A hidden cabinet wall looks effortless on site, which is exactly why it fails so often in procurement. The joinery has to disappear into a finished surface, swallow appliances and clutter, and still open smoothly years later — and almost every one of those outcomes is decided before production starts, by the information you hand the factory. Below is the brief we work from on our own hidden cabinets, written so you can hand the same list to any manufacturer and compare quotations on equal terms.
Start With the Wall, Not the Cabinet
Hidden storage is a wall system first. Tell the manufacturer what the wall is doing in the room before you describe doors and drawers, because that single decision drives the module sizes, the hardware and the finish sequence. The same three questions shape every project we quote: which room, which use, and what has to be out of sight.
- Room and use. Living room media wall, bedroom wardrobe wall, hallway pantry, study library wall or a guest-room feature in a hotel project. Daily family use and guest use put very different demands on hinges and drawer runners.
- What disappears. List the actual items: vacuum cleaner, linen, luggage, board games, wine glasses, a coffee machine, a wall oven, a washing machine. Sizes matter more than categories.
- Open or closed ratio. Most successful walls mix both — display shelves and lit niches for what you want to see, closed doors for the rest. Our mixed open and closed storage wall is built around that split.
- Height strategy. A floor-to-ceiling run uses the full wall but needs a plan for reaching the top zone: pull-down rails, deep top shelves for seasonal items, or a step stool stored in the unit itself.
Give Dimensions the Factory Can Actually Build To
"Approximately four metres wide" is where projects go wrong. Send a dimensioned drawing — even a hand sketch with measured notes beats a photograph — and state which numbers are fixed and which are negotiable.
| Information to supply | Why the manufacturer needs it |
|---|---|
| Finished floor-to-ceiling height, plus wall length at top and bottom | Older buildings rarely have square walls; out-of-plumb walls change scribing and panel sizes. |
| Position of skirting, architraves, cornices and existing power points | Determines whether doors clear the skirting and where sockets can be hidden behind the carcass. |
| Floor build-up if a screed or new floor is still to come | A unit made to a bare-slab height will not fit once the finished floor is laid. |
| Appliance make and model, with the installation drawing | Ventilation gaps, door relief and electrical positions are taken from that drawing, not guessed. |
| Door swing or slide direction and the traffic lane in front of the wall | Hinged doors need clearance; sliding fronts need a track zone and a place for the panel to stack. |
Our built-in collections are made to measure with material and finish options specified per project, so send the drawing early and we will return layout proposals rather than a fixed catalogue size. For appliance walls, our integrated appliance tall cabinets are dimensioned around the equipment you nominate.
Name the Concealment Method You Want
"Hidden" means several different details, and price differences between them are large. Pick the method in the brief instead of leaving it to interpretation.
Handleless flat fronts
Push-to-open or a routed finger pull keeps the face unbroken with no visible ironmongery. State which you prefer, because push mechanisms need door weight and span limits respected.
Concealed doors that read as wall panelling
Where a doorway must vanish into the same surface as the joinery, specify it explicitly. Concealed doors are a separate product line with their own frame and hardware requirements — see our handleless concealed doors.
Sliding fronts
Panels that slide across the wall suit narrow rooms where a hinged door would block a walkway. Ask for the track type, the load rating and whether the panel runs on a visible or recessed rail. Our sliding storage panels are specified per project for exactly this reason.
Media that hides when it is off
If a screen sits behind the wall surface, say so at the layout stage. Our sliding panel TV systems and integrated media storage are drawn around the screen size, cable route and ventilation you provide.
Specify the Interior Layout in Zones
The outside sells the design; the inside decides whether the family keeps the wall tidy. Divide the interior into hanging, drawer, shelf and tall-item zones and give approximate widths for each.
- Hanging: short-hang rows for shirts and jackets, double hang for bedroom walls, pull-down rails where the hang height exceeds comfortable reach.
- Drawers: state quantity and depth. Deep bottom drawers swallow bulky items far better than a stack of shallow ones, but they still need a load rating stated.
- Shelves: give adjustable pitch rather than fixed heights, and note the tallest item that must fit on one shelf.
- Niches and lighting: open display niches need a decision on LED strips, transformer location and access for replacement. Specify it in the brief — our open display niches are drawn with cable routes decided before production.
Ask Which Materials and Hardware Are Actually Being Quoted
Two quotations for the same wall can differ by a wide margin simply because one includes soft-close runners and the other does not. Ask every supplier to break out board type, edge treatment, door finish, hardware brand and hinge load rating in writing.
- Board and core: ask what substrate is used for carcass and doors, and how it is edged.
- Finish: matte lacquer, high gloss, acrylic, melamine or wood veneer. If you are matching an existing finish, send a physical sample rather than a colour name.
- Hardware: hinge and runner brand, soft close yes or no, load rating for drawers, and the warranty terms offered on that hardware.
- Matching finishes across trades: if the wall shares a surface with panelling or doors, order the panels and joinery from one supplier so batch and grain direction match. Our wall panel systems are produced alongside the built-in furniture for that reason.
Set Out the Sequence: Survey, Drawings, Production, Delivery, Installation
Hidden cabinets fail most often at the handover between design and site. Put the stages in your brief and confirm who owns each one.
- Site survey or verified dimensions. Confirm whether the supplier measures on site or works from your drawings, and who carries the risk if they differ.
- Approval drawings. Nothing should enter production before you sign a drawing showing every elevation, interior zone and appliance cut-out.
- Production and finish approval. For larger runs, ask for a finish sample or first-article check.
- Packaging and freight. Built-in joinery is heavy and the panels are the fragile part. We handle sea, air and rail freight with customs paperwork and door-to-door delivery, so state your delivery address and access conditions in the brief — see furniture logistics and door-to-door delivery.
- Installation and snag list. Decide whether you fit locally or the supplier sends guidance and installers. Our installation and after-sales support covers inspection and snags on site.
What a Good Brief Looks Like in Practice
On a whole-house joinery package we produced in a mid-century interior, the brief was a measured plan plus a list of what each zone had to hold. The result combined a bay-window desk with storage drawers, open staircase bookshelves and wood-grain kitchen cabinets with deep metal drawers — display and hidden storage on one continuous run, with every cabinet dimension taken from an on-site survey so appliances fitted without scribing on the day. That project is documented as our mid-century whole house custom cabinetry and built-in storage project, and it shows what a complete brief buys you.
If you are sourcing built-in furniture alongside other fit-out items for a villa or hotel, bundling the joinery with the rest of the package under one supplier keeps finishes and schedules aligned. That is how our custom furniture manufacturer service works: design proposal, quotation and detail confirmation, then production, shipment and follow-up.
Common Briefing Mistakes We See on Quotation Requests
- A photograph instead of dimensions. A reference image sets the style; it cannot tell a factory your ceiling height or where the skirting stops.
- No appliance decision. "Tall cabinet for oven" without a model number means the cut-out is guessed and ventilation is improvised.
- Leaving hardware to the supplier. Ask for it named, priced and warranted.
- Ordering the wall before the floor and decoration sequence is fixed. Hidden cabinets are finished work; they should be measured after floors, plaster and levels are final.
- Comparing suppliers on total price only. Compare what each quotation includes: survey, drawings, hardware, lighting, spare panels, packaging and delivery terms.
Frequently Asked Questions
What is the minimum information a manufacturer needs for a hidden cabinet quotation?
A dimensioned wall elevation, the ceiling height and floor build-up, an itemised list of what must be stored, appliance models where relevant, and your preferred opening method. With those, a supplier can price carcass, doors, hardware and lighting realistically.
When should hidden cabinets be measured on site?
After floors are laid, plaster and decoration levels are set, and appliance selections are final. Measuring a bare shell means re-cutting panels later.
Can hidden cabinets match wall panelling and doors exactly?
Yes, if they come from the same production batch. Ordering joinery, panelling and concealed doors together avoids mismatched sheen and grain direction.
Who is responsible for electrical work behind the wall?
Usually the local contractor on site. Send them the approval drawing showing socket positions, transformer location and lighting circuits before the carcass arrives.
Send Us Your Drawings
If you have a wall elevation and an item list ready, send them over with your delivery destination and we will return layout proposals, a specification breakdown and a quotation for custom hidden cabinets built to the dimensions of each wall. The same brief also works as a comparison sheet when you are quoting other suppliers.