A square swim spa is easy to specify on paper and easy to argue about on site. The shell dimensions arrive correct, the equipment list matches, and then the finished surface, the coping line or the jet layout turns into a variation order. If you are specifying Outdoor Swim Spa WS-PC02 for a villa terrace, a garden courtyard or a resort wellness deck, the details worth locking down are almost never the big ones — they are the finishes and interfaces that get fixed to the building.

Start from what the catalogue already fixes

WS-PC02 sits in our configurable outdoor swim and hydrotherapy range. The published catalogue entry gives a square footprint of 3000 × 3000 × 1050 mm, one control system, two water pumps, one filter pump, 60 jets in total and one LED light, with water jets, LED lighting and ozone listed as the shown features. Total power is recorded at 7.35 kW for that configuration.

Treat those figures as the baseline of a specification, not as the order itself. The same page flags included equipment and electrical requirements as items to confirm for the selected configuration, and options such as control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps are listed as catalogue options whose availability and compatibility vary by model. Two buyers can order "a WS-PC02" and receive genuinely different machines.

Catalogue itemWhat to confirm before production
Dimensions 3000 × 3000 × 1050 mmWhether the figure is the outer shell or the internal water envelope, and how much room your slab, pit or deck framing needs around it
60 jets, 2 water pumps, 1 filter pumpJet positions relative to seating and lounger lines, and which pumps belong to the massage circuit versus the filtration circuit
Total power 7.35 kWSupply voltage, phase, dedicated circuit size, isolator location and who supplies the electrical run to the unit
Ozone, LED light (1 pc)Lamp colour and position, and whether ozone is the only sanitation method for your application or UV is added
Catalogue optionsHeat pump capacity, insulation package, steps type and sand filtration — each has a lead time and a compatibility check

Finish details that decide how the spa reads in the space

Ask for the finish schedule in writing, item by item. For an in-ground or semi-recessed installation, these are the points we ask buyers to sign off on a drawing before the shell is produced:

  • Shell surface and colour. Confirm the acrylic shell colour and gloss level against a physical sample, not a screen image, and confirm whether the finish continues onto the visible rim or stops below the coping line.
  • Coping and edge treatment. Decide who supplies the perimeter finish — stone, timber, tile or metal trim — and how it meets the shell. A 10 mm difference in coping width changes the whole visual proportion of a 3 m square.
  • Access hatch and equipment door. Confirm location, size and finish so filters, pumps and the control system stay reachable after the deck is closed in. This is the single most common regret on finished terraces.
  • Jet and fitting trim colour. Jets, returns, suction covers and the LED housing all have trim finishes. Match them to the tapware and shower fittings in the same project so the palette holds together.
  • Insulation and cladding face. Where insulation sits affects whether an exposed side needs a finished cladding panel, especially on elevated decks and indoor-visible installations.
  • Steps. moulded, timber or integrated steps change both the entry line and the deck layout; confirm the step type at drawing stage rather than at delivery.
Where a project needs a different footprint rather than a different finish, our Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool covers square, round, oval and curved shells with an acrylic shell and structural reinforcement. Confirm the shape, dimensions and equipment package for that route separately — it is a different build, not a colour option on WS-PC02.

Interfaces: the part of the drawing that causes variation orders

Most spa disputes are not about the spa. They are about the boundary between the spa and everybody else's scope. Before you place the order, put these on one coordinated drawing with your builder, plumber and electrician:

  • Slab or pit dimensions, waterproofing responsibility and the drain falls around the shell.
  • Water supply, fill and overflow routing, and the location of the filtration loop relative to the plant room.
  • The electrical run: isolator, conduit, and whether a heat pump is on its own circuit. The 7.35 kW figure is a starting point for that conversation with your electrician, not an instruction to them.
  • Delivery access and lifting. A 3 m square shell needs a route to the position it will sit in; confirm crane, gate width or lift capacity before the truck is booked.
  • Drying and curing sequence, so coping and decking trades are not asked to close in an assembly that has not been tested full of water.

How we handle these confirmations on a project order

For swim spa and hydrotherapy work, the confirmation sequence follows our standard project path: brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. Our Custom & OEM Service covers bespoke material finishes, textures and surface treatments alongside custom furniture design and prototyping, so a spa specified as part of a wider terrace or wellness area can be coordinated with the outdoor furniture, loungers and pergolas around it rather than ordered in isolation.

Where the spa is one line in a larger package, our Turnkey Solutions cover design consultation and space planning, material selection and product specification, manufacturing and quality control, project management with site coordination, and installation handover. That means the finish schedule for WS-PC02 can be reviewed against the same drawings that govern the poolside furniture, wall finishes and lighting around it.

Pre-order checklist

  • Signed finish schedule: shell colour and gloss, trim colours, coping detail, access hatch location.
  • Confirmed equipment list for the exact configuration — pumps, jets, ozone, UV, heat pump, insulation, steps.
  • Electrical and plumbing interfaces issued to your trades with responsibility marked on the drawing.
  • Delivery route and lifting method agreed, with a named receiver on site.
  • Commissioning sequence and snag list agreed before the surrounding deck is closed in.

Send us the model reference, your drawings and the finish you want to see, and we will confirm the equipment package, finish schedule and interfaces for that configuration before production begins. Enquiries go through our contact page.