A media wall that mixes open shelves with closed cabinets looks effortless when it is finished, and awkward the moment something in the room was not planned for. The Santerson Open & Closed Combo Units sit in our TV Cabinets / Media Units collection and are built around that mix: open bays for what you want to see, doors for what you would rather not. Because each unit is made to measure, the decisions that shape the result are project decisions - the wall, the equipment, the habits of the people using it, and the services behind the piece.
What the product actually is
The Open & Closed Combo Units are a configurable media unit rather than a fixed catalogue size. Finish, layout and dimensions are specified to suit each space, and the storage split - how much open bay, how much cupboard, where the television sits - is confirmed for each project. That flexibility is the whole point, and it is also why the surrounding details matter so much: there is no standard box to squeeze a room into.
Where the wall needs to run wider or taller than a single unit, the same logic carries across our other collections. Santerson Storage & Display Combo takes the open-and-closed idea into the Media & TV Walls range for full-wall compositions, and Santerson Mixed Open & Closed Storage does the same inside an integrated storage wall, when books, crockery or everyday clutter share the wall with the screen.
Project details that decide the configuration
- Wall and room dimensions. Width, ceiling height and clearances are taken from the completed shell. A made-to-measure unit follows the actual wall, including skirting, cornices, uneven reveals and anything that runs across it.
- The television and the equipment. Screen size and mounting method set the opening for the display; consoles, soundbars, routers and speakers set the number of shelves, the ventilation they need and where sockets have to land.
- Power, data and cable routes. Socket positions, television cabling and any conduit are fixed before panels are cut. This is the detail most often discovered too late.
- The open-to-closed ratio. Count what genuinely belongs on display and what should be out of sight. A wall that is mostly open shelves becomes a dusting job; a wall that is all doors loses the display you wanted in the first place.
- Who uses the room. Young children point to glass and open bays, so lower sections often work better as closed storage. A formal living room rarely needs the same capacity as a family room.
- Mounting and fixing. Wall-mounted arrangements depend on the wall behind the finish and on what has to be carried. Freestanding units change the load question entirely, so the fixing method is confirmed with the layout.
Materials, finishes and lighting
Panel material, wood tone and surface finish are chosen per project, and the choice should be made against what is already in the room - flooring, joinery, doors and wall colour. A media unit that matches one sample swatch but fights the rest of the living room will read as an addition rather than as part of the house.
Lighting is a second decision that has to be made early. Integrated lighting inside open bays changes shelf depths, cable routes and switch positions, so it is designed in, not added on afterwards. Where a lit display is central to the design, Santerson Integrated LED Media Units cover that configuration from the start; if only niches and shelves need to glow, Santerson Open Display Niches carry the lighting into an integrated storage wall. Lighting and electrical specifications are confirmed for the chosen design in both cases.
How it fits with the rest of the wall
A combo unit rarely stands alone. If the brief is a wall that reads as panelling with the screen concealed, sliding panel and integrated TV panel systems in the Media & TV Walls collection are usually the better starting point. If the brief is storage first - books, records, collections - modular bookshelf systems and floor-to-ceiling modular systems let the same material palette run around the television. If the brief is a lighter footprint with nothing touching the floor, floating wall-hung units answer it.
The point is not to buy one product in isolation but to fix one layout for the whole wall, then let each part of it be made to that layout. In practice two clients with almost identical walls can ask for opposite answers - one wants the screen concealed behind a panel and the display kept behind glass, the other wants the television bare and the clutter hidden. Both layouts are workable, and neither can be settled from a catalogue page.
What we confirm before production
- Dimensions and level. Survey of the finished shell, then drawings checked against the wall as built.
- Storage layout. Shelf positions, drawer configuration, door type and handle detail.
- Materials and finish. Panel material, edge treatment, colour and texture samples.
- Hardware and fixing. Hinges, runners, mounting method and the substrate behind them.
- Electrical and lighting. Socket positions, cable routes, driver access and switching.
In our whole-house projects the same sequence applies. In a mid-century modern residence we built an entrance cabinet with open display niches and paired it with a living room sideboard combining floating shelves and closed cabinets under a stone countertop, so display and concealed storage were resolved as one design (Custom Mid-century Modern Whole House Custom Furniture Project). In another home, cabinet dimensions were measured on site so the joinery lined up with appliances and layout before anything was manufactured; there, the open staircase bookshelf and the closed kitchen drawers answered the same question in a different part of the house (Mid-century Whole House Custom Cabinetry & Built-in Storage Project).
Working with a one-stop supplier
Selecting a media unit is easier when the same supplier also handles the finishes around it. As a one-stop furniture and building materials supplier, we take built-in joinery, loose furniture, wall systems and fittings through the same process: site measurement, design and 3D rendering, production, delivery and on-site installation. That single chain is what keeps a media wall consistent from drawing to installed wall, and it means dimensions, finishes and electrical points are coordinated once rather than negotiated between several trades.
A short checklist before you specify
- Measure the full wall, not just the run of the unit - including height to cornice.
- List every device that will live in or on it, with its dimensions.
- Mark socket, aerial and data positions on the drawing before panels are made.
- Decide the open-to-closed split by counting real items, not aspirations.
- Approve material and finish samples against the room's existing surfaces.
- Confirm lighting, hardware and mounting method with the final layout drawing.
If you are planning a media wall and want the open-and-closed balance resolved on paper before anything is cut, send us the room dimensions, a photo of the wall and your equipment list. We will come back with a layout and a specification for the unit rather than a fixed catalogue size.