A furniture and fit-out quotation is only as good as the information behind it. Two enquiries that look similar on paper can produce very different prices once dimensions, finishes, quantities and delivery terms are unpacked. For buyers sourcing from a one-stop furniture and building materials supplier, the practical question is not whether the supplier can quote, but whether your brief contains enough detail for that quote to be accurate, comparable and safe to build against.

Why thin enquiries come back with thin prices

When a request only says "30 guest room wardrobes" or "poolside lounge set", the manufacturer has to guess. Every guess becomes either an assumption buried in the price, or a variation order later. Custom work at SANTERSON runs through design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover — so the detail you supply at the start is what each of those stages works from.

A vague brief also kills comparison. If Supplier A quotes on one set of assumptions and Supplier B on another, the price gap tells you nothing about value. The sections below list the project details that let a hotel and apartment interior fixtures package, an outdoor collection or a full villa fit-out be quoted line by line.

1. Room-by-room quantities with a schedule, not a total

Give unit counts by room type and by item. "80 apartments across three configurations" is far more usable than "a large residential project". A workable schedule names each item, the quantity per room type, and the number of rooms of that type.

  • Item list per room type: loose furniture, built-in cabinetry, sanitaryware, lighting, floor and wall finishes.
  • Quantity per room type, multiplied by the number of rooms — including spares for future replacement.
  • Room schedule or marked-up floor plan showing where each item sits.

This matters most on built-in work. Single vanities, wardrobes and tall cabinets are made to measure, so the count alone never fixes the price — the opening dimensions do.

2. Dimensions, levels and interface conditions

For anything custom, send finished internal dimensions and the floor-to-ceiling height of each space, plus a note on which dimension is fixed and which can flex. Then add the interface conditions that are usually discovered on site:

  • Sanitaryware outlet type and rough-in — an S-trap floor outlet and a P-trap wall outlet are not interchangeable.
  • Where power, data and water points fall relative to cabinets, mirrors and integrated lighting.
  • Floor build-up and finished level, which decides door heights, skirting detail and whether a cabinet sits on the finished floor.

The 1038A two-piece washdown toilet, for example, is offered with both wall-outlet and floor-outlet options; specifying the trap type and rough-in in the enquiry removes one round of drawings before pricing.

3. Materials, finishes and hardware specified by name

"Modern grey wardrobe" is a mood; a finish code is a specification. State the panel material, surface treatment, colour reference and edge detail, and say which hardware you expect — hinges, drawer slides, soft-close, handles or handleless profiles.

For cabinetry, SANTERSON supplies customised sizes, panel materials, surface finishes and matching hardware such as hinges, slide rails, support legs and brackets. For cladding and ceilings, an aluminium honeycomb panel can be ordered with a solid coating, perforated face or natural stone veneer — three very different prices from one product family. With custom and OEM work, bespoke finishes, textures, engraving, embossing, logos and packaging are all part of the brief, so name them in the enquiry rather than adding them later.

4. Use conditions: contract grade, exposure and traffic

The same silhouette behaves differently in a private villa and a hotel lobby that sees hundreds of people a day. Tell the supplier who uses the item and where it sits.

Detail to stateWhy it changes the quote
Interior or exterior, and how close to water or pool chemicalsOutdoor frames, cushion fabrics and fixings are specified differently from indoor pieces.
Daily user load — guest room, ballroom, private residenceHardware grade, panel thickness and maintenance access follow the traffic level.
Cleaning regime and housekeeping accessSurface choice drives whether a finish stays presentable after repeated cleaning.
Fixed or reconfigurable layoutModular systems cost differently from site-built fixed joinery.

A powder-coated aluminium outdoor sofa set intended for a resort terrace is quoted on different assumptions from the same layout specified for a covered residential patio. For wall-to-wall carpet in a banquet hall, fibre blend, pile and pattern are part of the specification, not decoration.

5. Drawings, samples and approvals you already hold

State what exists on your side: architectural or joinery drawings, elevations, 3D renderings, a finish board, an approved sample, or nothing yet. If you have no drawings, say so — design support, space planning and 3D visualisation are part of the service, and knowing that upfront changes the scope of the quotation rather than surprising you with it later.

Also state the approval route: who signs off samples, who signs off the first article, and whether a physical sample is required before production. Samples before bulk production are available on items such as custom carpet and cabinetry finishes; whether they are needed is your decision, but it belongs in the enquiry because it affects both schedule and cost.

6. Delivery terms, packaging and phasing

Freight and packaging assumptions quietly reshape a number, so treat them as part of the specification rather than an afterthought. Include:

  • Destination port or site address, and the Incoterm you want quoted.
  • Mode — sea, air or rail — and whether customs clearance is on your side or the supplier's.
  • Packaging standard: flat-pack, assembled, crate type, and labelling by room number for site handover.
  • Phasing: which packages ship first, and whether storage between shipments is needed.

SANTERSON arranges freight forwarding, export paperwork, container loading, shipment tracking and door-to-door delivery, then on-site installation support and after-sales service. Tell us the site access conditions too — lift size, stair width, crane or hoist availability — because packaging is sized to fit the route from the dock to the room.

7. Budget range and decision dates

A realistic budget band lets the manufacturer propose materials at the right level instead of quoting one safe option and leaving you to guess what can be traded down. Pair it with your hard dates: sample approval date, production window, vessel cut-off and site handover. Where a date cannot move, say so explicitly — production scheduling is built backwards from the on-site completion date.

What to expect back from a competent supplier

A quotation built on the details above should come back with more than a total figure. Before comparing suppliers, check that each quote includes:

  • Line-item pricing by room type, with quantities restated so you can compare two suppliers on identical scope.
  • Drawings or elevations showing assumed dimensions and finish references.
  • A stated validity period and what is excluded.
  • Packaging, freight terms and lead time written against the order, not implied.

If any of those are missing, ask for them before you compare prices. Comparing two incomplete quotes is how projects end up with variation orders after production starts.

Enquiry checklist: send these before asking for a price

  • Room schedule with itemised quantities per room type
  • Floor plans or elevations, marked up where items sit
  • Finished dimensions and levels for all made-to-measure items
  • Trap type and rough-in for sanitaryware; power and water point locations
  • Panel materials, finish references and hardware expectations
  • Use conditions: interior or exterior, traffic level, cleaning regime
  • Destination, Incoterm, preferred freight mode and phasing
  • Packaging and labelling requirements for site handover
  • Budget band and the dates that cannot move
  • Who approves samples and first articles

Specifications, finishes and dimensions in this article are examples of what to state in an enquiry. Confirm every dimension, material grade and performance claim against the drawings and technical sheets for your own project before ordering.

Send your room schedule, drawings and finish list to SANTERSON, a China-based furniture and building materials manufacturer supplying villa, hospitality and office projects since 2008. We review the brief, return drawings and an itemised quotation, then take the package through production, delivery and installation.