A corner wardrobe with sliding doors is one of the easiest places in a bedroom plan to lose usable storage and door clearance at the same time. That is also why an accurate quotation depends on information most enquiry emails leave out. Below is the checklist we use when we price Sliding Door Corner Wardrobes for apartment, villa and hotel bedroom projects, so you can send it once and get a comparable number back.
Why the corner changes the quotation
A straight wardrobe is priced from two spans: width and height. A corner unit adds a third variable — how the two runs join, and which run the doors travel on. Sliding panels need an overlap zone and a clear track length; the return leg of the corner usually carries fixed carcass instead of doors, so the internal layout you picture is not always what the door geometry allows.
Because our Built-in Furniture collections are made to measure, the price follows from the drawings rather than from a catalogue size. Send the items below and the first quotation is normally close to the final one; leave them out and you get an estimate that has to be reopened after site measurement.
1. The room dimensions, taken the way we need them
Give us measured numbers rather than a nominal plan scale. For each wall of the corner we need:
- Finished-to-finished length of both runs, and the depth you want for the carcass.
- Floor to ceiling height, plus any ceiling bulkhead, cornice or skirting that has to be cut around or scribed.
- Position of sockets, switches, radiators, downlights, sprinkler heads and air-conditioning returns.
- Whether the floor and ceiling are level — a corner unit squares to whichever reference line you nominate.
- Doorway and corridor widths at the delivery route, plus lift or stair dimensions for an apartment or hotel floor.
If the walls are not yet plastered or the flooring is not yet laid, say so. We quote to a stated assumption instead of guessing, and the assumption travels with the order.
2. The door layout you actually want
Tell us how many panels you expect and which run they should travel on. Two panels that meet at the apex behave differently from two panels that each cover one leg, and a three-panel stack needs enough track length to park them. If you are weighing sliding against another option in the same corner, note that we build the same carcass family with other door types — Hinged Door Corner Wardrobes when swing clearance is available, and L Shaped Corner Wardrobes where an open corner display works better than a closed one.
Also confirm whether you want the doors to run on a top track, a bottom track or a wall-hung system. We will tell you which of these the ceiling construction and floor finish you have specified can carry.
3. Internal layout, planned around what you store
Send a list of what has to be stored, not just an elevation drawing. Hanging length for long garments, double hanging for shirts, drawer count, shelf spacing for folded stacks, a section for luggage or seasonal cases, space for an ironing board or a vacuum, and any lighting you want inside the carcass. Corner returns are where storage gets wasted, so we plan them around your list.
Where the brief is more about appearance than capacity — flush panels, handleless fronts, a wardrobe that reads as wall panelling — say so at the enquiry stage. Our Custom Minimalist Bedroom Wardrobe work covers sizes, internal layouts, door styles and surface finishes as one package, which is easier to price than a series of add-ons.
4. Materials, finishes and the samples you need
For a quotation we need the board specification, the front finish, and the edge treatment. Tell us the finish family you are working from — lacquer, melamine, veneer, acrylic, glass — and the colour or grain reference, ideally matched to a floor, door or joinery finish already on the project. Where a catalogue image is not enough to sign off a colour, ask for physical samples before the order is placed; that decision belongs in the quotation, not in a change request.
For hotel and multi-unit work, send the finish schedule with room types. Identical carcass details across room types let us price by type instead of by unit.
5. Quantity, site programme and delivery address
| What to state | Why it moves the price |
|---|---|
| Quantity, split by room type or unit type | Repeat units share tooling and set-up; one-off corners are priced individually. |
| Required on-site date and any phased delivery | Determines production slotting and whether shipments are consolidated or staged. |
| Delivery address and incoterm you want quoted | Freight to an apartment block, a villa site and a hotel floor are handled differently. |
| Packaging expectations for the building | Protective packing for occupied buildings costs more than palletised delivery to an empty shell. |
| Who installs, or whether you want installation quoted | Site fitting is a separate line and has to be scoped with the openings and access route. |
6. Drawings and reference material worth attaching
- A dimensioned plan of the bedroom, even a site sketch photographed on a phone, marked in millimetres.
- An elevation of each corner wall with sockets and bulkheads shown.
- The interior finish schedule or the joinery detail drawing if one exists.
- Two or three reference images for the look you want — they settle appearance questions faster than words.
Our Custom & OEM Service covers design and prototyping, bespoke finishes and material selection, so if you have a concept but no drawing yet, send the concept and we will develop it with you.
What you should get back from a supplier
A quotation that can be compared line by line with a competitor's should state: carcass and front specification with board and finish references; door system and hardware brand or model; the exact dimensions being priced; what is excluded, such as site preparation, scribing, installation or freight beyond the agreed incoterm; production lead time from confirmed drawings; packing method; and the payment terms. If any of these are missing, the number is not yet a quotation.
Sending it all in one enquiry
SANTERSON has manufactured furniture and building materials since 2008 and supplies fitted wardrobes alongside the rest of a bedroom package — Interior Fixtures, doors, wall panelling, lighting and bathroom products — from one production programme. When the corner wardrobe, the hinged doors for the same room and the panelling behind the bed come from the same drawings set, the reveals and finishes line up without a site argument.
Send your room dimensions, door preference, storage list and finish references to request a quotation, and we will return a made-to-measure price for the corner configuration you need.