A white acrylic wardrobe can carry the look of a whole bedroom floor, and it is also one of the easiest items to get wrong when it is made to order. The finish reads either crisp and expensive or flat and plasticky depending on decisions nobody wrote down. If you are sourcing from a China-based factory, the difference between those two outcomes is usually the quality of your brief, not the capability of the workshop. Here is what a usable brief contains.
Start With the Room Data, Not the Product Photo
Most enquiries open with an image and a colour name. That is the weakest possible starting point. A manufacturer cannot price, engineer or ship a wardrobe from a photograph, and a reference image tells them nothing about how the unit must behave in your building. Send the room first.
For each wardrobe type in the project, supply the finished floor level to finished ceiling height at several points along the wall, not one average number. Record the wall lengths, out-of-plumb readings, skirting or architrave depths, and the position of any switch, socket, air grille, downlight or door swing that the carcass will pass. Note the floor build-up and whether tiling or flooring is already installed or still to come, because that single detail changes the base panel height on every unit in the order.
Then state the room type and the use pattern: owner bedroom, guest room, hotel room, staff accommodation, serviced apartment. A wardrobe in a hotel room gets opened by hundreds of different people a year and needs a harder edge treatment and a more conservative hinge specification than the same elevation in a private villa.
Say What You Mean By White
"White" is not a specification. In an acrylic panel line, white covers warm whites with a yellow undertone, cool brights that turn grey next to a marble countertop, and off-whites matched to a paint colour on site. If your interior designer has already selected a paint or a stone, send the RAL or Pantone reference, or send a physical board you expect the panel to sit beside.
Then specify the surface reflectance. The White Acrylic Wardrobes in our acrylic collection are offered with a choice of sheen, and the same panel drawing looks completely different at high gloss and at a low-sheen matte. Gloss reflects the room, so it picks up every uneven wall and every fingerprint; a Matte Acrylic Wardrobe absorbs light and hides handling marks, which is usually the better answer in high-traffic guest rooms. Decide which you want before you request a quotation, because the two are not priced identically and the samples will not be comparable.
Ask for a signed sample panel of the exact batch finish, not a catalogue card, and keep that panel on site as the acceptance reference for delivery. Mark it with the project name and the date so nobody argues about it eighteen months later.
Specify the Carcass and the Interior, Not Just the Door
Doors are what people photograph; carcasses are what fail. Write down the board you want for the case and the back panel, the edge banding material and colour, and the thickness of each. State whether the interior match is white, a neutral, or a contrasting tone, because an open wardrobe shows its inside to the room.
Then give the internal layout as a drawing with dimensions, not as a sentence about "lots of hanging space". Our custom minimalist bedroom wardrobes are built around exactly this kind of layout decision: hanging zones, drawer banks, shelf stacks and display niches placed to suit how the room will actually be used. For each wardrobe type, tell the factory:
- Hanging heights you need — short hang, long hang for coats and dresses, and whether double hang is required.
- Drawer count, drawer depth and whether soft close is mandatory.
- Shelf spans, because a wide shelf loaded with folded linen will sag if nobody specified the span limit.
- Whether integrated lighting is wanted, and where the transformer may sit for servicing.
- Any security or housekeeping requirement for hospitality rooms, such as lockable compartments.
Give the Door System and the Opening Clearance
The door type determines whether the design works at all in a tight room. Sliding doors need clear run space and a track detail that accepts your ceiling finish; hinged doors need an arc that does not hit the bed, the bathroom threshold or the opposite wall. Walk-in layouts change the problem again. If you are undecided, send the floor plan with furniture positions marked and ask the factory to advise before they quote — a manufacturer who quotes without checking clearances is telling you something about how the order will be handled.
Also state whether you want a handleless detail. A handleless white panel wall is the look most projects are chasing, but it requires a profile or a recess to pull the door open, and that detail has to appear on the shop drawing before production starts.
Write Down How Many, Where, and in Which Sequence
Give quantities by room type. Ten identical hotel rooms need one wardrobe design produced ten times; a villa with six different bedrooms needs six drawings signed off individually. Mixed projects should be listed as a schedule: unit number, room, elevation, width, height, depth, door type, finish code.
The schedule to attach to your enquiry
| Item | What the manufacturer needs |
|---|---|
| Room schedule | Unit number, room name, quantity of each wardrobe type |
| Elevation drawings | CAD or PDF elevations with overall and internal dimensions, in millimetres |
| Site levels | Floor-to-ceiling heights at multiple points, wall deviation readings |
| Finish code | RAL or Pantone reference plus selected sheen level |
| Carcass specification | Case board, back panel, edge banding, interior colour |
| Hardware | Hinge and slide brand or grade, soft close requirement, locks |
| Delivery terms | Destination address, Incoterms, delivery sequence by phase |
Sequence matters more than buyers expect. Wardrobes are built-in work, so they have to arrive after the wet trades and flooring are finished but before the loose furniture and rugs go in. Tell your supplier which units are needed first and label the packing accordingly, otherwise the container arrives with the villa wardrobes on top of the hotel ones and every room waits.
Set the Approval Gates Before Production
A custom order should have three written approvals, and your brief should name them up front. First, a design approval on the elevations and internal layout. Second, a sample or first-article approval covering panel colour, sheen, edge banding and a drawer bank — one physical unit you can inspect beats any number of photographs. Third, a shop drawing sign-off with final dimensions taken from site, after the walls and floors are actually complete.
A supplier working to a custom and OEM service should be able to walk you through prototyping, material selection and finish trials as part of that process. If nobody proposes an approval sequence when they send the quotation, ask for one in writing.
Cover Freight, Installation and Snags in the Same Brief
Built-in joinery is not a flat-pack problem. State the delivery address, who receives the goods, whether there is a lift or only stairs, and whether panels must fit through a doorway or be split into sections for handling. Panel widths that pass in a drawing can fail on a stairwell.
Ask how the units will be packed, how the crate labelling maps to your room schedule, and what documentation comes with the shipment for customs clearance. Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, and the paperwork that travels with the consignment — but your brief still has to say which units go in which crate.
Finally, define what a completed installation looks like. Agree who installs, what tolerance you will accept on door alignment and reveal gaps, how snags are recorded, and how replacements for a damaged panel are ordered later. Panel colours age and batches vary, so record the finish code and batch reference with your project file at handover; that note is worth money three years down the line when one door needs remaking.
A practical test for your brief: send it to a second manufacturer without explaining anything, and compare what comes back. If their quotation assumes different carcass boards, a different sheen or no site survey, your specification had gaps — better to find them at enquiry stage than on site.
Put It Together as One Package
The brief that gets the best result is a single package: room schedule, dimensioned elevations, site levels, finish code with sheen, carcass and hardware specification, quantities by phase, delivery terms, and three named approval gates. Everything else — the reference photograph, the mood board — is decoration around that core.
If your project needs wardrobes coordinated with kitchen cabinetry, doors, wall panelling and bathroom fit-out from one production line, tell us about the project and we will work through design, manufacturing, delivery and installation as a single scope. Send drawings and quantities to start an enquiry.
SANTERSON manufactures custom wardrobes, cabinetry and interior fixtures for villa, hotel and apartment projects, with made-to-measure sizing, finish options and layouts tailored to each project.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com