A swim spa sits at the awkward intersection of pool, spa and exterior fixture. It arrives as a shell plus a control cabinet plus a set of pumps, and it has to be coordinated with structure, power, drainage and finishes that other trades are installing. That is exactly why procurement briefs go wrong: the model name is written down, but the specification behind the name is left open. This guide walks through what to lock into your brief when the line item is Outdoor Swim Spa WS-130AⅨ-U, and how to write it so quotations from different suppliers are actually comparable.

Why the model number alone is not a specification

WS-130AⅨ-U belongs to a configurable outdoor swim and hydrotherapy range. The catalogue entry gives you an envelope and a published equipment count, but options such as heat pumps, UV sterilisation, sand filtration, insulation and steps are listed separately, and availability varies by model. Two briefs that both say "WS-130AⅨ-U" can therefore produce materially different deliverables and prices.

The practical consequence: write the model number as a reference point, then state explicitly which equipment is included in your scope and which is excluded or priced as an option. A brief that reads "unit only, heat pump by others" is unambiguous. A brief that just names the model invites every supplier to guess differently.

The published envelope and what it means on site

The catalogue lists 8000 x 3000 x 1400 mm for this model. Treat those numbers as the shell footprint, not as your built opening. In a brief, ask for three separate dimensions so the civil and landscape teams can design around them:

  • Transport dimensions and heaviest single piece - this decides crane access, gate width and whether the shell arrives whole or in sections.
  • Installed external footprint, including steps, plant cabinet clearance and any perimeter decking detail.
  • Water depth and total filled weight, which is what the slab, terrace structure and waterproofing designer needs.

If the spa sits on an upper terrace or a podium deck, get the filled-weight figure in writing from the supplier before the structural engineer signs off. Do not let the contractor derive it from the plan drawing scale.

Equipment count: reading the specification table carefully

The published figures for this model are set out below. Use them as the starting point of your comparison table, and require each supplier to confirm or correct every line in their quotation rather than leaving it silent.

ItemPublished valueWhat to confirm in the quotation
Catalogue dimensions8000 x 3000 x 1400 mmShell, installed footprint and transport size stated separately
Control system1 setLocation, access for maintenance, weather rating
Water pump4 pcsOutput per pump and which jet zones they serve
Filter pump1 pcFiltration media type and service interval
Jet total23 pcsLayout drawing showing seat positions and jet zones
LED lights5Fixture location, colour control, low-voltage supply
Total power11.85 kWWhether the figure includes the heat pump and insulation package
Features shownWater jets, LED lighting, OzoneOzone system included; swim training system is not listed for this model and must be confirmed in writing

Two details in that table deserve attention before you issue the brief. First, the total power figure of 11.85 kW must be checked against what is inside it - a heat pump changes both the connected load and the electrical design, so state clearly whether the quoted figure covers the fully configured unit or only the base equipment. Second, a swim training system appears on the closely related Outdoor Swim Spa WS-130AⅨ but is not shown in the published specification for the -U variant. If your project brief or client presentation promises a swim-current feature, do not assume it comes with this model: ask for written confirmation of what is fitted, and if the current is essential, evaluate the related model instead.

Do not paste catalogue numbers into your tender document as guaranteed performance. Ask each bidder to restate them in a signed schedule, with options priced separately. Numbers that appear only in an attachment tend to disappear at the value-engineering stage.

Options and accessories: list them or lose them

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. In a procurement brief these belong in their own priced schedule, marked mandatory, optional or excluded-by-others:

  • Heat pump - drives the running cost and the electrical supply; specify whether it is in scope and who provides the isolator and protection device.
  • Insulation package - matters for heated operation, energy loss and condensation control on the shell underside.
  • Sand filtration versus cartridge filtration - different plant space, backhaul drainage and maintenance routine.
  • UV sterilisation and ozone - state which sanitisation is required and how chemical dosing is handled alongside it.
  • Steps and access - integrated steps change the footprint; site-built steps change who is responsible for the finish detail.

Site conditions to state in the brief, not leave to the installer

Most swim spa disputes are interface disputes. Put the interfaces in the brief so responsibility is fixed at tender:

  • Structural support: slab or pedestal system, who designs it, and the point load / distributed load values the supplier provides.
  • Drainage and overflow: drain location, fall to drain, pump pit if required, and backflow prevention.
  • Power: supply capacity in kW, single or three phase as confirmed by the supplier, cable route, isolator position and residual-current protection.
  • Waterproofing and finishes: tile, stone or decking edge detail, and who seals the perimeter joint.
  • Access and servicing: clearance to the control system and pumps for future maintenance without removing finishes.
  • Wind, exposure and screening: how the unit relates to pergolas, screens and boundary fencing on the terrace or pool deck.

Where the swim spa is part of a wider outdoor package - pergolas, loungers, dining sets, screens - it is worth specifying it together with those items. Our outdoor furniture for villas and resorts range and the swimming pools and swim spas category are usually drawn from one drawing set on villa and resort projects, so coordinating finishes, levels and delivery windows in a single package avoids the classic problem of the spa arriving before the deck is prepared.

How to structure the brief itself

A swim spa line item that works in practice follows the same sequence as any other fit-out package:

  1. Project context - location, building type, exposure, and whether this is a private villa, a resort wellness deck or a residential podium.
  2. Reference model and configuration - the catalogue model as reference, plus the included/optional/excluded schedule.
  3. Dimensional and loading requirements - footprint, transport size, water depth, filled weight.
  4. Services requirements - power, drainage, water supply, control access.
  5. Interface responsibilities - a matrix naming the party for each interface above.
  6. Delivery and access - delivery window, crane or manual carry, storage on site.
  7. Commissioning and handover - testing of jets, filtration, lighting and controls; operator documentation; spare-parts list.

If your team does not yet have the layout and loading data to fill those sections, that is a legitimate reason to start with a design-coordination stage rather than a fixed-price tender. For projects where the swim spa is one element of a larger package, our turnkey interior project solutions cover design coordination, production, logistics and site support from one contract, which keeps the interface matrix short.

Questions to send before you award

  • Which pumps serve which jet zones, and can a jet layout drawing be issued with the quotation?
  • Does the 11.85 kW figure include the heat pump, or is it base equipment only?
  • Is a swim training system fitted on this exact model, or only on the related non-U variant?
  • What are the filled weight and point loads for the support design?
  • Which insulation and cover options are supplied with the unit versus priced as extras?
  • What is included in commissioning, and what documentation is handed over at completion?

Send those questions to every bidder, not just one. A swim spa specification is only as good as the comparability of the offers you receive against it.

To confirm the configuration, loading data and options for Outdoor Swim Spa WS-130AⅨ-U, or to price it as part of a wider outdoor and wellness package, contact SANTERSON. We have manufactured furniture and building materials for villa, hospitality and office projects since 2008, with custom/OEM production, door-to-door logistics and installation support.