A two tone sliding door wardrobe looks simple on a rendering: two flat panels, one light and one dark, gliding across an opening. On site it is a built-in element that has to line up with the wall, the skirting, the ceiling and the flooring around it. That is why the manufacturer you choose matters more than the finish you pick. The steps below are the ones we use when buyers, designers and builders send us wardrobe drawings for quotation, and they work whether you are fitting out one apartment or a whole villa package.

Start with the opening, not the door

Sliding wardrobes fail most often at the track. Panel height is limited by the load the upper track can carry and by how much clearance the ceiling build-up leaves above the opening. Before you ask any manufacturer for a price, fix four numbers: clear width and height of the opening, depth available behind the doors, finished floor level, and the position of the skirting or architrave that the panel has to pass.

A supplier who quotes from a single elevation drawing, without asking for those dimensions and the wall build-up, is quoting a catalogue item rather than your opening. Ask each shortlisted manufacturer to confirm the maximum panel size their hardware supports for the height you need, and what they do when the floor is not level within tolerance.

Check how the two-tone scheme survives production

Two tone means two different surfaces meeting on one carcass, and each material behaves differently in transit and in a heated room. When you review samples from each candidate factory, look at:

  • Edge treatment. Where the light panel meets the dark panel, ask how the edge is finished and whether the two finishes are the same substrate or different ones butted together.
  • Colour match across batches. Order one sample board of every finish in the scheme, from the same production run, and keep it as your reference for later deliveries.
  • Sheen contrast under site lighting. A matte panel next to a gloss panel reads differently under warm LED strips than under daylight. Request both finishes together and view them on site before signing off.

Our Two Tone Sliding Door Wardrobes are made to measure, so the layout, finish combination and dimensions are set per project rather than chosen from fixed sizes. The same applies across the rest of the built-in furniture range, which is how a bedroom wardrobe, a hallway storage wall and an arched niche cabinet can be produced to one detail standard instead of three.

Score the shortlist on what you can verify

Shortlisting is easier when you stop comparing brochures and start comparing evidence. For each manufacturer, ask for the same five things and score them pass, partial or fail:

Evidence to requestWhat a good answer looks like
Made-to-measure processThey return your drawings with marked-up dimensions and ask about the wall build-up before quoting.
Finish libraryPhysical samples of both tones plus a written note on substrate, edge banding and hardware brand.
Packaging for built-insPanel-by-panel packing list with panel numbers matched to the elevation drawing, so installers know what each piece is.
Assembly documentationAn installation sequence for the track, panels and handles, written for a local tradesperson who has never seen the unit before.
Point of contact through deliveryA named person who answers when a panel arrives damaged, not a shared inbox.

Two or three suppliers will pass all five. That is usually the right length of a final shortlist.

Judge the whole package, not one wardrobe

Wardrobes rarely sit alone in a project scope. They share a wall with textured wall panels, they sit on engineered flooring, and their handles need to read with the kitchen cabinetry down the corridor. Splitting those items across several factories multiplies the tolerance problems: different panel thicknesses, different edge radii, different colour references, and three separate deliveries to coordinate.

A one-stop furniture and building materials supplier removes most of that coordination. One drawing set, one production schedule, one container. For buyers sourcing from China this also means one quality inspection point before the goods leave the factory, instead of chasing several exporters across different cities.

What we do with a wardrobe enquiry

If you send us an elevation or a set of bedroom drawings, expect this sequence:

  • We check the opening dimensions and confirm the sliding configuration, including how many panels and where the overlap falls.
  • We propose finish combinations from the range and send physical samples for approval on site.
  • We return shop drawings for your sign-off before production starts, with panel numbers marked.
  • After production the goods are packed to that numbering and shipped door to door; installation guidance travels with them.

Before you send drawings: note the clear opening width and height, the depth behind the doors, the finished floor level, and which two finishes you want to combine. With those four items we can come back with a configuration and a quotation rather than a set of questions.

Final check before you award

  • Ask each shortlisted manufacturer to quote the same opening, so prices are comparable.
  • Confirm panel height limits and track specification in writing for your dimensions.
  • Approve both tones from one physical sample board, viewed under the room's lighting.
  • Agree who signs off shop drawings, and when, before production begins.

Send us your wardrobe elevations and the two finishes you have in mind, and we will tell you whether a sliding configuration works for that opening, or whether hinged or open modular storage would serve the room better.