A panelled hinged door looks simple from a distance and complicated up close. The mouldings, the finish, the way the leaf meets the frame and the wall, and the hardware behind it all decide whether the result reads as joinery or as a catalogue item. Because these doors are usually made to measure for each opening, almost every detail is a decision the buyer has to make deliberately. This guide sets out what to settle before an order is placed, and which questions save rework later.

Why Made-to-Measure Changes the Conversation

Classic Panel Hinged Doors sit in our hinged doors range and are supplied to project-specific dimensions, with material, finish and layout chosen per space. That is normal practice for this category: openings in villas, apartments and hotels rarely match a single stock size, and floor levels are seldom perfectly even across a building. The practical consequence is that there is no default specification to fall back on. Whatever the buyer does not state becomes an assumption made by someone else.

It also means the order has to be measured after the surrounding construction decisions are fixed. A doorway that will receive a thick floor finish, a wall lining or a reveal needs to be recorded with those layers included, otherwise the leaf and frame arrive at the wrong height for the finished opening.

Panel Layout: The Decision That Sets the Character

"Classic panel" covers a wide family of designs. Two doors can share a material and a colour and still look entirely different because of what happens on the face of the leaf.

  • Number of panels. A two-panel leaf reads as traditional cottage joinery; a three- or four-panel leaf with a longer lower panel suits taller ceilings and gives better proportion in a tall opening.
  • Panel depth and profile. A raised, moulded panel catches shadow and looks decorative; a recessed panel sits flatter and quieter; a flat-panel shaker-style detail keeps the same language but with a minimal edge.
  • Rail and stile width. Narrow framing members look modern and light; wider rails feel more substantial and hold up better visually in a large opening.
  • Glazing. A glazed upper panel brings borrowed light into a hallway, but it changes privacy, acoustic performance and the type of glass that has to be specified.

Send a photograph or a sketch of the reference you are working from, together with a note on whether you want the panels raised or recessed. A single reference image removes most of the ambiguity in this part of the specification.

Material and Finish: What to Name Precisely

Panelled door leaves are built from a core with a surface layer, and both layers need naming. In our wider interior range we work with solid timber, wood veneer surfaces, lacquer, melamine, acrylic and PVC, so the same panel profile can be produced at quite different budget levels with different performance characteristics.

Surface optionWhere it makes senseWhat to confirm before ordering
Solid timber (for example oak or walnut)Residential interiors where a natural, workable surface is wanted and the leaf may be refinished in futureBoard movement allowance, how the finish will age, and the maintenance routine for the chosen coating
Wood veneer over a stable coreProjects that want consistent grain across many doors, including matching wall panelling and built-in joineryWhich veneer cut and how it pairs with the wood veneer panels used elsewhere on the same floor
Lacquer, painted or melamine surfacesColour-matched interiors and higher-traffic areas where a wipeable surface mattersThe exact colour reference, sheen level, and how the surface behaves at edges and mouldings
PVC-wrapped surfacesBathrooms, laundry areas and other humid rooms where moisture resistance is part of the briefWhere the wrap is applied and how the leaf edges are finished in a wet room

Two habits prevent most finish disputes. First, quote a recognised colour reference or send a physical sample rather than describing a tone in words. Second, ask for a small made sample of the panel profile and finish before the full set is produced. Seeing the moulding at real scale under site lighting tells you far more than a photograph does.

Hardware: The Specification Most Buyers Leave Too Late

Hinges, handles and locks are part of the door, not accessories added afterwards, and they constrain each other. Specifying them late usually means cut-outs that do not line up across a set of doors.

  • Hinge type and count. The weight and size of the leaf determine how many hinges are needed and what load rating they carry. Concealed hinges give a clean double-acting look; surface hinges are simpler to adjust on site.
  • Handle and backset. Lever or knob, rose or plate, and the distance from the door edge all have to be recorded so the leaf can be pre-machined consistently.
  • Lock and latch function. Bedroom privacy, WC, hall passage, or a simple catch - each has a different fitting and should be decided room by room on the door schedule.
  • Sealing and closing behaviour. Door closers, acoustic seals and threshold details matter in hotels and multi-unit buildings, where they are usually inspected at handover.

If a project already has preferred hardware from a local supplier, say so early. Leaves can be machined to accept those items rather than ours, which keeps the buyer's existing trade arrangements intact.

Frame, Wall Build-Up and Flush Detailing

The most expensive mistake in this category is not a wrong panel profile - it is a frame ordered against a wall build-up that has not been finalised. Before the order, confirm:

  • The finished floor level at the threshold, including any screed, adhesive and floor covering.
  • Wall lining thickness and plasterboard or render layers on both faces of the opening.
  • Whether the frame is to sit proud of the wall or be set back for a shadow gap.
  • The architrave decision: a traditional cased frame with moulded architraves, or a concealed frame with no visible lining.

Where a minimal look is wanted, we also supply flush hinged doors with concealed hinges and frames designed to sit flush with the finished wall surface. A useful project approach is to pair a decorative panelled leaf in the principal rooms with flush-painted leaves in corridors and service areas, so each door type does the job it suits. If a doorway needs to disappear entirely against panelling, decorative concealed doors are the alternative worth pricing at design stage rather than after the walls are built.

Coordinating Doors With the Rest of the Joinery

Doors rarely stand alone. Wardrobes, media walls, panelling and kitchen cabinetry in the same building should share a finish family and a consistent edge language. When we manufacture doors alongside built-in furniture for the same project, the veneer batch, colour reference and moulding profile can be carried across all of it in one production run, which is where consistency comes from. Our custom and OEM service covers bespoke finishes, textures and prototyping for projects that need a detail not in the standard range.

For buyers ordering a whole fit-out from one factory, one-stop project procurement means doors, joinery, wall finishes, lighting and bathroom fixtures arrive on a coordinated delivery plan instead of as separate consignments from separate suppliers.

A Short Pre-Order Checklist

  • A door schedule listing every opening: width, height, wall thickness, leaf count and swing direction with the latch side stated.
  • Finished floor levels recorded at each threshold.
  • Panel layout confirmed by reference image or drawing, with raised or recessed noted.
  • Surface material and colour reference named, not described.
  • Hardware list fixed, including hinge type, load rating and lock function per room.
  • A made sample of the chosen profile and finish approved before the full set is released.

Dimensions, materials and hardware details are confirmed for each order. Specifications shown on product pages describe configurable options rather than a fixed build, so treat them as the starting point for a quotation.

Getting a Quotation That Reflects the Real Job

A quotation is only comparable if it covers the same scope. Ask for doors, frames and architraves priced together, with hardware either itemised or clearly excluded, so two offers can be read side by side. For projects outside China, we arrange freight by sea, air and rail with customs paperwork and door-to-door delivery, and support installation and after-sales support on site, so the same supplier answers for both manufacture and fitting.

Send your door schedule, a reference image of the panel style you want, and your preferred finish, and we will confirm the specification and quote the full set - doors, frames and detailing together.