A swim spa is one of the few outdoor purchases where the specification sheet and the finished installation are two different things. The unit arrives as a shell, a pump set and a control panel; what you actually use every day is the water system, the insulation, the power supply and the access arrangements built around it. This checklist walks through each line item for the Outdoor Swim Spa WS-115EⅢ-U, so that a buyer, contractor or project manager can compare quotes on the same basis instead of discovering omissions after delivery.
1. Confirm the shell dimensions against your site, not the other way round
The catalogue footprint for this model is 5280 x 2200 x 1250 mm. Before anything else, measure three clearances on site: the finished external footprint including steps and any cabinet cladding, the delivery route from the truck to the pad, and the service access needed later for the pump compartment. A spa that fits the terrace but cannot be craned over a wall or walked through a gate is unusable at any price.
- Internal water depth relative to the height of the tallest user who will swim or stand in it regularly
- Cabinet height plus freeboard, so wind-blown debris and splash do not overload the filter
- A level, load-bearing pad sized beyond the shell edge, with drainage away from the equipment compartment
2. Read the water system line by line
The published configuration for this model lists 24 jets in total, three water pumps and one filter pump, with a control system supplied as one set. Those counts matter more than marketing names attached to them. Ask your supplier to state which pump drives the jet bank, which drives the circulation loop, and what flow each delivers at the nozzle rather than at the pump head.
| Item on the sheet | What to verify before ordering |
|---|---|
| Jet total: 24 pcs | How many jets sit in the hydrotherapy seating area versus the swim or lap zone, and whether jet direction is adjustable for each station |
| Water pump: 3 pcs | Which circuit each pump serves, and what happens to jet performance if one pump is dedicated to a separate relaxation pool |
| Filter pump: 1 pc | Filtration media type, turnover interval for the full water volume, and whether the pump can be run on a timer at low speed |
| Total power: 9.65 kW | Whether this figure covers pumps, ozone and lighting only, or also includes heating; it determines your electrical service and tariff impact |
3. Decide what water treatment you are actually maintaining
Ozone is shown as a feature on this model. Ozone reduces oxidiser demand and helps keep water clear, but it does not replace a sanitiser or a regular testing routine. UV sterilisation appears in the optional accessories for the range, alongside sand filtration. Each option changes what you buy weekly and how often you clean equipment, so decide at quotation stage.
- Ozone generator: confirm output rating and replacement interval for the cell
- Optional UV sterilisation: confirm whether it is fitted inline with the circulation loop
- Sand filtration option: confirm tank size, cleaning procedure and drain provision on site
- Consumables: state who supplies sanitiser, test kits and filter media after handover
4. Specify the envelope: insulation, heating and cladding
An outdoor spa used year-round lives or dies on its thermal performance. Insulation is listed among the optional accessories for this range, together with heat pumps. Ask what material fills the cabinet, whether the shell underside and base are insulated as well as the walls, and how the cabinet cladding is fixed so that it can be removed for service without damage.
- Insulation type and coverage: walls, base, equipment compartment and lid
- Heat pump option: heating capacity against water volume, and the ambient temperature at which its output falls away
- Cabinet finish: colour and material, and whether it is rated for continuous outdoor exposure at your site
- Steps: integrated or separate, and their load rating and slip resistance
5. Lock down the electrical scope in writing
With a total power figure of 9.65 kW on the catalogue sheet, the electrical work is a separate trade package and should be quoted separately by a licensed electrician at the destination. Confirm supply voltage and phase for your country, the dedicated circuit and protective device rating, cable routing, bonding and earthing, and the location of the isolator relative to the water edge. Local regulations differ, and the installed electrician signs off compliance, not the spa manufacturer.
6. Check lighting and controls against how you will use the space
Two LED lights are listed for this model. That suits evening bathing around the seating area; if the spa is set into a landscape where you want the water itself lit from several angles, ask whether additional fixtures can be added to your configuration and how they are sealed. For controls, confirm which functions are adjustable remotely from the panel - temperature setpoint, jet speed, filtration cycle and lighting - and what happens after a power cut.
7. Match the model to the range before you fix on one unit
Santerson publishes a broad selection in its Swimming Pools and Swim Spas category, including longer layouts with a separate relaxation pool and configurable outdoor spas where the shape is set to suit the plot. If 5280 mm of length does not suit your terrace, or if you need a square or curved outline for a landscaped courtyard, compare alternatives in the same category rather than forcing one model into an awkward position.
8. Cover delivery, installation and after-sales in the same purchase order
Buying a spa as part of a wider fit-out is simpler than coordinating it alone. Santerson operates as a one-stop furniture and building materials supplier, handling design support, custom and OEM production, freight by sea, air or rail with door-to-door delivery, plus installation and after-sales support. That means the spa can arrive on the same schedule as outdoor furniture, paving, pergolas and bathroom fixtures for a villa or resort project, with one party accountable for what is in each shipment.
- Packaging list per crate, so you can check contents against the packing list at the gate
- Lifting equipment and site access agreed before the truck arrives
- A named contact for commissioning, spare parts and warranty claims after handover
- Written confirmation of which accessories are included versus priced as options
The checklist in one page
- Site: pad, clearances, delivery route, service access, drainage
- Shell: 5280 x 2200 x 1250 mm footprint confirmed against measurements
- Water system: jet layout by zone, pump assignment, filtration turnover
- Treatment: ozone scope, optional UV and sand filtration, consumables plan
- Envelope: insulation coverage, heat pump sizing, cabinet cladding, steps
- Electrical: voltage and phase, dedicated circuit, bonding, isolator position
- Controls and lighting: functions adjustable, sealing of added fixtures
- Model fit: alternatives reviewed in the swim spa category if dimensions do not suit
- Commercial: freight, lifting, commissioning, spares and after-sales named in one order
Send us your drawings and requirements
Share the site dimensions, your country's supply voltage and how you intend to use the spa: daily exercise, hydrotherapy, or guest leisure at a villa or resort. We will confirm which configuration of this model fits, what is included, and what should be quoted as an option. If your project also needs outdoor furniture for villas and resorts, paving or bathroom fixtures around the spa, we can coordinate them on one delivery schedule.