A bar unit that looks right in the render and arrives wrong on site almost always traces back to one thing: a specification written in adjectives instead of fields. "Custom size, modern finish, with lights" tells a factory nothing it can build from. This guide walks through the six fields we ask every buyer to complete before we quote a Santerson Integrated Bar System, and shows what each one changes in production, packaging and installation.
What an integrated bar system actually covers
In our catalogue, integrated bar systems sit in the Bar Cabinets family alongside Santerson Compact Bar Cabinets, Santerson Glass Front Bar Cabinets, Santerson Island Bar Units and Santerson Wall Mounted Bar Units. The difference is scope. A compact cabinet occupies one wall opening. An integrated system ties several elements together — carcass, door fronts, worktop, glazing, appliances and lighting — into a single run that has to line up with the surrounding joinery, flooring and ceiling.
That wider scope is exactly why the specification matters more here than for a standalone piece. Every element shares dimensions with its neighbour, so an undecided item does not stay undecided: it becomes a site problem later.
Field 1 — Location, use and daily load
Start with the room and the routine, not the drawing. Tell us whether the unit serves a villa kitchen, a pantry wall, a media wall, a study or an entertainment space, and how it will be used day to day. A bar run that carries glassware daily needs different shelf depths, door heights and interior fittings from one used a handful of times a year.
Also state what sits inside: refrigerated drawer, wine storage, kettle, coffee machine, decanters, stemware, dry goods. Each appliance or item drives a cut-out, a load requirement, a ventilation gap and a power point. When we receive "bar cabinet with appliances" and nothing else, the drawing comes back with placeholders — and someone has to resolve them on site.
Field 2 — Dimensions, with the tolerance stated
Give us the opening width, height and depth, plus the finished floor level and where the wall finishes end. Then say which of those numbers are fixed and which can move by a few millimetres. That distinction is what lets us design either a fully made-to-measure carcass or a standard module with a scribe panel.
- Fixed dimension: an opening between two structural walls, or a run that must align with an existing bench height.
- Flexible dimension: the width of an end return, or a niche we can close off with a filler panel.
Send the dimensions as a sketch with numbers on it, not only a plan view. Height information buried in a drawing legend is the single most common cause of rework on tall bar runs.
Field 3 — Material and finish, named not described
"Grey matte" is not a specification. Our configuration sheet asks for the substrate, the surface system and the colour reference. Wood, metals, engineered stone and laminates are all available for bespoke work, but each behaves differently on a tall door: a large slab front in one finish may be perfectly flat, while the same size in another needs a different core or a tension channel.
For each visible surface, record:
| Element | What to specify | Why it changes production |
|---|---|---|
| Door fronts | Substrate, surface (lacquer, veneer, laminate, acrylic), colour or grain reference, sheen level | Sets core construction, edge treatment and whether large doors need reinforcement |
| Carcass | Panel thickness, interior colour, edge banding | Affects open shelving appearance and how the unit is assembled for shipping |
| Worktop | Material, thickness, edge profile, splashback return | Cut-outs for sinks or appliances must be dimensioned before fabrication |
| Glass | Type (clear, bronze, smoked, ribbed, reeded), frame profile, glazing method | Determines door weight, hinge specification and packaging class |
| Hardware | Hinge type, soft-close, handle or handleless profile, drawer system | Ordered separately and matched to door weight and panel thickness |
Field 4 — Lighting, with the electrical handover defined
Integrated lighting is where specifications fail most often, because it sits between two trades. If your system includes lit niches, glass-front cabinets or under-shelf strips, specify the fixture type, the colour temperature and — this is the part usually missed — who supplies the transformer, the switch and the feed, and where they are located.
We can build lighting into the run as part of integrated cabinet lighting, or coordinate it with wider integrated lighting systems elsewhere in the same wall. Either way, the electrician needs a dimensioned setting-out drawing showing cable outlets and access points before first fix. Write that handover into the specification as a named responsibility, not an assumption.
Field 5 — Interface conditions with the building
An integrated system meets flooring, skirting, wall finishes, ceiling and sometimes an adjacent appliance run. Record each interface: does the carcass sit on the finished floor or on a plinth; does the skirting stop at the cabinet or continue behind it; is there a shadow gap or a flush junction; how does the top of the unit meet the ceiling line.
These decisions change panel sizes and assembly sequence. They also decide whether the unit can be installed after decoration or has to go in first, which affects the whole site programme.
Field 6 — Commercial terms: MOQ, packaging and delivery scope
Because these units are made to order, tell us the quantity across the project early. Our Custom & OEM service works with flexible minimum order quantities, but batching several bar runs into one production order is usually cheaper than releasing them one at a time, and it keeps the finish batch consistent.
State the delivery address and how far the goods need to travel. Our logistics covers freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, so confirm whether you want the units delivered to a port, to site or into the specific apartment or floor. Glass-front and lit components are packed differently from flat-pack carcasses, and the packing class is set from the specification, not guessed afterwards.
A specification block you can copy
If you send these lines filled in, we can return a drawing and an accurate quotation without a round of clarifying questions:
- Project, room and contact; target installation month.
- Product reference: Integrated Bar System, Island Bar Unit, Wall Mounted Bar Unit or Compact Bar Cabinet.
- Opening dimensions with fixed and flexible values marked; finished floor level noted.
- Appliances and stored items list, with model numbers where appliances are already selected.
- Finish schedule per element: fronts, carcass, worktop, glass, hardware.
- Lighting schedule: fixture type, colour temperature, transformer and switch responsibility.
- Interface notes: floor, skirting, ceiling junction, adjacent cabinetry.
- Quantity, delivery address and delivery point; Incoterms if already agreed.
How this fits our one-stop scope
Bar runs rarely stand alone on a villa or hospitality job. The same wall usually pulls in tall cabinets, pantry fronts, display shelving and the adjacent kitchen run, and those items need to share a finish batch and a tolerance philosophy. As a one-stop furniture and building materials supplier, we produce those related elements in the same facility, which is where the specification discipline pays back: one approved schedule covers several trades.
Our workflow runs from design consultation and space planning through material selection, product specification, manufacturing with quality control, project management and site coordination, then installation and handover. Send a complete specification at the start and most of that sequence moves without renegotiation.
Send us your bar system schedule
Share the eight lines above with your drawings and we will review them against our production standards and reply with a configuration proposal. Our contact page lists phone, WhatsApp and email, with enquiries answered within 24 hours during business days.