A raised panel wardrobe looks identical in two quotes and costs 30 percent more in one of them. The difference is almost never the door profile. It is what sits behind it: the substrate, the paint system, how the carcass is fixed to the wall, and which items were quietly left out of the price. This guide walks through the line items that actually decide whether a paneled wardrobe quote can be compared with another one.

Why raised panel wardrobes are hard to compare

A raised panel door has a central panel that stands proud of its surrounding frame, usually shaped by routing and moulding. That profile can be produced simply or to a high specification, and the visual result in a rendering looks the same either way. Suppliers quoting the same elevation may be describing different substrates, different numbers of coats, different edge treatments on the frame, and different carcass construction.

The second reason quotes drift apart is scope. Some manufacturers quote the doors only, some quote a full built-in unit with carcasses, shelves and hanging rails, and very few include site preparation, scribe fills to an out-of-plumb wall, or the plinth detail at floor level. Before comparing any two numbers, confirm that both quotes cover the same physical scope.

1. Door construction and substrate

Ask the supplier to state, in writing for each door type, three things: the core substrate, how the moulded frame is joined, and whether the panel is solid or a moulded/veneer construction over a board core.

  • Substrate: MDF is normal for painted raised panels because it routes cleanly and takes paint evenly. Plywood or solid-timber construction behaves differently in humid bathrooms and coastal climates, and costs more.
  • Frame joints: Tenon, dowel or mitre joints each have different movement behaviour. Ask which is used and whether the frame is designed to allow for seasonal movement.
  • Panel build: A floating panel sits in a groove so it can move; a fixed panel cannot. For tall wardrobes this matters over years of heating and cooling cycles.

If the quote says only "painted raised panel door", request the specification breakdown before you compare it with anything else. A one-line description is not comparable across suppliers.

2. Finish system, not just a colour name

"White" means nothing on its own. Ask for the coating schedule: primer, number of top coats, whether the doors are sprayed or wrapped, and whether edges and the reverse face receive the same treatment as the front. Uneven sealing on the back of a door is a common cause of warping and of visible colour difference when the door swings open.

Item to confirmWhy it changes the price
Primer plus number of top coatsMore coats means more labour and better edge coverage
Sprayed finish or vinyl/foil wrapA wrapped door can mimic paint at a lower cost but wears differently at the edges
Reverse face and edges finished to the same standardOften downgraded without being stated
Sheen level and colour referenceA named RAL or paint code avoids a colour dispute at handover

3. Carcass, interior fitout and hardware

The doors are the visible part; the carcass is what determines whether the unit survives daily use. Check board thickness, edge banding, whether the back panel is fixed or housed, and how the shelves are supported.

  • Carcass board and edge banding: Thin boards with unbanded shelf edges fail quickly in a bedroom or hallway unit.
  • Hinges and slides: Ask for brand, model, opening cycle rating and whether soft-close is included or priced as an option.
  • Interior layout: Confirm the number of shelves, drawer stacks, hanging rails and any trouser or jewellery insert are itemised, not described as "standard fitout".
  • Doors per bay and opening direction: A raised panel hinged run needs clearance for the door swing; a tight bedroom often forces a different layout than the rendering assumed.

Our Raised Panel Wardrobes are made to measure, so the carcass height, internal partition layout and finish are set per project rather than fitted to a fixed module. The same applies across the wider built-in furniture range, which is where wardrobes, vanities and cabinetry get coordinated against one drawing set.

4. Measurement basis and site readiness

Most wardrobe disputes start before production, at the measurement stage. Confirm whose responsibility each of these is:

  • Who takes the final site dimensions, and at what construction stage — after plaster, screed and floor finishes are complete?
  • Whether out-of-plumb and out-of-level walls are corrected by the builder or filled by the wardrobe unit with scribing.
  • Whether the skirting board is removed and reinstated, and who pays for that labour.
  • Whether ceiling cornices, lighting downlights or air-conditioning grilles interfere with the top of the unit.

A quote that assumes a perfectly square room is not wrong; it is simply incomplete. Ask the supplier to state their site assumptions in writing so your builder can price the corrections.

5. What is excluded, and what arrives on site

For an imported order, the exclusion list matters as much as the unit price. Work through it line by line:

  • Packaging and container loading: Ask whether doors are crated separately from carcasses and how panel edges are protected in transit.
  • Freight terms: Confirm whether the price is to port or door-to-door, and who handles customs clearance and duties.
  • Offloading and lifting into level: Frequently not included by either party.
  • Installation labour: Ask whether the supplier installs on site, sends guidance, or leaves it to your joiner.
  • Spare and replacement parts: Hinge and slide models should be ones you can source locally if a part is damaged after handover.
Ask for the shipping mark and carton list before goods load. A wardrobe order that arrives with unlabelled panels is slow to assemble and easy to misplace on a busy site.

6. Drawings, approval and change control

Production should not start until you have signed shop drawings showing every elevation, the door profile at full scale or in section, the finish reference, and the internal layout of each bay. Compare that signed drawing against the quote line by line — this is where a "standard" price turns out to exclude something you assumed was included.

  • Request a single sample door, finished both faces, before ordering the full set. Judge the profile depth and edge quality in person.
  • Set a written cut-off for changes after drawing approval, with the cost basis for late amendments.
  • Record lead time as production time plus transit, not as one combined figure, so delays can be attributed correctly.

A quick comparison sheet

Before you sign a raised panel wardrobe quote

  • Substrate, frame joint type and panel construction stated per door type
  • Coating schedule with primer, top coats, sheen and colour reference
  • Carcass board thickness, edge banding and back-panel fixing method
  • Hinge and slide brand, model and soft-close inclusion
  • Internal fitout itemised by bay, not described as standard
  • Site assumptions: who measures, when, and who corrects out-of-plumb walls
  • Exclusions listed explicitly: freight terms, duties, offloading, installation
  • Signed shop drawings and a finished sample door held on file

Suppliers who cannot answer these questions in writing will usually quote low and adjust later. Suppliers who can will produce numbers you can place side by side, which is the point of the exercise.

Send us your drawings for a comparable quotation

SANTERSON manufactures made-to-measure wardrobes and built-in cabinetry alongside the rest of the project package — flooring, wall and ceiling finishes, lighting, outdoor furniture and loose furniture. Submitting elevations and finish references lets us quote the full scope in one document instead of several partial ones.

Contact: PHILLIP · Phone/WhatsApp +86-13928214007 · Email santerson@qq.com

Are raised panel doors suitable for a bedroom that gets humid? The finish system matters more than the profile. Ask for the substrate and coating schedule, then confirm the specification with the supplier for your specific site conditions rather than assuming a painted MDF door suits every room.

Why do two quotes for the same elevation differ so much? Usually because one includes carcasses, hardware and fitout while the other covers doors only, or because one assumes the builder prepares square openings. Compare scope before comparing price.