Why the Detail in Your Enquiry Decides the Price You Get Back
Closet sliding panels are made to fit an opening, not shipped from a stock shelf. Two buyers asking for "a set of wardrobe sliding doors" can receive quotations that differ by more than double, simply because one described a room and the other described a product name. If you are specifying Santerson Closet Sliding Panels for a villa bedroom, a serviced apartment block or a hotel fit-out, the more useful question is not "what is your price per square metre" but "what does my request for quote need to contain so the quotation is comparable across suppliers". Below is the checklist we work from on our own project quotations.
1. The Opening Dimensions, Taken Properly
Send finished-floor-to-slab dimensions at three points across the width and three points down the height, not one average figure. Existing structures rarely run square, and a single measurement hides an out-of-plumb condition of 15–20 mm that changes both the panel size and the track fixing method. State clearly which surfaces are already finished and which are still to be rendered or boarded, because the panel line has to be set off one face or the other.
- Width and height at left, centre and right, in millimetres
- Depth of the recess and whether the ceiling is a suspended system or a structural slab
- Position of skirting, architraves, power points, switches and air-conditioning returns that fall inside or beside the opening
- Whether you want the panels floor-mounted, ceiling-mounted or top-hung, and what is above the head of the opening for a track to fix into
2. The Layout You Actually Want Behind the Panels
Sliding panels are only half of the system; the interior fit-out drives most of the cost. Tell us how many panel leaves you expect, which direction they stack, and what sits behind them: hanging rails at one height or two, drawers, shelves for folded storage, a mirror leaf, or an integrated lighting strip. If you have not settled this yet, say so in the request instead of leaving it blank — we will quote a base panel package and price the internal modules separately, which is far easier to compare than one bundled number.
Where the closet shares a wall with an entertainment zone or divides two areas of the same room, related systems from the same wall family are worth pricing together so the finishes match. Buyers comparing Santerson Sliding Storage Panels or a full partition arrangement usually ask for both in one enquiry for exactly that reason.
3. Materials, Finish and Hardware Specification
Specify the substrate you want quoted, the surface finish, the edge treatment and the hardware series, or ask us to quote two or three options side by side. These closet sliding panels are offered with made-to-measure sizing and a range of material and finish choices, so an unspecified request will come back as a single assumed configuration that may not be the one you intended.
| Item to state | Why it moves the quotation |
|---|---|
| Panel substrate and surface (lacquer, veneer, laminate, glass) | Determines cost band, weight and how the leaf is supported |
| Colour or grain reference | Named references avoid colour disputes at approval stage; send a physical sample where the finish must match existing joinery |
| Track, hanger and stopper series | Hardware grade is priced per leaf and per running metre of track |
| Mirrored or glazed leaves | Glass and mirror leaves need different handling, safety specification and freight packing |
| Integrated lighting and power provision | Adds driver location, wiring route and switch arrangement to the drawing set |
4. Quantities, Schedule and Site Conditions
Give unit counts per room type, not just a project total. A villa with four bedroom types repeated across floors is quoted very differently from forty unique apartment closets. Then state the required delivery date on site and work backwards: panel production follows drawing approval, so an unrealistic program forces either air freight or a change order. Also mention site access — lift dimensions, stair widths and floor level all affect whether full-height leaves can be delivered in one piece.
5. Commercial Terms and the Scope Around the Panels
State your Incoterms preference and destination, whether you want door-to-door delivery handled for you or collection from the port, and whether installation is in scope. As a one-stop project furnishing supplier, we cover design coordination, custom and OEM production, freight documentation, installation and after-sales support, so a request for quote can legitimately ask for all of it or none of it — just be explicit, because an itemised quotation lets you see what you are paying for rather than absorbing it invisibly.
Ask each supplier to price the same structure. Request a breakdown into panels, hardware, internal modules, packing and freight, and installation. A quotation that refuses to separate these lines is hard to compare, and change orders are where project budgets are lost.
6. Drawings, Samples and the Approval Route
Attach whatever you already have: architectural elevations of the closet wall, a marked-up plan, reference photographs of the existing space, or inspiration images for the finish. Where a finish has to match on-site joinery, ask for a sample panel before production and build the sample round-trip into your program. The cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production and shipment, so a complete request at the front shortens the first two stages considerably.
A Short Request for Quote Template
- Project name, location, building type and your role (contractor, designer, developer or owner)
- Product reference — Santerson Closet Sliding Panels, with room-by-room quantities
- Finished opening dimensions at three points each, plus recess depth and mounting condition
- Panel layout, number of leaves and stacking direction
- Interior fit-out modules per closet, with any lighting or power provision
- Substrate, finish reference, edge detail and hardware preference, or a request for two priced options
- Required on-site delivery date and the drawing approval date you can commit to
- Destination, Incoterms preference and whether installation is required
- Attachments: elevations, photographs, finish samples already approved
What a Good Quotation Should Return to You
In reply you should receive a marked-up elevation showing panel joints and stacking, an itemised price schedule following the structure above, the assumed configuration written out in words, a production lead time measured from drawing approval, packing and freight options, and the exclusions stated plainly. If any of those are missing, reply before comparing prices — comparing incomplete quotations is how specification errors reach production.
Send your dimensions, drawings and target program with your enquiry and we will confirm the configuration, hardware and finish options available for your project, then return an itemised quotation you can benchmark against any other closet sliding panel supplier you are evaluating.