A sample swim spa and a written proposal answer different questions, and most procurement mistakes happen when the two are treated as one document. This guide uses Outdoor Swim Spa WS-PC07A-T as the reference model, so every comparison step below can be applied line by line before you sign a purchase order for a villa terrace, a resort pool deck or a private wellness area.
Start With the Site Conditions, Not the Model Number
The catalog lists WS-PC07A-T at 7000 × 3000 × 1470 mm. Before you ask any supplier to quote that shell, write down what your site actually allows: clear access width for delivery, a slab or pad that carries a full water load, drainage around the perimeter, and the electrical supply available at the plant location. Total power in the catalog entry is 11.55 kW; whether that arrives as single phase or three phase, and how the circuit is protected, is site-specific work that belongs in your contractor's scope.
Put these site conditions into the same document you send to suppliers. A proposal written against your slab drawing can be compared with another proposal written against the same drawing. A proposal written against a brochure cannot.
What a Sample Is For, and What It Cannot Prove
For a configurable product in our Swimming Pools and Swim Spas range, a "sample" usually means one of three things:
- A built unit you can inspect in person or on video call: shell mould, acrylic thickness at the corners, jet faces, seating depth, step geometry, cabinet cladding and cover finish.
- A component sample set: a jet body, a section of insulation, the filter and ozone plumbing layout, the control panel interface, an LED face ring.
- A reference installation: an existing project where the same or a close configuration has been running long enough to comment on maintenance access and wear.
What a sample does prove is build quality, ergonomics and finish. What it cannot prove is what your finished order contains, unless the proposal for that order describes the exact same parts. So photograph the sample, then match each photographed item to a line in the quotation. If an item appears on the sample but has no line in the proposal, it is either an option or an omission, and you should know which.
Read the Specification Sheet Line by Line
The catalog entry for WS-PC07A-T shows: control system 1 set, swim training system 1 set, water pump 1 pc, filter pump 1 pc, jet total 56 pcs, LED lights 4, total power 11.55 kW, with water jets, LED lighting, ozone and a swim training system listed as the features shown. Two neighbouring models in the same series share a similar footprint but different equipment counts, which is exactly why you compare specifications rather than model names.
| Catalog item | WS-PC07A-T | WS-PC07A | What to check in a proposal |
|---|---|---|---|
| Catalog dimensions (mm) | 7000 × 3000 × 1470 | 7000 × 3000 × 1470 | Internal water volume and swim lane length, not just the outer shell |
| Swim training system | 1 set | Not listed in the captured specification | Whether the swim unit is included or an add-on, and its flow rating |
| Water pump | 1 pc | 4 pcs | Pump count, output each, and which circuit each one serves |
| Jet total | 56 pcs | 62 pcs | Jet positions on the shell drawing and adjustable or fixed heads |
| LED lights | 4 | 1 | Fitting count, colour control and whether the driver is included |
| Total power | 11.55 kW | 9.55 kW | What the figure covers: pumps, ozone, controls, and heat pump if added |
| Features shown | Water jets, LED lighting, Ozone, Swim training system | Water jets, LED lighting, Ozone | Each named feature needs its own priced line item |
The point of the table is not that one model is better. It is that two shells with identical external dimensions can carry very different equipment sets and very different running loads, so a price difference is only meaningful once the lines above are aligned.
Compare Proposals on Configuration, Not Headline Price
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option must be confirmed in writing for the unit you are ordering. When two proposals for WS-PC07A-T sit side by side, build a single sheet with these rows:
- Shell and structure: shell material and mould, insulation package, framing, cladding colour or finish, access panel positions.
- Water treatment: filter pump and filtration route (cartridge or sand), ozone generator output, UV sterilizer if quoted, dosing arrangements.
- Hydrotherapy and swim: jet count and type, swim training unit specification, air or water driven, control location.
- Heating and running cost: heat pump capacity if included, insulation level, cover specification, expected electrical connection.
- Controls and lighting: control system set, LED fitting count, dimming or colour control, low-voltage supply.
- Accessories: steps, handrail, cover, spare-jet pack, shipping crating and lifting points.
Ask for the Same Drawing Package From Every Bidder
Request three drawings from each supplier, all keyed to your chosen model: a plan view with jet positions and seating depths, a section showing water level against coping height and step heights, and a plant-room or equipment layout with service access clearances. With those three sheets you can see whether 56 jets are distributed for therapy or concentrated in one zone, whether the swim training unit leaves enough lane length for a useful stroke, and whether a filter pump can actually be removed for cleaning without draining the spa.
Practical checks during a sample inspection
- Press on the shell and seating surfaces; note flex and how the acrylic finishes at radiused corners.
- Sit in each seat with water off, then with jets running, and check whether head and shoulder support stay comfortable when the jets are open.
- Open every access panel and confirm a hand can reach the filter pump, ozone unit and control board.
- Operate the control system and note how clearly setpoints, pump stages and lighting are shown.
- Inspect the cover, its insulation core and how it is lifted and stored on site.
Put the Commercial Terms Into the Same Format
Once the technical sheets match, compare the commercial terms in one short list: what is included at the quoted price, what is excluded (crating, freight, crane or forklift time on arrival, civil and electrical works), how options are priced, what the packing and container loading plan looks like, and what documentation comes with the shipment. Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, so we can quote the delivered leg against the same Incoterms as any other bidder. Import terms, duties and transit times are confirmed case by case for each destination.
For a project that also needs poolside furniture, pergolas or changing-area fit-out, ask whether the swim spa is quoted on its own or inside a combined package. A combined quotation is useful only if it still lists every swim spa line item separately; otherwise you lose the ability to compare.
A Five-Column Comparison Sheet You Can Fill In Today
Column 1 — Item: every row from the catalog specification plus every option you want.
Column 2 — Your requirement: what your design and site conditions demand.
Column 3 — Bidder A: included, optional at a price, or not offered.
Column 4 — Bidder B: same three answers.
Column 5 — Evidence: sample photo, drawing number or written confirmation date.
A sheet like this turns a price gap into an explanation. If one proposal is lower and column 3 shows fewer LED fittings, no heat pump and cartridge rather than sand filtration, you now know the gap is configuration, not value.
Before You Sign
- Confirm included equipment and electrical requirements for the selected configuration in writing, model by model.
- Match every sample photo to a priced line in the proposal.
- Have your civil and electrical contractor read the same section drawing the supplier quoted against.
- Keep the option list (UV sterilization, heat pump, sand filtration, insulation, steps) priced but unselected until you decide, so no bidder is quoting a different product from another.
Send us the model list, your site drawings and the specification rows you need confirmed through our Contact page, and we will return a proposal written against your documents rather than a catalogue sheet.