A pocket door is one of the few openings in a home that has to be engineered before the wall closes around it. Before sending an enquiry about Santerson Glass Pocket Doors, collect the information below so the quotation you receive matches what your site can actually accommodate.

Why pocket doors need more preparation than a hinged door

A hinged door is measured after the opening exists. A pocket door has to be designed before it does: the leaf slides into a cavity inside the wall, so the wall build-up, the structural framing, the floor finish and any services running through the partition all have to be coordinated around the sliding hardware. That is why enquiries that arrive without opening dimensions tend to stall: there is nothing yet for the factory to price.

The product page for these doors describes them as made-to-measure glass pocket doors for residential projects, where finish, layout and dimensions are specified for each space. In practice that means your enquiry is the input that sets everything else in motion, and the more complete it is, the fewer rounds of clarification you will need.

1. Room dimensions and the wall build-up

Before contacting us, have these figures ready for every opening you want to treat:

  • The clear width and height of each opening, plus the finished floor level.
  • Total wall thickness and how much of it you are willing to give up to the pocket. The leaf plus its frame needs a cavity deep enough for the door to disappear into.
  • Whether the partition is new construction or an existing wall being opened up, because that changes what can be built behind the plasterboard.
  • The height of the ceiling and whether the door should run full height or stop below it.

If you have drawings, even a marked-up floor plan with dimensions written on it, attach them. A plan lets us check the pocket against furniture positions and circulation instead of leaving the clash to be discovered at installation.

2. Glass type, frame and finish decisions

Glass pocket doors are specified in three layers, and being clear about each one shortens the conversation considerably:

  • Glass. Clear, frosted and smoked glass behave differently in a room. Frosted and smoked leaves keep light moving between spaces while screening the view; a clear leaf does neither and is normally chosen purely for openness.
  • Frame. Slim metal frames read as contemporary, while timber-framed leaves can be matched to Santerson Wood Veneer Pocket Doors or to your joinery so the doors and cabinetry share one tone.
  • Finish. Metal colour, veneer species and hardware finish should be decided against the flooring and ironmongery already specified for the project, not in isolation.

Where you have not decided yet, say so in the enquiry. Send a photograph of the room and the finishes you are considering, and we can propose configurations that suit the space rather than guessing at them.

3. How many leaves and which way they travel

State the number of leaves per opening and whether each one slides from the left, from the right, or both ways. A single-leaf pocket needs one cavity; a double-leaf opening needs two, which doubles the wall zone you have to reserve. If an opening is wide, say so: a pair of sliding leaves is often easier to build around than one oversized leaf.

It also helps to note what sits on either side of the opening: a wardrobe run, a mirror, a radiator or a light switch all affect where the pocket can be placed and where the track can be fixed.

4. Hardware expectations and use pattern

Describe who uses the door and how often. A study door opened twice a day and a bathroom or pantry door opened dozens of times a day put different demands on the track, hangers and soft-close arrangement. Note whether you want a soft close, a flush pull or a surface handle, and whether the leaf needs a lock or a privacy bolt.

For homes with children, give the expected leaf size as well. Heavier glass leaves need hardware rated for that weight, which in turn affects what the wall framing has to carry.

5. Installation responsibility and site sequence

Decide in advance who will install the doors, because it changes what we send. If your local builder or joiner is fitting them, we need to agree on fixing details and on the framing they should build before the wall is closed. If you would rather we handled installation and after-sales support as part of a wider package, state the site location at the outset so we can confirm what that covers.

Sequence matters more than most clients expect. The pocket frame and track have to be set, levelled and packed before the wall is lined out; once plasterboard is up, correcting a crooked track means opening the wall again. If your trade programme has the glazier arriving before the plasterer, flag that in the enquiry.

6. Delivery, packaging and access

Glass leaves travel badly when they are packed as ordinary joinery. Have the delivery address ready, along with the floor level of the site, whether there is a lift or only stairs, and any restriction on vehicle size. For apartments and upper-level villas these details determine the crating and handling we plan for.

Our logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Import terms, duties and transit times are confirmed case by case, so give us the destination port or address and we will quote the arrangement that fits rather than assume one.

7. Budget range and programme dates

A budget band is useful even if it is wide. It tells us whether to propose a slim framed glass configuration or a heavier veneer-and-glass build, instead of sending options you will never order. Give us the date the doors must be on site as well, and work backwards from it. Made-to-measure items are produced to your dimensions, so an enquiry sent well ahead of the fit-out stage keeps the specification from being cut short by a trade programme that has already moved on.

8. What we will send back

With the information above in hand, an enquiry usually comes back as a proposal rather than a list of questions: recommended configuration for each opening, dimensions and materials to confirm, packaging and delivery arrangement, and installation or after-sales support where that is part of the scope. You should be able to read it against your drawings and sign it off without another round of measurement.

Please note: these doors are made to order, so every dimension, glass type and finish on the quotation needs confirming before production starts. Where a site condition is uncertain, such as an existing wall of unknown thickness, raise it in the enquiry instead of assuming a standard build will fit.

Related options worth asking about in the same enquiry

Doors specified together tend to be produced and shipped together, which simplifies both freight and site handling. If the project also needs openings that do not require a pocket, ask about Glass Sliding Doors for surface-mounted applications, or Santerson Decorative Interior Doors where a hinged leaf is acceptable. The same drawings and finish schedule usually cover all three.

A checklist to run through before you send the enquiry

  • Opening width, height, wall thickness and finished floor level for each door.
  • New build or renovation, and who is building the pocket framing.
  • Glass type, frame material and finish preference, or photographs if you have not decided.
  • Number of leaves and sliding direction for each opening.
  • Hardware: soft close, pull type, lock or privacy bolt.
  • Delivery address, access conditions and the date the doors are needed on site.
  • Budget band and the trade programme the doors have to fit into.

Send us your drawings

Email your plan, a dimensioned sketch or photographs of the space, and say which rooms you are considering glass pocket doors for. We will come back with a configuration proposal and the details that need confirming before production.