A product submittal for a Santerson LED mirror cabinet is the document package a buyer, contractor or designer reviews before approving the item for production. Done well, it settles dimensions, finishes, electrical details and installation responsibilities on paper, so the same information reaches the drawing office, the factory floor, the electrician and the site supervisor. Done badly, it produces a mirror cabinet that arrives too wide for the wall niche, with the wrong switch position, and no clear record of who approved what.

The guide below lists what we ask our project teams to include in every bathroom joinery submittal, using LED mirror cabinets as the worked example. Nothing here depends on a single standard detail: as a one-stop furniture and building materials supplier, we make these cabinets to measure for each project, so the submittal is where the specification gets locked down.

Why the submittal matters more for made-to-measure items

Stock mirror cabinets can be ordered from a catalogue page. Made-to-measure cabinetry cannot. Once the panel cut list is released, changing a width or moving a power outlet means new parts, new packing and a delayed container. The submittal exists to remove that risk. It gives the architect or interior designer one document to comment on, and it gives the purchasing team a signed reference when goods arrive and something looks wrong.

For bathroom fit-outs that sit alongside other wet-area products — vanities, basins, shower sets — the submittal also becomes a coordination sheet. Mirror cabinet heights have to agree with vanity heights, mirror glass has to clear the basin tap, and lighting has to sit where the client can actually see their face at the mirror.

The documents we expect in a complete package

SectionWhat it should show
Project and contact blockProject name, room or unit schedule reference, buyer and contractor contacts, purchase order number, required delivery window, destination port or site address.
Shop drawingsElevation and side view with overall width, height and depth; door swing direction; internal shelf and drawer positions; wall finish line so the cabinet setback is clear.
Finish scheduleBody material, door material, surface treatment and colour reference, hardware type and finish, mirror edge treatment (polished, bevelled, framed).
Electrical scheduleSupply voltage and frequency for the destination market, LED driver location, switch type and position, whether a demister pad is included, cable outlet position on the wall.
Installation methodFixing detail for the wall build-up in that project (solid masonry, stud partition, tiled substrate), concealed or surface mounting, clearances needed for doors to open past a towel rail or basin tap.
Packing and shipment noteCarton marking against room schedule, mirror protection method, separate packing for glass and electrical components, container loading sequence when several bathroom items ship together.
Approval recordSignature or written approval with date, plus a list of any comments that were closed out before release to production.

Dimensions: state the wall condition, not just the cabinet size

A mirror cabinet submittal that lists only 700 mm wide by 800 mm high is incomplete. The number that matters on site is the finished opening after tiling and waterproofing, because a few millimetres of adhesive and tile change everything. Our shop drawings therefore show:

  • cabinet overall dimensions, plus the recommended maximum tolerance for the wall opening;
  • the finish floor and finish wall line, so the installer can set the centre height from a known reference;
  • door clearance — how far the door travels when open, checked against the vanity, tapware and any adjacent tall unit;
  • internal layout: shelf heights for tall bottles, drawer positions, and whether the interior is fitted for sockets.

Where a project uses more than one bathroom type, we recommend a room-by-room schedule rather than one generic drawing. Repeat units on a villa or apartment project are exactly where copy-and-paste drawings cause trouble, because mirror positions relative to the basin differ from unit to unit.

Electrical information belongs in the submittal, not in an email later

LED mirror cabinets are the one piece of bathroom joinery with a live electrical connection, so they attract more site queries than any other item we supply. To keep that to a minimum, the submittal should record the supply voltage and frequency for the destination market, the location of the driver and switch, and whether the mirror includes a heating pad against misting. If the client wants an illuminated edge or integrated lighting matched to the rest of the room, vanity lighting should appear in the same package so colour temperature and switching are decided once.

We also ask the buyer's electrician to confirm the outlet position on the wall drawing before production. A cable outlet hidden behind the cabinet carcass is fine; a socket that ends up behind a hinged door is not, and it is discovered at the worst possible moment.

Finishes, hardware and how they are recorded

Colour names drift between suppliers. A submittal should carry a specific reference — a board sample number, a lacquer code, or an approved physical sample the factory holds on file — rather than a phrase such as "light grey". The same applies to hardware: hinge type, soft-close or standard, handle or push-open, and the metal finish. For projects where the mirror cabinet has to match tall storage or wardrobes in the same bedroom suite, we list those items in the submittal too, so one finish decision covers the whole set.

Mirror glass is specified in the same place: thickness, edge polish, whether the front is a full-length mirror panel or a framed door with a mirrored inset. These choices change weight, and weight changes the fixing detail.

Installation and after-sales terms in writing

The last section of the package should state who installs, what is inspected at handover, and what happens if a part is damaged in transit or replaced later. We describe installation, snag inspection, warranty coverage and spare parts support as part of our installation and after-sales support, but the practical details — which installer is on site, what the warranty period covers, how a replacement door or driver is ordered — should be written into the approved submittal for that project rather than assumed.

Figures such as lead times, transit days, warranty periods and response times are not printed in our submittal templates unless they have been confirmed for that specific order and destination. A submittal is a technical record, not a marketing sheet.

How we handle the review cycle

Our process follows the steps set out on our interior design services page: project brief and proposal, quotation with detail confirmation, then production and shipment with follow-up. For a mirror cabinet order that means:

  • you send the room schedule, wall build-up and any existing electrical drawing;
  • we return shop drawings and a finish schedule for comment;
  • comments are marked up and re-issued until the design is approved and signed;
  • only then does production start, and the approved submittal becomes the reference for packing marks and site delivery.

If a project needs bespoke sizes, non-standard finishes or an OEM arrangement for a repeat apartment type, that is covered by our custom and OEM service, and the submittal records which option was selected so later orders match the first one.

A short pre-production checklist

  • Overall width, height and depth confirmed against the finished wall opening, not the structural wall.
  • Door swing and clearance checked against basin, tapware, towel rail and adjacent units.
  • Voltage, frequency, driver location and switch position confirmed by the site electrician.
  • Finish references written as codes or approved samples, not colour names alone.
  • Mirror glass thickness and edge treatment recorded, with weight noted for the fixing detail.
  • Room schedule reference printed on each carton so goods go to the right unit.
  • Approval signature and date present, with closed-out comments attached.
If you are assembling a submittal package for bathroom joinery on a villa, apartment or hospitality project, send us the room schedule together with the wall and electrical drawings. We will return shop drawings and a finish schedule for review before anything goes into production — and if your specification also covers tall mirror cabinets or other sanitary fixtures, those can be reviewed in the same cycle.