A design brief for a villa or hospitality project usually describes the look of a room long before it describes a single piece of joinery. Open shelving is a good example: the drawings may show "open display" and nothing else, while the buyer, the designer and the factory all picture something different. This article walks through how to convert that brief into a complete enquiry for Santerson Open Display Units, so the quotation you receive matches what will actually be delivered and installed.
Start with the role the unit has to play
Before any dimension is discussed, state in one sentence what the open display area must do in the space. Is it a wall of shelving that carries books and objects in a villa living room? A recessed niche inside a larger storage wall in a guest suite? A display zone beside closed cabinetry, where most items stay out of sight and only a few are shown? The answer changes the construction, the shelf spacing and how much closed storage sits around it.
Santerson's built-in furniture catalogue covers both readings of this brief. Open display units sit in the Display Cabinets collection, while Santerson Open Display Niches belong to the Integrated Storage Walls collection, where open bays are set into a full-height wall. If your brief shows an open box in isolation, ask the designer whether it should read as a separate cabinet or as part of a continuous wall finish.
Send the dimensions that define the opening
These units are made to measure, so the enquiry needs measured information rather than a model number. For each location, provide:
- Overall height, width and depth of the unit, and whether it is floor-standing, wall-mounted or recessed into a niche.
- Finished floor and finished wall levels, so heights are quoted against the surfaces the unit will meet on site.
- Shelf count and shelf spacing you expect, plus any fixed shelf that must carry heavy items such as stone, ceramics or art books.
- Obstructions to work around: skirting, cornices, downlights, switches, air grilles, radiators, doors that swing into the unit and services behind the wall.
- Whether the unit continues into adjacent joinery, and if so which collection that joinery comes from, so the reveal and edge details can be matched.
Specify finish and material as choices, not adjectives
Words such as "warm oak" or "matte black" mean different things to different manufacturers. Finish, layout and material are all specified per project on these units, so list them as decisions: the substrate and surface you want, the sheen level, the edge treatment, and whether the shelf edges are the same material as the carcass or a contrast. The Custom & OEM service covers bespoke finishes and textures alongside custom furniture design and prototyping, which is the route to take when a finish has to match an existing sample rather than a catalogue option.
Two practical details save rework later. First, state whether the visible faces must match another product already on site, and send a reference — a sample number, a photograph or a physical swatch in post. Second, say which faces will be seen from a walkway or a doorway, because that determines where finished edges are required and where a plain back is acceptable.
Decide on lighting and load before quotation
Open display areas fail in two ways: they are too dark to display anything, or the shelves sag. If you want lighting, say whether it is integrated into the shelves, concealed in a top reveal, or supplied separately by the electrical contractor, and confirm who provides the driver and where it will be accessible for maintenance. Lighting is also offered as part of configurable shelving and display joinery, so where a project needs it, ask for the integrated option rather than treating the lights as a separate purchase. Confirm the electrical specification and compatibility for the chosen configuration with the factory before the drawing is signed off.
For loading, list what each shelf will hold. Books and dense ceramics need different spans and thicknesses from decorative objects, and a shelf over 900 mm wide behaves differently from one at 400 mm. Passing this list with your enquiry lets the factory set the shelf construction rather than defaulting to a standard span.
Package the enquiry with the rest of the joinery
A single open unit quoted on its own is rarely the cheapest or the most coherent outcome. If the same project also needs kitchen cabinetry, wardrobes, media walls, doors or wall panelling, group them in one enquiry through Turnkey Solutions. Santerson is a China-based furniture and building materials manufacturer providing design, custom and OEM production, door-to-door delivery, installation and after-sales support, so consolidating the joinery means one set of drawings, one production schedule and one delivery window instead of several suppliers reconciling dimensions between themselves.
That matters most where a display unit meets another trade. A wall-mounted unit needs a wall that can take the fixings; a recessed niche needs the reveal dimension to be set before the wall is closed up; a full-height storage wall needs its setting-out line agreed with the flooring. Bundling the scope lets those interfaces be resolved once, in production coordination.
Confirm the commercial terms in writing
Once the technical package is settled, close the enquiry by confirming what the quotation covers. Ask for the unit price broken down by location, the material and finish schedule, packaging and container loading arrangements, the shipping route and delivery address for door-to-door service, the customs documents to be provided, and the scope of on-site installation and inspection at handover. Freight, duties and delivery terms vary by destination and should be confirmed case by case rather than assumed from a previous order.
A short enquiry checklist
- One sentence per location: what the open display area is for.
- Height, width, depth, mounting method and finished-level references.
- Shelf layout, spans and what each shelf must carry.
- Finish schedule with sheen, edge treatment and any match-to-sample reference.
- Lighting intent, control and maintenance access.
- Interfaces with flooring, walls, doors and adjacent joinery.
- Project address, delivery terms expected and installation scope required.