A swim spa of this size sits between two project worlds: it is a piece of equipment with pumps, jets and a control system, and at the same time it is an outdoor structure that has to be delivered, lifted, set on a base, connected to power and water, and then kept running for years. That double nature is exactly why two buyers can look at the same model and end up specifying different things. Before you lock in Outdoor Swim Spa WS-PC06ST, these are the project details that actually change the decision.
What the catalogue already fixes for you
The published record for this model is a good starting point, because it tells you what is standard rather than optional. The catalog lists an overall size of 5900 × 2400 × 1470 mm, one control system, one swim training system, one filter pump, six water jets and four LED lights, with a total power figure of 6.55 kW. Water jets, LED lighting, ozone and the swim training system are shown as the features of this configuration.
Two things in that list deserve attention from anyone preparing a quotation request. First, the water pump is not listed for this model in the captured specifications, so it belongs on your confirmation sheet rather than in your assumptions. Second, 6.55 kW is a total power figure for a configuration — what drives it is how the spa will be heated and how long the jets and pumps run, which is a site question, not a catalogue question.
Confirm before ordering:
- Which equipment set is included in your quotation, and which items are listed as options
- The supply configuration for the water pump on this model
- The electrical supply available at the installation point, and how it matches the selected configuration
- Whether heat pump, insulation, UV sterilisation, sand filtration and steps are quoted in or left out
Site access and the footprint you actually have to work with
Footprint is where many swim spa projects get expensive late. The 5900 × 2400 mm plan area plus a water depth of 1470 mm means you need clearance for the unit itself, for access around it for maintenance of the filter pump and control system, and for a route from the delivery vehicle to the final position. A terrace that fits the shell on a drawing may not fit a lifted assembly through a side gate or over a boundary wall.
This is also where the same platform gives you choices. If your available length is shorter, Outdoor Swim Spa WS-PC05ST is recorded at 5000 × 2400 × 1470 mm with the same six jets and four LED lights. If you have more room and want longer swim length, Outdoor Swim Spa WS-PC06ST-L is recorded at 6390 × 2400 × 1470 mm. Comparing the three on site access, not just on the shell dimensions, is usually what settles the model.
How the spa will be used drives the equipment list
A private villa owner who swims against the current three mornings a week and a hospitality project where guests use the spa for hydrotherapy in the evening are not specifying the same machine. The jet count, the swim training system and the LED lighting serve both, but duty cycle changes what you should insist on being confirmed.
- Swim-led use: the swim training system is the heart of the specification. Ask how it is set up and adjusted, and make sure the usable internal length matches the height of the people who will use it.
- Hydrotherapy-led use: the six jets, their layout and how they are controlled matter more than swim length. Confirm what the control system covers in your configuration.
- Shared or commercial use: filtration and water treatment move to the front. Ozone is shown as a feature of this model; UV sterilisation and sand filtration appear in the catalogue's optional accessories, so decide whether they are quoted in for your duty level.
- Cool-climate or year-round use: heat pump and insulation are listed options, and both affect running load. Ask for the heating arrangement in writing instead of assuming it is standard.
Where the surrounding design has to meet the spa
A swim spa rarely arrives as an isolated item on a project list. It sits next to all-weather outdoor seating, under or beside a pergola, and often against a clad wall or fence screen. When the same supplier is already producing the deck-level finishes, screens and poolside furniture around it, coordination of levels, drainage and access becomes one conversation instead of three.
If your site calls for a non-rectangular layout — a curved terrace edge, an alcove, or a spa set into a raised platform — the Customizable Shape Outdoor Spa line covers square, round, oval and curved designs with an acrylic shell, which is a different route from selecting a fixed catalogue model. Choosing between a standard model and a customised shape is one of the earliest decisions to make, because it changes drawings, base preparation and lead time.
Procurement details that decide whether delivery is smooth
For an imported project item, the commercial terms matter as much as the specification. Packaging and container loading, freight by sea, air or rail, customs paperwork such as commercial invoices, packing lists and certificates of origin, and door-to-door delivery to site are all part of how logistics is arranged. For an overseas villa or resort project, ask who prepares the import documents, where the goods land, and who takes responsibility for the last leg to the installation position.
Then close the loop on the end of the job: installation and after-sales support, including inspection and snags, spare parts availability for pumps, jets, lights and the control system, and what is covered under warranty. A swim spa is a maintenance item — filter pump, jets, lighting and controls all need access and occasional replacement — so the spare-parts conversation belongs in the purchase decision, not after the first fault.
A short pre-order checklist for WS-PC06ST
- Delivery route and lifting access from vehicle to final position
- Base or plinth prepared to receive the shell, with drainage arranged around it
- Electrical supply confirmed against the selected configuration
- Included versus optional equipment stated line by line in the quotation
- Control system scope, jet layout and swim training setup described in writing
- Spare parts, warranty terms and support contacts named before shipment
Specifications quoted above are transcribed from the published catalogue entry for this model. Included equipment, options and electrical requirements vary by configuration, so confirm them for your quotation before ordering.
Talk to us about your project
Send us the site photos, the available length and width, the electrical supply at the installation point and how the spa will be used. We will confirm which configuration of Outdoor Swim Spa WS-PC06ST fits — or whether a shorter, longer or customised shape is the better answer — together with the surrounding outdoor furniture and finishes in one package.
Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or through our contact page.