A glass sliding door looks simple on a drawing: two panels, a track, a sheet of glass. The variation in price and performance between suppliers comes almost entirely from what the specification says and what it leaves out. When the request goes to a factory with only a width, a height and the word "glass", the supplier fills the gaps with their cheapest default - and the buyer discovers those choices at handover. The checklist below is the specification we ask our own project clients to complete before a glass sliding door goes into production.

Why vague door specifications cause rework

Sliding doors are made to fit an opening, not to a standard module. Once the frame is cut and the glass ordered, a change means scrap. Three gaps cause most of the disputes we see on residential and hospitality projects:

  • Undeclared opening conditions. A rough opening that has not been levelled, or a finished floor level that changes after the door is ordered, shifts every dimension by centimetres.
  • Unstated hardware duty. The same panel weight can be carried by light residential runners or by heavy-duty track systems; the price difference is significant and the wrong one fails within months of use.
  • "Glass" without a type. Clear, frosted, ribbed, tinted and mirrored glazing are different products with different costs, safety behaviour and privacy performance.

A good specification removes all three. It does not need to be a technical drawing - it needs to state the decisions in writing so that every quotation you receive prices the same door.

The eight fields a complete specification must contain

Work through these in order. A door enquiry that answers all eight can be quoted accurately by any supplier; one that leaves three blank will not.

FieldWhat to stateWhy it matters
Opening and finished sizesWidth and height at three points each; the finish floor and finish ceiling levels; which wall finishes abut the frame.Tells the factory whether to allow for out-of-square openings and where the track sits relative to the floor covering.
Panel layoutNumber of panels, which panel moves, direction of travel, and the pocket or overlap the opening allows.A two-panel door in a 1600 mm opening gives half the clear access; a three-panel layout needs a different track length.
Glass type and appearanceClear, frosted, ribbed, smoked or mirrored; surface treatment; colour or sheen of any frame.Fixes privacy, light transmission and the visual match with adjoining glass sliding door wardrobes or partitions.
Glass safety requirementWhether the location is a traffic area, a bathroom, or near floor level, and who signs off the safety glazing requirement for that location.Determines tempered or laminated construction. This must be confirmed with the project's designer or certifier per site, not assumed by the door supplier.
Frame and hardwareFrame material and profile; runner and track duty rating for the stated panel weight; handle and lock detail; soft-close or bumper stops.Hardware is where quiet operation and service life come from, and where substitutions are easiest to hide.
Threshold and trackRecessed or surface-mounted track; threshold material; drainage or seal if the door faces a wet area.Affects underfoot transition, cleaning, and whether the door is acceptable next to a shower or pool deck.
Ventilation and acoustic expectationWhether the door needs to seal for air-conditioning or dampen sound between rooms.Sealing and brush details change the profile and the price; state them before quoting.
Access, packaging and handoverPackaging standard, delivery address with lift or stair constraints, who installs, and the inspection record at handover.Full-height glass panels are damaged most often on site, not in transit - access must be planned, not discovered.

Match the specification to where the door is used

Bedroom and dressing room

Here the door is part of the storage joinery, so the finish has to match the carcass and the interior layout has to work with the hardware. Specify the interior configuration - hanging rail heights, shelf positions, drawer bank location - in the same document as the door. For a dressing room that opens onto an ensuite, state whether the glazing is clear or frosted; mirrored panels on mirror sliding door wardrobes are usually specified here to enlarge a narrow room, and the mirror then has to be reconciled with the lighting plan.

Bathroom and wet zones

Wet areas change two lines of the specification: the glass safety requirement and the threshold detail. Where a sliding panel separates a shower or spa zone, note the exposure to water and the cleaning regime, and confirm the frame finish's suitability with the supplier rather than assuming it. Where the door divides a bathroom from a corridor, specify the seal and the privacy grade of the glazing together - frosted and ribbed glass behave differently under artificial light.

Room division and open-plan living

Full-height glazed dividers are closer to a wall system than to a door, and should be specified as one. State the span, whether the panels run on a ceiling-recessed track, and whether the system needs to hold position acoustically. Our glass sliding panels are listed as configurable wall systems for exactly this reason: at full height the fixing detail, the track support and the glass build all have to be confirmed against the structural drawings before any panel is cut.

Office and hospitality fit-out

Repetition is the risk in a project with many identical doors. Specify one reference door in full, then list every deviation by room number - a differing threshold, an added lock, a different glass tint. That single schedule lets us produce all units in one batch and keeps quotations comparable across rooms.

What a made-to-measure supplier needs from you

Every SANTERSON sliding door, sliding panel system and built-in unit is produced to project dimensions rather than a catalogue size, with the material and finish selected per project. That flexibility only pays off if the input data is complete. In practice we need four things before we can give a firm price:

  • A dimension sheet showing each opening at three points, with the finished levels marked.
  • The glass and finish selection, referenced to a sample or a code - not a photograph.
  • The hardware duty level for the panel weight you intend to hang on it.
  • The name of the party responsible for confirming safety glazing and building requirements at each location.

If any of these are still open, say so in the enquiry. A supplier who quotes around an open question has made a decision for you; a supplier who flags it has given you a choice to price.

A practical test before you send the enquiry: give your specification to a second supplier cold and compare the quotations line by line. If the two prices differ by more than a small margin, one of them has silently changed a field - usually glass build or hardware rating. A specification that survives that comparison is one you can order against.

Confirming the specification before production

Treat the shop drawing as a contract document. Read it for four items: overall and leaf dimensions, glass type written in full, hardware model or duty rating, and the direction of travel. Sign nothing that says "glass" on its own. After manufacture, inspect on delivery before installation - check panel squareness, runner action and finish against the approved sample, and record any deviation while it can still be corrected at the factory.

Coordination across doors, wardrobes, partitions and the rest of the joinery is easier when one supplier holds the schedule for all of them. Our interior design service covers space planning, product specification and production coordination, so openings, finishes and hardware are fixed once and applied consistently across the project.

Send us your opening dimensions, glazing preference and the location of each door, and we will return a specification sheet for review before anything is cut. Talk to us through the contact page.