A glass front aluminum frame cabinet looks simple from the outside: an aluminium frame, a sheet of glass, a box to hang on the wall. In practice it is one of the more detail-sensitive items in a kitchen package, because the frame profile, the glazing choice and the way the door meets the carcass all change what the factory has to build. That is why two enquiries for what appears to be the same cabinet can end up with very different prices.

If you are sourcing glass front aluminum frame cabinets for a villa, apartment or hospitality fit-out, the quality of your first enquiry largely decides how many revision rounds follow. The list below is the information our project team works from when costing these cabinets, and what each item actually affects on the quotation.

Start With the Room, Not the Cabinet

Cabinets are quoted as part of a run, not as isolated units. Before any door detail is discussed, we need to understand how the glazing sits within the rest of the kitchen.

  • Project type and location. A private residence, a serviced apartment block and a hotel kitchenette have different wear expectations and different approval processes. Tell us the building type and the delivery city.
  • Cabinet run drawing or site measurement. Overall wall lengths, heights, and where corners, windows, extractor ducting and appliances fall. A scaled plan is ideal; a set of site measurements with photographs works too.
  • Layout intent. Which sections are tall units, which are wall hung, and where the glazed doors should sit in the composition. Most clients mix glazed uppers with aluminium frame doors with solid panels so that everyday storage stays out of sight.
  • Existing or planned finishes. Floor, wall and benchtop finishes, plus the colour of appliances and tapware, so the frame tone can be matched rather than guessed at.

Frame Profile, Colour and Finish

The frame is what makes this style recognisable, and it is also where cost differences start. Please specify:

ItemWhat to provideWhy it matters
Profile widthNarrow, medium or a measured width from a sample or reference photoWider and heavier profiles use more extrusion and change the door thickness
Frame colourBlack, bronze, silver or a RAL reference; a physical sample if colour accuracy is criticalStandard tones are stocked, custom RAL finishes need a separate coating step
Finish typeMatte, textured or gloss surface on the aluminiumAffects both appearance and cleaning routine in a kitchen environment
Mitre detailWhether corners should read as clean 45 degree mitresMitred corners need more precise fabrication than butt joints

If you have a reference photo from a project you like, send it. A picture of the frame detail tells our team more reliably than a written description.

The Glass: Type, Tint and Treatment

Glazing is the second decision that moves both price and appearance. The aluminium frame kitchen collection covers several glazing options, so specify which one you want — they are not interchangeable:

  • Clear glass for full visibility of what is stored behind the door.
  • Frosted or reeded glass if you want light through but contents obscured — see our frosted glass aluminium cabinets for this treatment.
  • Bronze or smoked tinted glass for a softer, darker look that reduces glare in bright kitchens. Our smoked glass aluminium cabinets use this treatment.
  • Thickness and safety grade, including whether tempered glass is required for the doors. This is a specification decision on many commercial projects.
  • Edge treatment, polished or profiled, where the glass is visible at the frame line.

Tell us what is going behind the glass as well. Open shelving with display pieces behaves differently from a solid back panel, and both need to be built into the door and carcass detail before the order is cut.

Interior Layout and Hardware

Glazed doors invite people to look inside, so the interior needs as much thought as the front. Send us:

  • Shelf positions and quantities per unit, plus whether shelves should be adjustable.
  • Interior finish colour or material, since a light interior reads differently through clear glass than a dark one.
  • Door opening direction for each unit, and whether handles, push-open mechanisms or finger pulls are wanted on glazed doors.
  • Hinge type and any soft-close requirement.
  • Integrated lighting — strip lights inside the display units need wiring routes decided at the carcass stage, not after installation.

Sizes, Quantities and Tolerances

Give as much of the following as you can at enquiry stage:

  • Made-to-measure height, width and depth for each unit, or a drawing we can take dimensions from.
  • Total number of glazed doors and total linear metres of cabinetry in the run.
  • Floor-to-ceiling or free-standing, and how the top of tall units should be finished.
  • Floor level tolerance if walls are not square — out-of-plumb walls are common on renovation sites and change scribe and filler requirements.
  • Whether the same specification repeats across multiple apartments or guest rooms, and how many sets.

Delivery, Assembly and Site Conditions

The last block of information is logistical. Fully assembled cabinets and flat-packed panels ship differently, and the choice affects freight volume and on-site labour. Let us know:

  • Delivery address and whether it is a private residence, a construction site or a storage facility.
  • Access conditions: lift size, stair width, parking restrictions for delivery vehicles.
  • Whether your own trades install the cabinets or you want installation support from our team.
  • Target on-site date and any staged delivery requirement across trade stages.

Our project services cover material selection and product specification, manufacturing and quality control, logistics and door-to-door delivery, and installation and after-sales support, so the same team that quotes the cabinets can carry them through to handover.

A Short Enquiry Checklist

If you want a usable price quickly, send these six items in one message:

  1. Drawing or site measurements for the cabinet run.
  2. Number and size of glazed doors, and which units use solid panels instead.
  3. Glass type, tint and thickness, plus safety grade if specified.
  4. Frame colour and profile width, ideally with a reference photo or sample.
  5. Interior layout, lighting and hardware preferences.
  6. Delivery city, access notes and required on-site date.

With those details we can confirm dimensions and the selected specification for your project and return an itemised quotation rather than a rough range. Send your drawings to the SANTERSON contact page and our team will come back with questions on anything missing.

Can you quote from a photo alone? A photo helps us understand the style, but it cannot give us dimensions, quantities or site tolerances. Send the photo together with measurements and we can work from that.
Do glass front doors cost more than solid doors in the same frame? Usually yes, because of the glazing, the frame detail needed to hold it and the extra care in packing. The gap depends on glass type and size, which is why the glazing specification belongs in the enquiry.
Can glazed and solid doors be mixed in one order? Yes, and most kitchens are specified that way. Tell us which sections you want open to view and which should stay closed, and we will build the run accordingly.