2200 × 1420767.65 kWWater jets, LED lighting, Ozone
WS-S1211740 × 2200 × 1470737.65 kWWater jets, LED lighting, Ozone
WS-SP6005900 × 2500 × 160069.35 kWWater jets, LED lighting, Ozone, Swim training system

Figures above are transcribed from the published catalogue page for each model. Included equipment, jet layout and electrical requirements vary by configuration and must be confirmed for the unit you order — a shorter shell configured around a swim training system draws more power than a longer shell built around jets.

6. Maintenance and running assumptions

Tell us how the spa will be looked after, because it affects what we specify. Water volume drives filtration and dosing; frequency of use drives pump duty; a covered, insulated shell changes heat retention substantially. Be ready to discuss:

  • Who performs routine cleaning and water testing — the owner, a groundskeeper, or a contracted service provider;
  • Where chemicals and spare parts will be stored on site;
  • Drain-down arrangements for servicing or relocation, including drainage points near the installation;
  • Whether the unit is part of a hotel, resort or clubhouse programme with scheduled maintenance windows.

7. Project roles, budget band and programme

You do not need a signed drawing pack to start an enquiry, but you do need the following:

  • A realistic budget band. It lets us propose a defensible configuration instead of guessing at your expectations.
  • The decision-maker and the technical contact. Naming the architect, builder or engineer who will sign off on structural and electrical questions shortens the loop considerably.
  • Target delivery month and any site milestone the spa has to precede or follow.
  • Delivery destination and incoterm preference. We arrange freight forwarding, customs paperwork and door-to-door delivery, so we need the port or site address early enough to plan packaging and container loading.
  • Quantity. A single villa unit and a multi-unit hospitality order are quoted on different terms; if you represent a hotel or residential developer, say so at the outset.

A note on local requirements. Building permits, barrier and fencing rules, electrical certification and pressure-regulation obligations differ by state and municipality. These are your local authority's responsibility to confirm, and we will not tell you that a configuration complies with a code we have not seen. Bring your certifier's questions to us and we will answer them technically.

8. A pre-enquiry checklist

  • Site photos plus measured length, width and access clearance
  • Structural allowance for the intended floor or deck (if elevated)
  • Electrician's confirmed supply: phase, voltage, circuit size, cable route
  • Intended use of the swim zone and the therapy zone, and expected bather count
  • Preferred heating, sanitation and filtration options
  • Cabinet finish, lighting intent and steps or handrail requirements
  • Maintenance responsibility after handover
  • Delivery address, target month and quantity
  • Budget band and named technical contact

What happens next

With those items in hand, we can move straight to specification rather than a round of open questions. As a one-stop furniture and building materials supplier working on villa, hospitality and residential projects, we handle the spa as one element of a wider outdoor package — loungers, pergolas, exterior cladding and poolside cabinetry can be specified together so finishes match across the site. If your project needs bespoke dimensions or a non-standard shell geometry, that goes through our custom and OEM process with drawings confirmed before production begins.

Send us your site information

Email the checklist above to santerson@qq.com, or reach us on WhatsApp at +86-13928214007 and ask for Phillip. Include a site photo and your measured dimensions, and we will come back with a configuration and a specification sheet rather than a generic price list.