A black frame wardrobe looks decisive on a mood board and indecisive on site. The slim aluminium profile that reads as "minimalist" in a render is the same profile that exposes an out-of-plumb wall, a ceiling that drops 12 mm across the run, or a skirting the drawing never mentioned. Coordinating these wardrobes is not a finishing task; it is a documentation task that has to be finished before production starts.
SANTERSON manufactures Minimalist Black Frame Wardrobes as made-to-measure pieces within the Glass & Aluminum Frame Wardrobes collection, with finish, layout and dimensions specified per project. That flexibility is exactly why the paperwork matters: nothing about the unit is standard, so every dimension has to be agreed in writing rather than assumed from a detail sheet.
What makes this product category unforgiving
A black anodised or powder-coated aluminium frame around glass does two things that amplify construction tolerances. First, it draws a hard line against the wall, ceiling and floor, so any deviation becomes visible instead of being absorbed by a shadow gap or a scribed architrave. Second, glass infill — clear, frosted, smoked or bronze — is cut once. There is no on-site trimming, and a rebate that is 8 mm off means a panel goes back to the factory.
The practical consequence: the difference between a clean installation and a costly one is decided in three places — the design drawing, the site survey, and the production approval sheet. Get those three documents to say the same thing and the rest of the process is routine.
Reading the drawings for wardrobe information that is not there
Most architectural elevations show a wardrobe as a rectangle with a hatch. For a framed glass system you need to convert that elevation into a fabrication-level drawing, and the fastest way is to mark up the existing set with a short list of gaps:
- Floor finish build-up. The level shown on the structural slab is not the finished level. Confirm the screed, adhesive and finish thickness, and whether the wardrobe sits on the finished floor or is set into it.
- Ceiling line. If there is a bulkhead, cove lighting or a gypsum set-down, the drawing must show its depth and position relative to the carcass top.
- Door swing and clearance. Hinged glass doors need clearance from the adjacent wall, bed, or handle of a neighbouring unit. Sliding configurations need track depth recorded on plan, not just elevation.
- Services. Downlights in the wardrobe top, sockets inside the carcass, and any actuator for automatic doors all have to appear on the electrical drawing with positions tied to a dimension line.
- Fixing substrate. Framed units fix into solid backing. Where the wall is stud, plasterboard or a lightweight partition, the drawing needs to state where noggings or a backing batten go and who installs them.
Where your own team does not hold that detail, our Interior Design Services cover space layout planning, furniture layouts and 3D interior rendering, plus drawing and production coordination with on-site guidance — which is the stage where these omissions normally get caught.
The site survey: four measurements that decide the outcome
Drawings give you intent. The survey gives you reality, and for framed glass wardrobes the survey should be recorded as a small data set rather than a couple of numbers on a sketch:
| Measurement | How to take it | What it decides |
|---|---|---|
| Width at three heights | Top, middle and bottom of the opening, recorded separately | Whether the run needs scribing or a filler panel; maximum deviation sets the frame detail |
| Height at three positions across the run | Left, centre and right, floor finish to ceiling line | Carcass height, whether a top panel is required, and where the scribe goes |
| Wall plumb and square | Verticality at both returns, plus the corner angle | Depth of the reveal, gap size at the return, whether the unit sits parallel to the bed wall or the window wall |
| Obstructions recorded on plan | Skirting, architrave, switches, radiator, door stop, curtain line | How far the carcass stands off the wall and whether doors clear the obstruction when open |
Record the readings as taken, not averaged. Averaging hides the very deviation you are trying to design around.
Agreeing the specification before production starts
Once dimensions are fixed, the second document is a specification sheet that closes out appearance and function together. For this collection the items worth locking down are:
- Glass type and safety build. Clear, frosted, smoked and bronze glass all appear in the Smoked Glass Aluminum Frame Wardrobes family of finishes. State which one, and confirm the glazing specification for the location with the project's own requirements.
- Frame profile and finish reference. "Black" covers several surface treatments and sheen levels. Name the finish on the approval sheet so the sample you signed is the frame that arrives.
- Interior layout. Hanging zones, shelves, drawers and lighting are specified per project; the layout drawing should be signed alongside the elevation, not left to a later email.
- Interface details. Top scribe, base detail, return to wall, and how adjacent built-in furniture — vanity units, tall cabinets, storage walls — meets the wardrobe face.
A practical rule: if a detail cannot be drawn, it has not been decided. Every junction on site — floor to carcass, carcass to ceiling, frame to glass, wardrobe to adjacent joinery — should exist as a line on an approved sheet before the order is released.
Sequencing the wardrobes with the rest of the fit-out
Framed glass wardrobes sit awkwardly in a programme: they need a finished floor but should ideally be installed before heavy furniture arrives. A sequence that works on most villa and hotel rooms:
- Complete wet trades, flooring and ceiling lines; let the room settle.
- Carry out the final survey against the finished surfaces and issue the production approval sheet.
- Install backing and any electrical first fix inside the carcass zone.
- Deliver and install the units, then inspect glass, frame alignment and door operation while the room is still empty.
- Run a snag list before loose furniture and soft furnishings are placed.
For projects where wardrobes, cabinetry, flooring, lighting and bathroom fixtures all come from one source, that sequencing becomes far easier to control. Our Turnkey Interior Project Solutions cover villas, hospitality and offices across consultation, design and planning, production, logistics, installation and after-sales — with the site coordination handled by the same team that produced the units.
What to send us so the first proposal is already buildable
- Room elevations with the wardrobe run dimensioned, including floor finish levels.
- A completed site survey record — widths, heights and plumb readings as measured.
- Confirmation of glass type, frame finish reference and interior layout.
- The electrical drawing showing any in-carcass lighting or sockets.
- Notes on the wall construction, so backing can be specified rather than improvised.
Send those five items and the quotation you receive is a fabrication-level one. Skip them and the first revision happens after glass has been cut.
Talk to us about your wardrobe package
SANTERSON is a China-based furniture and building materials manufacturer supplying residential and hospitality projects, with Custom Furniture Manufacturer and OEM services covering bespoke dimensions, materials and finishes. Share your drawings and survey data and we will return a made-to-measure proposal for the full wardrobe run.
Contact SANTERSON — Phone / WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com.
Dimensions, finishes and specifications are confirmed per project. Please verify the specification for each order before production release.