Closet sliding panels are made to measure, so a meaningful price can only come after the opening sizes, layout and finish are known. This guide walks through what a SANTERSON estimator needs from you, how the enquiry moves through design and quotation, and which details keep the numbers comparable when you are still shortlisting suppliers.
Start From the Product Page, Not From a Guess
Our Santerson Closet Sliding Panels are listed under the Sliding Panel Systems range and sit within our wider interior fixtures programme for villas, apartments and hospitality rooms. The listing is deliberately configurable: dimensions, layout and finish are specified per project rather than chosen from three fixed sizes. That is why we do not publish a unit price. A quote is calculated from the panel area you need, the track and hardware set that carries it, the core and surface material, and how many sets travel in one shipment.
If your drawing already shows a run of wardrobes or a room divider, send it as it is. A sketch with dimensions on paper photographs perfectly well; we re-draw it into production drawings before anything is cut.
Information That Makes the Quote Accurate
The faster list below is the one our estimators work from. Anything you can supply in the first message removes a round of questions.
| Item | What to send | Why it changes the price |
|---|---|---|
| Opening size | Width, height and depth of each run, plus floor-to-ceiling condition | Panel area and track length drive material use; out-of-square walls need site verification |
| Layout | Number of panels, stacking direction, whether the opening is a closet front or a room divider | Two-panel and four-panel sets use different hardware and different numbers of guide rails |
| Core and surface | Preferred board core, and finish such as laminate, lacquer, veneer or glass | Surface material is the largest single cost variable across this range |
| Hardware | Track type, handle or profile preference, soft-close requirement | Heavy panels need load-rated hardware; concealed profiles cost more than standard handles |
| Quantity and location | Sets per project, delivery address, port of discharge | Packaging, container loading and freight are calculated per project, not per panel |
| Programme | Target installation month and any site handover date | Production slots and shipping method follow the programme you give us |
Related Panel Systems Worth Pricing Together
Closet fronts rarely stand alone on a drawing. Where the same finish continues elsewhere in the project, we produce those items in one batch so colour and grain match. Clients commonly combine closet fronts with Santerson Acoustic Sliding Panels for meeting rooms and bedroom dividers, or with Santerson Textured Sliding Panels where the panel face is meant to read as a decorative wall. For wardrobe fronts specifically, our sliding door wardrobe range covers glass, mirror and matte finishes at glass sliding door wardrobes.
Because these items share boards and finishes, sending one enquiry for the whole set of panel work usually costs you less than three separate orders placed months apart.
How the Enquiry Moves: Brief, Drawing, Quotation, Production
Our interior design services team handles panel enquiries in the same sequence as other built-in work. First comes the project brief and space planning, then concept and layout proposals with drawings, then a quotation once details are confirmed. Only after you approve the drawing do we move to production, packing and shipment.
Two checkpoints matter most on sliding panels. The first is the dimension check: an opening measured off old joinery is often a few millimetres out of plumb, and the drawing is where that gets resolved. The second is the finish sample. A laminate named "oak" in a catalogue can read very differently against your flooring, so we confirm the actual surface before cutting.
Where you are supplying your own design, our custom and OEM service works from your drawings directly, including bespoke finishes, prototyping and flexible order quantities for mixed villa or apartment schedules.
What the Quotation Covers
A SANTERSON quotation for closet sliding panels itemises the panels and their cores, the surface finish, tracks and hardware per set, and packing to the agreed standard. Where you ask for a delivered price, our logistics and door-to-door delivery service adds freight by sea, air or rail, export paperwork and container loading. Terms, duties and local delivery arrangements are confirmed per destination rather than assumed, so please state your Incoterms preference in the enquiry.
If you are comparing suppliers, ask each one to quote on the same three lines: panel construction, hardware make and load rating, and packing standard. Quotes that look close on price often separate once those lines are read side by side.
Delivery, Installation and After-Sales
Panels ship flat-packed with labelled sets and hardware kits matched to each opening. Our installation and after-sales support page describes on-site fitting, inspection and snag lists, plus spare parts and maintenance for later use. For projects without a local joiner, tell us in the enquiry whether you want fitting guidance, an installer visit or simply clear assembly drawings for your own trades.
Before you send: confirm opening widths at three heights, note the floor finish so track heights can be set correctly, and state whether lighting is to be recessed into the panels. Recessed lighting changes panel thickness and must be planned before production.
Sending the Enquiry
Send drawings or photographs, the six items in the table above, and your target installation month through our contact page, or reach us on WhatsApp at +86-13928214007. Mention the project location and whether the panels are for a private residence, a villa development or a hotel room floor, since those three cases use different hardware specifications and packing standards.
Request a quote: Santerson Closet Sliding Panels: send your opening dimensions, layout and finish preference to our team, and we will return production drawings with an itemised quotation.