A glass wall that slides is one of those products that looks simple in a rendering and turns complicated on site. The panel has to travel, the track has to carry it, and the opening has to stay square enough for both to work. Our team specifies Santerson Glass Sliding Panels made to measure for each space, which means the quality of your enquiry decides how quickly we can return a workable drawing and an accurate price. The list below is what we ask for on a typical villa or apartment wall-system project, and why each item changes the outcome.
Why Sliding Panels Are Specified Differently From Fixed Wall Cladding
Fixed panelling only has to fit. A sliding system has to fit and then move along a defined path for years, carrying glass. That single difference is why we cannot price a run of panels from a room name or a photograph. Panel weight, travel direction, the number of leaves and where each leaf parks all feed into the track, the hardware and the structure above the opening.
The same logic applies across the rest of the partition sliding systems family: a partition that divides a flexible room, a closet front that hides storage, or an acoustic panel used to close off a meeting area all start from the same set of measurements and inputs. Choose the system type first, then send us the numbers.
The Measurements We Need
| Input | How to record it | What it decides |
|---|---|---|
| Opening width and height, at three points each | Measure finished-wall to finished-floor at the left, centre and right of the opening; repeat vertically. Note the difference if the three readings disagree. | Panel size, whether packing is needed, and how much adjustment the site team will have on site. |
| Finished floor level and finished wall faces | State which surfaces are final: screed plus the actual floor covering, and plaster or cladding rather than the bare structure. | Total drop of the panels and whether the bottom guide can sit proud of the floor. |
| Clear height above the opening | Distance from the top of the opening to the ceiling, bulkhead or duct that sits above it. | Whether a surface-mounted track is possible, or whether the track must be recessed into a box we build with you. |
| Pocket or parking zone | Length of wall the panels stack against when open, and any return corner at the end of that run. | Number of leaves, stacking depth and whether panels need to be equal widths. |
| Obstructions inside the opening | Sockets, switches, skirting changes, floor thresholds, heating pipes, door architraves. | Bottom guide detail and the effective clear opening once the panels are open. |
| Adjacent materials | What the panels meet at each end: plasterboard, stone, timber joinery, an existing frame. | Fixing method, junction trims and who supplies the preparatory work. |
Send dimensions in millimetres and tell us the units once rather than assuming. Where you can, attach a marked-up plan or section with the opening dimensioned on it; a sketch with numbers is worth more to us than a clean drawing with none.
Project Inputs That Shape the Panel Build
How the space will actually be used
Tell us the room and the daily routine in it. A panel separating a living area from a study is opened twice a day; a closet front is opened dozens of times; a partition closing a guest suite from a terrace sees weather at the threshold. Usage drives hardware selection, leaf width and how much we build for ease of handling rather than for appearance alone.
Glass type and safety requirements
Glass sliding panels are configurable listings on our site because glass is chosen per project. Tell us the glazing you want and the safety expectation for that location — a panel at floor level in a family bathroom, a screen next to a stair landing and a decorative insert in a bedroom do not carry the same requirement. Where your architect has specified a build, send the specification sheet; where they have not, tell us the location and we will confirm what the configuration supports before production.
Frame, finish and texture
Finish options in this range run from clear and frosted glass fronts to textured surfaces. If the panels have to match other joinery on the project — wardrobes, concealed doors, wall panelling — send the reference: a laminate or lacquer code, a veneer sample number, or a photograph of the surface you are matching under daylight rather than downlights.
Acoustic expectation
If separation matters, say so at enquiry stage and state what you want to hold back: voices from an office, a television in a lounge, noise from a corridor. Acoustic performance depends on the selected configuration and the detailing at the perimeter, so it belongs in the drawings rather than being discovered at handover. Where sound separation is the primary requirement, Santerson Acoustic Sliding Panels are the starting point for that conversation.
A Practical Sequence From Enquiry to Installation
- Send the brief. Room, opening dimensions at three points, finished levels, pocket length, usage, glazing preference and finish reference.
- We return a layout. Leaf count, widths, stacking arrangement and track position, with any questions on the numbers you sent.
- You confirm the drawings. Site team checks the openings against the drawing and confirms which preparatory work sits with the builder.
- Production. Panels made to measure with the selected material and finish.
- Delivery and installation. Panels travel with their hardware, and the opening is ready for them on the agreed date.
Two site conditions cause most rework, and both are avoidable before production: openings measured off the bare structure while floor and wall finishes were still to come, and pockets that turn out shorter than the stack requires. Check those two items yourself before you sign off a drawing.
Where the panels also have to hide something when closed — a television, storage, a doorway into a service area — we design them as part of a wider wall build rather than as a stand-alone item. See Santerson Sliding Panel TV Systems and Wall Panel Systems for the same made-to-measure approach applied to those situations.
What Happens When the Inputs Are Missing
With only an opening width, we can draw one layout and quote one price, and that is where most misunderstandings begin. The leaf widths may not suit the pocket, the track may clash with a bulkhead nobody measured, and the glass build may need changing after production has started. A second round of measurements costs a day on site; a changed panel width after cutting costs a delivery date.
If your project carries several wall systems across different rooms, send them together. Grouping closet sliding panels, the partition run and the glass screens into one enquiry lets us keep finishes and hardware consistent, and gives you one set of drawings to check instead of three.
Send us your openings
For a quotation on glass sliding panels or any panel system in this range, send the room name, the dimensioned opening, the finished levels and the finish you are matching. As a one-stop furniture and building materials supplier, we produce these panels alongside the joinery, doors and wall finishes they sit against, so the whole wall arrives on one drawing set — see Turnkey Interior Project Solutions for how that works on villa and hospitality projects.