A set of Santerson Acoustic Sliding Panels looks straightforward on a schedule: panels, a track, a finish. The specification behind it is not. Because the panels are made to measure for each space, almost every project detail you hand over changes what gets manufactured, how the wall performs once installed, and what the order costs. Below are the details that matter most when you are specifying these panels for a villa, apartment or hospitality fit-out.
What the panel system actually is
Acoustic sliding panels sit in the Sliding Panel Systems range, alongside glass, textured and wooden sliding panels. They are configurable wall panels: finish, layout and dimensions are set per project, with made-to-measure sizing and a choice of material and surface finish. The acoustic element is what separates them from a standard room divider - the panel build and the closing detail shape how sound behaves between two spaces.
A partition that closes properly can turn one large room into two usable ones, which is why these systems keep appearing in villa media rooms, apartment studies and hotel function spaces rather than only in offices.
That configurability is the reason we always ask for project information before quoting. Two openings of the same width can need very different builds depending on what happens on either side of the wall.
Detail 1: how the space is used, hour by hour
The use of each room decides how much separation you actually need. A home cinema that runs at night, a study where someone takes calls, a guest suite next to a lounge and a hotel meeting room that opens onto a banquet hall all demand different panel builds. Tell us what the space is used for and when, rather than asking for "soundproofing" in general terms.
- Is the noise mostly speech, music with bass, footfall or equipment?
- Does the partition stay closed for hours, or open and close several times a day?
- Which side is the quiet side - the room being protected, or the room being contained?
Detail 2: opening dimensions and how many leaves you need
Send the clear opening width and height, not the finished wall length. Panel width drives leaf count, and leaf count drives track layout, stacking space and hardware loading. A four-metre opening handled as two wide leaves behaves differently from the same opening handled as four narrower leaves.
- Clear opening width and height, plus the head condition - slab, steel, or timber framing.
- Where the stack lands when the panels are open, and how much wall is available to receive it.
- Whether the panels run past a corner, need a bypass, or must disappear into a pocket.
Detail 3: floor, ceiling and head conditions
Track support is one of the most common causes of rework. Sliding panel systems rely on a track fixed to a structure that can carry the weight of every leaf for the life of the project. A suspended ceiling cannot do this on its own; the load path has to reach slab, steel or dedicated framing above.
Floor condition matters just as much. Raked floors, underfloor heating, thick stone thresholds and existing expansion joints all change the bottom guide detail. If you are working from a renovation drawing, confirm finished floor levels before we fix panel heights - panels made to structural dimensions will not fit a room that has since been re-screeded.
Detail 4: acoustic target and the closing detail
State the performance you are trying to reach in plain terms: which rooms sit either side, what has to stay private, and whether anyone will test it afterwards. From that we can propose the panel build and the edge and meeting-stile details that go with it.
A sliding wall is only as good as where it closes. Gaps at the jamb, at the head and between meeting stiles let sound through regardless of how the panel itself is built. Perimeter seals, an interlocking meeting stile and a proper floor seal are decisions you should make at drawing stage, not on site.
We do not publish a single acoustic figure for this range, because the result depends on the configuration you choose and how it is installed. We confirm the performance of the specific build against your project requirements before production, so the number you sign off matches what is delivered.
Detail 5: finish, substrate and how the wall must look
Finish is where acoustic panels get mistaken for ordinary joinery. The surface has to match the surrounding scheme - veneer, lacquer, matte laminate, textured panel or a fabric face - while the build behind it does the acoustic work. Where the partition reads as a decorative wall, we coordinate it with the wider acoustic panels and panelling in the same room so the two match.
- Sample a finish before sign-off; a veneer on a small door sample reads differently across a four-metre wall.
- Confirm whether hardware is visible or concealed, and who specifies the handles.
- Note adjacent materials - glass, stone and timber reveals all affect the frame detail.
Detail 6: traffic, frequency of use and hardware duty
A villa partition that moves twice a week and a function-room wall that moves at every event are not the same specification. Frequency of use sets the hardware duty, the track profile and the service interval. In hospitality we also check who operates the panels - guests, housekeeping or events staff - because that decides how robust the edges, seals and handles need to be.
Detail 7: fire, safety and local requirements
Sliding walls in commercial buildings often sit near escape routes or form part of a compartment. If your project has a fire strategy, send it with the drawings so the panel build, fixings and penetrations can be checked against it rather than assumed. Requirements differ by state and by building class, and the certifier's comment on a shop drawing is far cheaper than the same comment after delivery.
Detail 8: programme, site access and installation sequence
Made-to-measure panels are manufactured against approved dimensions, so the survey has to happen when the room is actually ready. Before production we need finished floor levels confirmed, ceiling set-out fixed, and services above the track resolved - ductwork, sprinklers and light fittings included.
Then think about sequence and access. Panels are long, flat and awkward through a finished lobby or up a service lift. Confirm the delivery route, storage area, hoarding dates and which trades will be working around the installation. Our workflow covers design and planning, production, logistics, on-site installation and handover with snag inspection, so booking the survey and installation windows early keeps the wall off the critical path.
Detail 9: budget structure and what you are pricing
Price follows configuration: panel size and build, leaf count, track and hardware duty, finish, and delivery destination. Send us the opening sizes and the performance target first and we will price two or three options against them, so you can trade acoustic build against finish rather than losing one of them at value-engineering stage.
Information to send before we quote
- Room use and the acoustic problem in one or two sentences
- Clear opening width and height, plus finished floor levels
- Head structure and available stack space
- Preferred finish, with reference to adjacent panelling or joinery
- Frequency of operation and who operates the panels
- Fire strategy notes and any certifier requirements
- Target delivery and installation dates, plus site access constraints
If you are coordinating a partition alongside other built-in work - wardrobes, media walls, partition sliding systems or full-height storage - it is worth specifying them together. One supplier measuring once keeps the reveals, finishes and floor details consistent across the whole project.
Send us your drawings. Email our team with your plans, opening sizes and acoustic target. We are a China-based furniture and building materials manufacturer working on villa, hotel and office projects worldwide, and we will come back with a configuration, a finish proposal and a quotation for the exact build.
Panel dimensions, finishes, hardware and acoustic performance are confirmed against each project's requirements before production. Fire and building requirements are the responsibility of the project's local consultants and certifier.