Flush sliding doors look simple on a drawing: one clean panel, no visible frame, no swing clearance. That simplicity is exactly why they cause problems when they are ordered late, measured roughly or specified without the surrounding wall being planned first. The checklist below follows the order a procurement team actually works in, from opening definition to site preparation and handover, using Santerson Flush Sliding Doors as the reference product.

1. Confirm the door type before you confirm the size

A flush sliding door is not interchangeable with every other concealed solution. Before anything else, decide which of these your layout needs, because each one changes wall build-up, floor detailing and cost:

  • Surface-mounted flush sliding door — the panel slides across a wall face and finishes flush with it when closed. It needs a clear run of wall for the panel to travel over.
  • Pocket / in-wall sliding door — the panel disappears into a cavity. Santerson Wood Veneer Pocket Doors belong to this group, and they require the cavity, pocket frame and lining to be built in during the wall stage.
  • Hinged flush door — no track at all, but it needs swing clearance and a matching opening. Compare with Santerson Flush Hinged Doors if the room has space for the leaf to open.
  • Concealed or decorative flush panel — used when the goal is a hidden store or a wall that reads as one surface, such as Flush Wall Aligned Doors.

Write the chosen type on the door schedule. A single line — "bedroom 2, sliding, flush to finished wall face" — prevents the joiner, the plasterer and the door supplier from each assuming something different.

2. Lock the opening and the travel dimensions

Sliding doors fail on site far more often because of what was assumed around the opening than because of the panel itself. Record these figures and have them signed off before production starts:

Item to confirmWhy it matters
Structural opening width and height, plus finished floor level on both sidesMade-to-measure panels are built to the confirmed dimension; a slab or screed change of a few centimetres moves the whole reveal.
Clear travel length for the panel when openThe wall the panel slides across must be unobstructed for its full width, including skirting, switches and handrails.
Finished wall build-up and total thicknessDetermines whether the track sits on the face or inside a cavity, and how much lining is needed.
Panel overlap at the closing jambToo little overlap leaves a visible shadow gap; too much rubs against the stop.
Number of panels and hanging sideSets where the load enters the structure and which side needs reinforcement.

Santerson's flush sliding door range is offered with made-to-measure sizing, material and finish options and a layout tailored to the project, so these dimensions are specification inputs rather than fixed catalogue sizes. Confirm them for each opening on the schedule, not once for the whole building.

3. Specify the wall that carries the door

This is the item most checklists miss. A sliding panel is only as good as the surface it runs against and the structure above the track:

  • Head structure must be able to carry the panel weight plus repeated movement — note the load on the framing drawing, not only on the door order.
  • The wall face behind the travel zone has to be plumb and true to the finished line; a bowed wall shows as an uneven gap along the whole height.
  • Pocket openings need the frame, lining and any sound insulation installed before the wall is closed — retrofitting means opening the wall again.
  • Coordination with Wall Panel Systems or other finishes should be drawn at the same time, so the panel, reveal and adjacent cladding meet on one line.

4. Choose finish, edge detail and hardware behaviour

Flush doors are bought for their appearance, so the finish decisions belong in the checklist alongside the joinery package rather than being left to the site team:

  • Surface and colour — match against the cabinetry and wall finishes already in the schedule. Veneer, lacquer, matte and handleless options are listed across the door collections; request samples under the room's actual lighting.
  • Edge and reveal detail — decide how the panel meets floor, ceiling and jamb, and who supplies the stop.
  • Handle or handleless — a flush pull keeps the surface clean; Santerson Handleless Concealed Doors show how this detail is resolved when no hardware should be visible.
  • Glass option — where daylight needs to pass through, Glass Sliding Doors are a different build and need their own track detail.

5. Add the operating and access requirements

Ask what the door has to do every day, not only how it looks closed:

  • Frequency of use and who uses it — a store door opened twice a year and a study door opened constantly need different hardware quality.
  • Smoothness expected in operation, and whether soft-close or a floor guide is required to stop the panel swinging out.
  • Sound separation between rooms, and whether the closing edge needs a seal.
  • Cleaning access to the track and to the wall behind the travel zone.

6. Put the doors in the procurement sequence

Flush sliding doors touch three trades, so their position in the programme matters more than for a standard leaf:

  1. Design freeze — door type, opening sizes and wall build-up on the drawings.
  2. Site preparation — head reinforcement, pocket frames, finished floor levels, wall faces set out.
  3. Re-measure on site against the actual finished line, then release production.
  4. Delivery and storage — panels stay flat, dry and protected until the wet trades are done.
  5. Installation, adjustment and snag list, with the track cleaned before handover.

Ordering doors in one batch with the rest of the joinery package is usually easier to coordinate than buying them separately. Santerson's Turnkey Solutions cover design, custom/OEM production, door-to-door logistics and installation support for villa, hospitality and office projects, which keeps the doors, cabinetry and wall finishes on one drawing set and one delivery plan.

7. Record what still has to be verified

Before you place the order, confirm in writing: final measured dimensions for each opening; selected material and finish; track type and load rating; who supplies the pocket frame or surface track and who installs it; wall reinforcement responsibility; delivery point and packaging; and the adjustment and snag process at handover. Materials, dimensions and finish options for a specific order should be confirmed with the supplier rather than taken from catalogue text.

The short version of the checklist

A complete buying checklist for Santerson Flush Interior Doors and flush sliding doors covers seven blocks: door type chosen against the layout; opening, travel and wall-thickness dimensions signed off; the carrying wall designed and built to suit; finish, edge and hardware detail agreed; daily operation and access requirements stated; the doors placed correctly in the programme with a site re-measure before production; and every unresolved item written down and answered before release. Tick those in order and the installation is a fitting job rather than a site problem.

Send your door schedule, opening dimensions and finish references to the SANTERSON project team for a made-to-measure proposal that matches your joinery package and delivery programme. Contact us.