A two tone sliding door wardrobe rarely comes back with a single number. The quotation depends on opening width, ceiling height, how the doors stack, which panel materials meet in the middle of the elevation, and whether the unit is being built into a finished wall or a bare structure. Send a supplier the items below and you will get a comparable price the first time, instead of three rounds of clarifying emails.

1. The opening, measured the way the fitter measures

Sliding wardrobe doors travel on a track, so the opening dimensions decide more than the carcass size — they decide how many leaves you can have and whether the design works at all. Give your supplier:

  • Width, height and depth of the recess, measured at three points along each dimension rather than one.
  • The finished floor level, and whether the floor is already laid or still being set out.
  • Ceiling condition: flat slab, dropped ceiling, bulkhead, skirting, or a cornice you want the carcass to run through.
  • Obstructions inside the recess — downlights, air-conditioning returns, sprinkler heads, power points or pipes.

If the wardrobe is being built between two finished walls rather than into a purpose-built recess, say so. Out-of-plumb walls are common on renovation jobs and change both the scribe detail and the track alignment.

2. Door layout: leaf count, stacking and overlap

For Two Tone Sliding Door Wardrobes, the split between leaves is where the two tone composition is actually decided. Tell the supplier:

  • How many leaves you want across the opening, and which side they stack when open.
  • Whether you want a symmetrical split or an asymmetric one — for example a wide wood-grain leaf paired with narrower plain-colour leaves.
  • Preferred leaf width range. Very wide single leaves need heavier hardware; narrow leaves multiply the number of tracks and edge profiles.
  • Whether you want a visible frame around each leaf, a slim metal profile, or a frameless slab look with an integrated handle channel.

Two leaves on a 2.4 m opening and four leaves on the same opening are different products, not one product in two sizes. Quote both if you have not decided; it is cheaper to compare at quotation stage than after production has started.

3. The two tone specification, stated precisely

"Two tone" describes a combination, not a material. A quotation only holds if both surfaces and the meeting detail are named. Specify:

Item to specifyWhat to send
Primary surfaceFinish family and reference — matte lacquer, high gloss acrylic, melamine, wood veneer — plus the colour or grain sample number, not just a photo.
Secondary surfaceThe contrasting finish and where it appears: on alternate leaves, as a central inlay strip, as a handle band, or on the return panels.
Transition detailWhether the two finishes meet flush, with a shadow gap, or with a metal or glass insert between them.
Edge treatmentMatching edge band, contrasting edge, or metal edge profile — this is visible on every leaf and changes cost.
Interior surfacesWhether carcass and shelf interiors match the exterior tone or use a standard light board.

Where the two tones are meant to continue onto adjacent joinery — a Two Tone Acrylic Wardrobe in the corridor, matching tall cabinets, or Two Tone Wood & White Modern Kitchen Cabinets — send both schedules together and ask for one finish reference across them. Splitting the request across separate line items is how tone mismatches reach site.

4. Interior configuration, not just the front elevation

The doors are what you see; the interior is what you pay for per linear metre. Provide a hanging-to-shelf-to-drawer ratio, or send a rough sketch marked up with:

  • Hanging zones and their heights — long hang for dresses and coats, double hang for shirts and shorter garments.
  • Shelf count and depth, plus any shelves that must carry heavy items.
  • Drawer banks, tray dividers, shoe shelves, luggage shelf above the hanging rail.
  • Integrated items: pull-out valet rod, glass-front display bay, lighting in the hang zone, or a mirror end panel.
  • Anything that must be hidden behind the doors — laundry basket, vacuum cleaner, luggage — with its dimensions.

If you are choosing between door types rather than already committed to sliding, include that in the brief. A supplier who can see the room layout will compare Matte Sliding Door Wardrobes against hinged alternatives where a bed or a narrow passage limits how far a door can swing, and price both.

5. Drawings, room context and the rest of the joinery package

A dimensioned plan and elevations of the bedroom speed up everything. If drawings are not ready, send a floor plan with the wardrobe wall marked, photographs of the room from both ends, and the door and window positions on that wall. Where the fit-out is part of a wider package — cabinetry, wall panelling, doors and flooring from one source — say so at the start; coordinating finishes across the whole apartment is a different quotation from supplying one wardrobe.

Our Interior Design Services cover space planning, furniture layouts and 3D renderings, then drawing and production coordination, so projects that arrive with only a floor plan can still be developed into a quotable specification.

6. Commercial details the quotation needs to be real

DetailWhy it matters
Quantity and unit countOne wardrobe for a single bedroom and 40 units across an apartment block or serviced residence are produced and priced differently.
Project location and delivery addressDetermines freight mode, packaging grade and whether the goods go to site, to a warehouse or to a consolidator.
Delivery terms you want quotedAsk for both factory-origin terms and delivered-to-site terms so the freight line is visible rather than buried in the unit price.
Programme datesSite handover date, not an abstract "as soon as possible". Production slots are booked against a programme.
Site access conditionsLift size, stair width, floor level, and whether assembled or flat-pack delivery is required to get panels in the door.
Installation responsibilityState clearly whether your trades install, or whether you want installation support and site guidance included.
Budget band, if you have oneA stated range lets the supplier propose hardware and panel combinations that fit, rather than quoting one specification and rejecting it later.
What a quotation should show back to you. A usable quotation itemises carcass and door construction, the named finishes with their references, hardware make and type, interior fittings, packaging, delivery terms, and the basis on which dimensions were taken. If any of those are hidden inside one lump line, ask for it broken out before you compare suppliers — otherwise you are comparing prices, not scopes.

A short checklist to paste into your enquiry

  • Room name, project location, unit count, required site date.
  • Opening width, height and depth at three points; finished floor level confirmed or pending.
  • Leaf count and stacking direction; leaf width preference; frame or frameless look.
  • Both finish families with sample references, plus the transition and edge detail.
  • Interior layout sketch or hanging/shelf/drawer ratio, with any integrated items dimensioned.
  • Plan and elevations if available; photographs of the wall if not.
  • Delivery terms requested, site access constraints, installation responsibility.
  • Adjacent joinery that must match, sent in the same enquiry.

Send that and the first round of quotations is directly comparable. As a China-based manufacturer of furniture and built-in joinery supplying villa, hotel and office projects, SANTERSON produces made-to-measure sliding wardrobe systems with project-specific dimensions, layout and finish options, together with the rest of the fit-out package — built-in furniture, cabinetry, wall panelling, doors and flooring. If you have drawings, send them; if you only have a floor plan and a target budget, send those instead and we will develop the specification with you.

Prepare the opening dimensions, your two finish references and a rough interior layout before you send the enquiry — that is the difference between a placeholder price and a quotation you can build a programme around. Contact SANTERSON with your drawings or room photographs to get a specified, itemised quotation for two tone sliding door wardrobes on your project.