A stacked laundry unit looks simple on a drawing: washer below, dryer above, a cabinet around them. Then the site measurement comes back, the appliance datasheet arrives, and the joinery detail has to absorb all of it. The questions below are the ones we ask project teams before a stacked laundry unit is put into production, and they are worth putting to any supplier you are about to buy from.
1. Which appliance is actually going in?
Everything downstream depends on this answer, so it should never be left open. A made-to-measure enclosure sized to an unspecified "standard washer" will not fit once the actual machine is selected. Before we cut anything, we want the brand and model, or at minimum a dimensioned datasheet showing:
- case width, height and depth, plus the door or lid projection when it opens;
- the water inlet, drain and any vent connection positions;
- loading type, because front-loading and top-loading machines need different clearances above and in front;
- the clearance each manufacturer asks for at the back and sides for hoses and airflow.
If the appliance has not been chosen yet, say so plainly. We can then design the carcass around a shortlist of models rather than one guess, and you avoid re-making cabinetry after the procurement team commits to a machine.
2. What are the real finished dimensions on site?
The architectural opening and the finished room are rarely the same number. Tiles, waterproofing, plasterboard, skirting and a rendered wall can each take a few millimetres, and in a laundry those millimetres decide whether a door swings freely or binds.
Send us the measurement after wall finishes, not before, and tell us which face is out of plumb if the survey flagged it. Our units are made to measure, so an accurate set of finished dimensions costs nothing extra; an inaccurate one creates a site problem that does.
3. Where does the wet work go?
A stacked configuration moves services vertically, and that has consequences people miss at drawing stage:
- the upper appliance's drain has to fall to the standpipe or waste outlet, so its route needs a confirmed height and run;
- inlets, taps and stop valves must sit where the hoses can reach without being pinched behind the carcass;
- a top-loading washer under a dryer shelf or overhead cabinet needs enough headroom for the lid to clear;
- if the machine shares a wall with a bathroom or bedroom, noise and vibration are worth designing for rather than explaining later.
4. How will the unit cope with moisture?
Laundries and bathrooms are the two rooms where cabinetry fails early when the substrate and edge treatment were chosen for looks only. Tell us the room: a laundry inside a dry apartment cupboard behaves differently from an ensuite, an outdoor laundry at a villa, or a shared laundry in a staff block.
We then match the board, the finish and the detailing to that environment, and we keep the specification consistent with the rest of your joinery so the laundry does not read as a different building. Where the unit sits in a wet area, we also confirm how the base is supported and how the worktop edge is sealed.
5. What else has to live in this cabinet?
A stack recovers floor area, but only if the storage around it is planned. Detergent, fabric softener, cleaning tools, ironing, linen, hanging rails for items that must not be folded: each needs a home, or they end up on the worktop permanently.
This is where the wider interior fixtures range earns its place. Our Laundry Integration collection covers the pieces that surround a stack, including washer dryer cabinets, multi function tall cabinets for linen and supplies, pull-out hampers that slide out of a recess, and compact laundry solutions for tight apartments and staff accommodation. Layout, material and finish are specified per project, so the stack and the storage around it are drawn as one system.
6. Who coordinates this with the rest of the fit-out?
On a villa or apartment package, the laundry unit is one item among cabinetry, wardrobes, bathroom fixtures, doors and flooring. When those come from different suppliers, the seams show: finishes that nearly match but do not, delivery dates that drift apart, and trades waiting on each other.
Our turnkey solutions cover design through production, door-to-door delivery, installation and after-sales support, so the laundry is specified in the same shop drawing set as the kitchen and wardrobes. If you are assembling a package from China for an Australian project, that single point of coordination matters more than any individual product.
7. What comes back to us before production?
We ask for a marked-up drawing or a site photo with measurements, the appliance datasheet, and your preferred finish reference. In return you get a proposal that shows the carcass set-out, the clearances we have allowed around the machines, and the materials we have specified for that room. Confirm those details before production starts; changes after cutting are expensive and slow.
Send with your enquiry
- Appliance brand and model, or the dimensioned datasheet
- Finished dimensions after wall and floor finishes, with level and plumb noted
- Positions of inlet, waste, power and any vent
- Room type and exposure: apartment laundry, ensuite, outdoor or shared laundry
- Storage to be included: hampers, tall storage, hanging, ironing, worktop
- Finish reference matched to your existing joinery
- Delivery destination and the site's access constraints
A quick comparison of the usual layouts
| Layout | Suits | Watch for |
|---|---|---|
| Stacked unit in a recess | Apartments and villas with limited floor area | Overhead clearance, drain fall from the upper machine, door swing |
| Cabinet enclosure with doors | Ensuites and hallways where the laundry must be hidden | Ventilation for the machines, hinge type, access to controls and filters |
| Stack plus tall storage | Family villas and staff accommodation | Depth of shelving versus linen volume, load on adjustable shelves |
| Compact laundry solution | Guest units, compact apartments, refurbishment | Lid clearance on top-loaders, worktop depth, hamper drawer run |
Send us the appliance datasheet and your finished measurements, and we will come back with a made-to-measure proposal for the stack and the storage around it. Talk to PHILLIP on +86-13928214007 or email santerson@qq.com.