A swim spa arrives on a flatbed, gets lifted into place, filled and switched on. Then the arguments start: who was supposed to run the isolator, why the slab is 40 mm short of the footprint, and where the filter pump is meant to be reached from with a wet cloth in hand. An Outdoor Swim Spa WS-S06C is a large, powered, water-filled structure sitting on someone's property, and the difference between a clean handover and an expensive one is almost entirely the paperwork and coordination done before the crane arrives. Below is what we ask project teams to settle in writing before the spa ships.

Start From the Footprint, Not the Brochure

The WS-S06C is catalogued at 5880 × 2380 × 1400 mm. Those are shell dimensions, not a clearance envelope. Your installation plan should record three separate measurements and keep them apart:

  • Structural footprint — the slab or plinth the shell actually bears on, sized with a margin beyond the 5880 × 2380 mm outline so the perimeter trim and any steps sit on solid ground rather than overhanging.
  • Access envelope — the path the unit travels from the truck to its final position, including the tightest corner, gate width, overhead cable or branch line, and the turning radius of whatever lifting equipment is used on site.
  • Maintenance envelope — the space a person needs to open the cabinet, lift a filter cartridge out, and stand next to the control system without standing in a puddle.

Recording all three prevents the most common site surprise: a spa that fits on paper but cannot be serviced without moving a planter box or draining the deck. If the location is tight, decide now whether the unit should be positioned before the surrounding paving, pergola or poolside furniture goes in. Retro-fitting a 5.9 m shell through finished landscaping costs far more than sequencing it correctly.

Confirm the Specification You Are Actually Installing

Configurations in this range differ, and the electrical and plumbing plan follows the configuration, not the model name. Before any trades are briefed, get a written specification sheet for the exact unit on your purchase order and check it against these items:

Item shown in the catalogueCatalogue entry for WS-S06CWhat to confirm before installation
Overall dimensions5880 × 2380 × 1400 mmWhether the delivered unit matches, and how much clearance each side needs for steps and access
Total power9.95 kWSupply capacity at the panel, cable size, protective device, and whether a heat pump is added on top of this figure
Water pump3 pcsCircuit grouping and whether all pumps run simultaneously or in stages
Filter pump1 pcLocation relative to the skimmer and to a drain for routine cleaning
Jets33 pcsWhich jet bank is served by which pump, so commissioning can be tested seat by seat
Control system1 setWhere the panel is mounted and who can reach it without entering the water
LED lighting2Low-voltage supply and any replacement access required
OzoneListed featureWhether ozone is included in your configuration, and what that changes for dosing and ventilation of the equipment bay
The catalogue also lists optional accessories — UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each one moves an electrical or plumbing decision. Anything not on your confirmed specification sheet should not appear in the trades' scope, and anything on it must be reflected in the drawings.

Electrical Work Belongs to a Licensed Local Contractor

The plan needs a named electrical contractor and an approved drawing before the spa is placed, because the unit's position determines cable runs. Points worth settling early:

  • The supply arrangement your local regulations require for a permanently installed outdoor appliance — circuit rating, disconnect location, earthing and bonding, and any residual-current protection mandated in your jurisdiction.
  • Whether the quoted total power is the full connected load including an added heat pump, or whether the heat pump needs its own circuit. Ask us for the wiring diagram of the specific configuration; do not size a cable from a catalogue line.
  • Where the isolator and control panel sit in relation to water splash zones and to walking paths.
  • Lighting and any ancillary circuits on the same deck, so one trench serves everything rather than two.

We supply the equipment and its technical documentation. Compliance with local wiring rules, permits and inspection is done by your contractor in your country — that boundary should be written into the plan, not assumed.

Base, Drainage and Water

A filled spa of this size is a very heavy point load. The structural base — slab, reinforced plinth or an engineered deck — should be designed by someone local who can see the ground conditions, with the catalogue footprint as the input rather than guesswork. Two items to show on the same drawing:

  • Drainage around, not under. Overflow, backwash from filter cleaning and rainwater runoff all need somewhere to go. A fall away from the shell, a channel drain or a collection pit, and a route to an acceptable discharge point.
  • Fill and drain provisions. A tap within reach for filling, and a plan for where the water goes during maintenance or a full drain — not onto a neighbour's boundary.

If your configuration includes insulation or an enclosed equipment bay, note that in the base detail too: some bases are built with a service void, and it is much cheaper to form one than to cut one later.

Delivery, Lifting and Site Access

Logistics planning for a swim spa is really lifting planning. Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking; what it cannot decide for you is how the unit leaves the vehicle on your side. Put these in the plan:

  • Vehicle size that can actually reach the site, and where it will be parked while the crane or forklift works.
  • Lifting method, lift points and a competent rigging supervisor — agreed with us in advance so the cradle and any protective packing are correct.
  • Ground conditions on the delivery date: soft ground, overhead lines, and any temporary protection for paving already laid.
  • A dated sequence. The electrician, the base contractor and the lifting crew need to be on site in the right order, with the unit's arrival fixed between them.

Commissioning and Handover Documents

Installation is not finished when water is in the shell. A handover pack protects whoever maintains the spa in year three, and it should be listed as a deliverable in the plan:

  • Confirmed specification sheet for the delivered configuration, signed against the purchase order.
  • Wiring diagram and circuit schedule for the installed supply.
  • Filtration and ozone or UV settings as commissioned, with the dosing regime agreed with the operator.
  • A jet-by-jet function test record: pumps staged correctly, temperature setpoint holding, LED circuits working, control panel responding.
  • Contact route for spare parts and warranty claims, with the model and serial recorded.

Our installation and after-sales support covers on-site installation, inspection of outstanding items, warranty coverage, spare parts and ongoing maintenance. For projects we support on site, the commissioning record above is what we work from; for installations handled by your own contractor, send us the same record so any later support request does not start from zero.

Where the Spa Sits in a Wider Outdoor Package

On villa and resort projects the swim spa is rarely an isolated purchase. Deck surfacing, shade structures, loungers and outdoor dining all interact with the maintenance envelope described earlier, which is why it works better inside a single turnkey project than as separate orders placed months apart. The same coordination applies to swim spas and pools in a range where shell sizes and equipment layouts vary considerably: fix the model, then design around that model's real dimensions.

For projects where the spa is one line in a larger package, our custom and OEM service and design coordination cover material selection, product specification and site coordination across the whole scope, so the deck detail and the equipment bay are drawn once rather than twice.

A Short Pre-Installation Checklist

  • Confirmed specification sheet for the exact unit, including every optional accessory.
  • Structural base drawing sized from 5880 × 2380 mm plus working clearance, signed off locally.
  • Electrical design showing supply capacity against the 9.95 kW figure and any added heat pump, with isolator and panel locations.
  • Access route surveyed, lifting method agreed, delivery date fixed between trades.
  • Drainage, fill point and discharge route shown on site drawings.
  • Maintenance clearance protected from later landscaping and paving decisions.
  • Commissioning tests defined, with a handover pack named as a deliverable.
  • Local permits, wiring compliance and inspection assigned to a named local contractor.

Catalogue dimensions, power figures and equipment counts quoted above are taken from the published product listing for this model and apply to the standard configuration. Confirm them against your order's specification sheet before any trade is briefed; options such as heat pumps, UV sterilisation or sand filtration change both electrical load and equipment layout.

Send us your site drawings and target delivery window

Tell us the model and configuration you are specifying, where the project is, and when the base needs to be ready. We will return the confirmed specification sheet, wiring documentation and a delivery sequence your trades can build to — with design and site coordination available when the spa is part of a larger villa or hospitality package.