Stone and marble read well on a drawing, but they fail on site for reasons that have nothing to do with the slab itself: a substrate that was never checked, a cut list nobody signed off, a basin cut-out measured after the stone was fabricated. A Santerson Stone & Marble Surfaces installation plan is the document that closes those gaps before material leaves the factory. Below is what we ask buyers, contractors and site supervisors to have in writing for countertop and wall-panel work.
Why Stone and Marble Work Needs Its Own Plan
Our stone and marble items are made to measure rather than stocked in fixed sizes. Both the countertop surfaces in the Countertops & Basins range and the Santerson Stone & Marble Panels in the Paneling Systems collection are produced to dimensions, finish and layout confirmed for a specific project. That sequence has no slack in it: once the block is cut and polished, a dimension that changes on site becomes replacement material and a re-booked container, not a quick adjustment.
The plan also fixes who is responsible for what. Santerson fabricates, packs and ships; the local builder prepares substrates, runs services and usually carries out fixing on site. Writing that split down at the start is what stops a delayed installation being argued about later.
Section 1: Scope and Drawing Set
Before anything else, the plan should name every stone or marble item in the package and attach the drawings that will be used for fabrication and for site preparation. We work from a coordinated set rather than scattered mark-ups:
- A location schedule listing each surface by room, elevation and quantity, so nothing is fabricated for a space that has been redesigned.
- Setting-out drawings showing finished dimensions, edge details, fall where relevant, and how each piece relates to the surrounding finishes.
- Cutting and joint layouts for wall panels, including where vertical and horizontal joints land relative to doors, corners and fixed furniture.
- Service drawings: water supply, waste, isolators, drainage falls and any electrical points that sit behind or inside the stone.
Where our interior design team is engaged, this package also covers space planning, furniture layouts and 3D renderings, plus production coordination and on-site guidance under Interior Design Services. Where you supply your own drawings, send them in a single coordinated revision and state the revision number on every sheet that goes to fabrication.
Section 2: Material and Finish Confirmation
Natural stone varies within a batch. The plan should record what has actually been approved, not just a product name:
- The selected material and finish for each item, confirmed against the configuration on the relevant Santerson product page.
- A physical sample or clear image reference signed off by the buyer, with the approval date recorded.
- Edge profile, thickness and surface treatment as specified for that project.
- For wall panels: the joint width, corner treatment and whether edges are to be mitred on site or pre-finished.
If a project mixes stone surfaces with other finishes in the same wall build-up, such as timber veneer, textured panels or flexible stone veneer cladding, say so in the plan and note which trade is closing each junction. Mismatched thicknesses between systems are one of the most common reasons a stone installation stalls.
Section 3: Site Conditions and Substrate Readiness
This is the section most often left blank. Stone cannot be fixed to a wall or a carcass that is not ready, so the plan should state who prepares what, and by when. The table below sets out the readiness checks we ask for on each type of stone item in a bathroom or wet-area package.
| Item | What must be confirmed on site before installation |
|---|---|
| Vanities and vanity tops | Carcass level and fixed, wall services in final position, access for the top, and confirmation of basin and tapware positions against the approved layout. |
| Basin cut-outs | Whether the basin is undermount or an above-counter vessel, and the exact cut-out position and size taken from the final selection, not from a catalogue dimension. |
| Wall panels | Substrate flat, plumb and structurally sound enough to carry the panel weight; fixing method and adhesive compatible with both the substrate and the stone finish. |
| Wet areas | Waterproofing complete and tested before stone is fixed, with falls verified and the junction detail to adjacent finishes agreed. |
| Services behind stone | Isolators, waste and electrical points accessible after fixing; anything buried must be pressure-tested and signed off first. |
| Access and storage | A clear route from the delivery point to the room, a level dry staging area, and lift or stair capacity checked for the largest piece. |
For vanity combinations, confirm the countertop against the specific unit being installed, whether that is an Integrated Countertop Vanity, a floating or double vanity, or a Double Basin Countertop, because the fixing detail and the basin set-out differ between them.
Section 4: Sequence, Tolerances and Interfaces
The plan should show installation in order, with the handover points between trades marked. A workable sequence for a bathroom package normally runs: first fix complete, waterproofing tested, cabinetry installed and level, stone surfaces set, basins and tapware connected, joints sealed, then protection fitted.
- Record the tolerance each interface is being built to, and who trims to whom: stone to tile, stone to cabinetry, panel to skirting.
- Note which joints are sealed and with what colour sealant, agreed before installation rather than chosen on the day.
- Flag any piece that has to be cut on site, and who owns the cutting, edge finishing and clean-up.
Section 5: Delivery, Handling and Packing Plan
Stone arrives as a coordinated package, and the plan should tie the delivery date to the site readiness date rather than to the production date. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to the nominated address.
For stone specifically, the plan should also state: the packing standard and crate labelling that matches the location schedule; whether pieces are packed room-by-room so they can be pulled in installation order; the delivery window agreed with the site; and who unloads. Import terms, duties and transit arrangements for a particular destination are confirmed case by case at quotation stage.
Section 6: Installation Responsibility and Inspection
State clearly whether fixing is being carried out by the local contractor or arranged with us. Our installation and after-sales support service covers on-site installation, inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance; availability of installers in a given market is confirmed for each project rather than assumed.
Either way, the plan needs an acceptance step. We recommend a three-stage check: on arrival, inspect each crate against the packing list and photograph any damage before unpacking further; at installation, sign off level, joint alignment and finish condition room by room; at handover, produce one snag list with named responsibility and target dates.
Section 7: After-Sales Record
Close the plan with the documents that make later support possible: the approved material and finish record for each item, as-built dimensions for anything re-ordered, the spare-panel quantity held on site if the project carries one, and the contact route for raising a claim. Keeping these attached to the same file means a replacement panel ordered two years later matches what was installed.
Before You Release Fabrication: A Short Checklist
- Every stone item listed by room, elevation and quantity, against a numbered drawing revision.
- Material, finish, thickness and edge profile approved in writing, with the approval date recorded.
- Basin type and cut-out dimensions confirmed from the final selection.
- Substrate, waterproofing and service positions signed off as ready, with names and dates.
- Delivery date tied to site readiness, not production completion.
- Fixing responsibility, sealant colours and site-cut items agreed in advance.
- Snag and handover process defined before the first crate is opened.
If you are coordinating stone alongside other finishes in one fit-out, it usually makes sense to place them with a single supplier so the drawings, tolerances and delivery windows are managed together. Our turnkey project solutions cover villa, hospitality and office work end to end, from design and material selection through production, logistics and installation.
Questions We Are Asked Most
When should stone dimensions be taken?
After the substrate and cabinetry are fixed in their final position, not from architectural dimensions alone. Where a project has to release fabrication early, we record the assumed dimensions as provisional and flag the items that will need re-measurement on site.
Can wall panels and countertop surfaces be ordered together?
Yes, and it is usually better, since both are made to measure against the same drawings. They can still ship in separate consignments if the site needs them at different stages.
Who prepares the wall before panels are fixed?
The local contractor, working to the substrate requirements we confirm for the selected system. The plan should name that party and the date the substrate is due ready, because panel installation cannot start ahead of it.
Talk to Us About Your Package
Send us your drawings, the rooms involved and your target site dates, and we will return a fabrication-ready specification with the substrate requirements attached. Contact PHILLIP on WhatsApp +86-13928214007 or by email at santerson@qq.com, or use our contact page.