Integrated TV panels look simple on a drawing: a screen recessed into a wall of joinery, some concealed storage, a strip of lighting. In production they are one of the least forgiving items in a fit-out, because the panel package has to absorb the television, the cable routes, the ventilation, the bracket and the finish detailing at the same time. The specification conversation you have before production is what decides whether the finished wall reads as built-in joinery or as furniture that arrived slightly wrong.

Santerson Integrated TV Panels are made to order, so almost every dimension, material and detail is a decision rather than a catalogue choice. The list below is the set of questions we ask project buyers, designers and contractors when a media wall enters the schedule, together with what each answer changes downstream.

Start With the Screen, Not the Panel

Everything else hangs off the display. Before discussing veneers or reveals, confirm the exact screen you intend to install, or at minimum a shortlist of two or three models with published dimensions.

  • Screen size and outer dimensions, including depth behind the bracket. A 65-inch and a 75-inch panel change the opening, the supporting structure behind it and the visual proportion of the whole wall.
  • Mount type: fixed flush, tilt, or full-motion arm. An arm that pulls the screen away from the wall needs a deeper recess and a clear path for the cable loom.
  • Bezel and finish of the set itself. A black bezel against a dark timber veneer behaves very differently from the same set against a pale lacquer surround.
  • Whether the screen is supplied by you or sourced with the panel package. This affects how the recess is dimensioned and who signs off the bracket fixing.

If the screen has not been selected yet, we design to a reserved opening with a stated tolerance and record it as an assumption on the drawing. That keeps production moving while still allowing a model change before final sign-off.

Layout: Recess, Frame or Concealment

The same wall can be resolved in several ways, and each has cost and site consequences.

ApproachWhat it looks likeWhat to decide early
Flush recessScreen sits inside a framed opening, nearly level with the surrounding panels.Recess depth, bracket blocking, ventilation gap, access to connectors.
Surface-mounted within a panel fieldPanels build out around the screen; the set projects slightly.Cable channel route, shadow line detail, cleaning access behind the set.
Sliding or pivoting coverThe screen is hidden when not in use by panels on a track or hinge.Track type, panel weight, clearance for the screen when closed, duty cycle.
Full-height media wallScreen integrated into floor-to-ceiling storage and display.Load path to the slab, door and drawer alignment across the full height.

Where a screen needs to disappear completely, our Sliding Panel TV Systems are specified with the track, panel material and opening direction fixed at the drawing stage. Where the brief calls for storage across the whole wall rather than a single feature, Full Height Media Walls change the structural conversation, because the joinery carries its own weight over a greater height and door alignment has to be set out from the floor level.

Materials and Finish

Media walls are usually specified in the same palette as the surrounding cabinetry, so treat them as part of that schedule rather than a separate purchase.

  • Substrate: engineered board for flat fields and carcasses, solid timber where edges are exposed and profiled.
  • Surface: wood veneer, matte or high-gloss lacquer, textured laminate, glass, or stone-look surfaces. Each takes light differently across a large area, so a sample at panel scale is worth requesting rather than a small chip.
  • Edge treatment: matched veneer edge, solid timber lipping, or metal trim. This is where cheap work becomes obvious on a wall you look at every day.
  • Reveal and shadow gaps between panels: state the width you want, in millimetres, on the drawing.
  • Sheen and colour match against adjacent wardrobes or kitchen cabinetry from the same project. Order the media wall and the rest of the joinery together if an exact match matters.

For rooms where sound reflection is a problem — a large living volume, a hard floor, a glass wall — acoustic panels in the paneling range can be worked into the same field so the media wall does the acoustic job as well as the visual one.

Lighting and Services

This is the area where late changes are most expensive, because the panel has to be machined for it.

  • Integrated LED: niche lighting in open shelving, toe-kick lighting, or a lit reveal around the screen. Confirm the profile, colour temperature and where the driver sits — drivers need a reachable location.
  • Backlit feature wall as a design element in its own right; see our Backlit Feature Walls for that configuration.
  • Cable routes: how many HDMI, power and data runs, and whether they are trunked behind the panel or run in site conduits. Agree who pulls the cables and when.
  • Sockets and connection points inside the recess: position them to the millimetre so the bracket does not sit on a socket.
  • Ventilation: heat from the set and from enclosed equipment needs an escape path, particularly in a closed recess.
  • Remote control and sensor sight lines if equipment is being hidden behind doors or panels.

Where the brief wants lighting as part of the furniture rather than a wall treatment, Integrated LED Media Units cover the lower-unit version of the same detail and can be paired with a panel field above.

Storage, Hardware and How the Wall Will Be Used

A media wall that photographs well but cannot hold a games console, a soundbar, board games and a stack of blankets will be resented within a month. Specify use before aesthetics:

  • Open versus closed ratio. Open shelves show clutter; too many doors make the wall heavy.
  • Door mechanism: hinge, lift-up, sliding or push-to-open. Each needs a different clearance in front of and around the panel.
  • Shelf spans and loading. Long shelves over a media run will sag if the span is not stated; tell us what goes on them.
  • Cable management for equipment bays — ventilated backs, cut-outs, or grommeted shelves.
  • Floating versus floor-standing. A Floating TV Unit from the same collection gives the light, cantilevered look but needs solid blocking in the wall behind it and a confirmed load rating; that blocking is a site task and must be on the contractor's programme.
  • Child safety and door stops in family rooms.

Site Conditions, Tolerances and Installation

The questions below decide whether installation is a half-day job or a week of snags:

  • Wall construction: stud, brick, concrete or a framed partition. Fixings and blocking differ for each.
  • Floor and ceiling levels. Full-height panels are set out from a datum line; an unlevel slab shows up as a tapering gap at the ceiling.
  • Finished floor level confirmation — the number you give us must be the number on site, not the design intent.
  • What happens to skirting, architraves and cornices where the panels land.
  • Division of responsibility: who supplies and installs the screen and bracket, who runs the cables, who makes good around the panel edges.
  • Access and packaging: lift dimensions, stair widths, and whether large panels need to be crated in sections for the site.
  • Sequence on programme: panels go in after wet trades, painting and flooring are complete, but before soft furnishing.

For projects where the media wall is one line in a wider joinery package, our custom and OEM service covers bespoke finishes, textures and prototyping alongside the panel itself, so the wall can be produced against the same drawings as the wardrobes and cabinetry. If you would rather have the whole fit-out coordinated from one supplier, the turnkey solutions route runs design, production, delivery and installation as a single scope.

What to Send Before We Quote

  • A dimensioned elevation of the wall, with finished floor level and ceiling height.
  • The screen model or shortlist, plus mount type.
  • Equipment list: soundbar, console, decoder, speakers — with their locations.
  • Finish reference: sample code, veneer species, or a photographed reference from the project palette.
  • Storage wish list and the open/closed split you want.
  • Lighting intent, including colour temperature preference.
  • Site constraints: wall build-up, access route, installation window.

Integrated TV panels are made to measure for each project. Dimensions, materials, hardware and electrical details are confirmed with the client on drawings before production, so send the screen selection and wall elevation as early as you can — that is where the savings are.

Common Questions

Can the panel be made for a television I have not bought yet?

Yes, with a reserved opening and an agreed tolerance band. We record the assumed screen depth on the drawing; if your final set is deeper than that assumption, the recess has to be revised before machining.

Can the media wall match my kitchen or wardrobe finish exactly?

Order them together and specify the same substrate, surface and edge treatment. Veneer batches differ, so a match across separate production runs cannot be guaranteed.

Do you install on site?

Installation and after-sales support are part of our project scope for coordinated packages. For supply-only orders we provide fixing details and setting-out drawings so your contractor can install to the same specification.

What is the lead time?

It depends on the finish, hardware and quantity in the package, and it is confirmed at quotation once drawings are settled. Confirm dates against your site programme rather than assuming a standard figure.