An integrated countertop vanity looks simple on a drawing: one continuous top, a basin set into it, cabinetry below. On site it is one of the few bathroom elements where several trades meet at once — joinery, stone, plumbing, tiling and electrical. A Santerson Integrated Countertop Vanity is supplied to project-specific dimensions with selectable finish and layout, which means the coordination work falls on your installation plan rather than on a catalogue size. The checklist below covers what that plan should carry before the unit is manufactured, shipped and fixed in place.

1. Measured site conditions, not design dimensions

Record the finished dimensions of the room, not the structural shell: finished wall-to-wall widths after tiling or waterproofing, finished floor level, and the position of door swings and any projection into the space. Note the exact location of soil, waste and water lines, plus the depth of the wall cavity if you plan a wall-hung configuration.

  • Finished width, height and projection at three points along the run — older slabs and walls are rarely square.
  • Distance from the finished wall to the centre of the waste outlet, and whether the trap is an S or P arrangement.
  • Position of isolating valves, so they stay accessible after the cabinet is installed.
  • Ceiling height and any bulkhead that affects a tall mirror cabinet above the vanity.

2. Vanity type and configuration

State clearly which configuration each bathroom receives, because the fixing method and the supporting wall detail differ. Our vanities are made to measure, so a plan that names only "vanity, 1200 mm" is not enough — it should carry the elevation, the drawer and door layout, and the basin position relative to the ends of the top.

ConfigurationWhat the plan must resolve
Integrated countertop vanityBasin cut-out position, overflow route, tap hole set-out, and how the top meets side walls and any splashback.
Floating vanityConcealed frame or bracket fixing, solid blocking in the wall to carry the loaded weight, and clear floor space for cleaning access.
Double vanityTwo waste runs, tap spacing that clears the basin divider, and who is used at each side without elbow overlap.
Single vanityBasin offset for door clearance, mirror centring, and storage layout for the household or guest use it serves.

3. Top, basin and tapware interfaces

With an integrated top the joint between basin and surface is factory-made, so the drawing has to be right before production. If you are instead combining a separate top with a basin, decide the mounting style early: an undermount basin needs a cut-out and fixing detail, while a vessel basin sits above the counter and changes tap height and spout reach.

  • Tap hole diameter and spacing, and whether the mixer is deck-mounted or wall-mounted.
  • Spout reach versus basin depth, so water lands on the bowl and not on the top.
  • Overflow provision in the basin and the matching waste type — click-clack or pop-up with a remote rod.
  • Edge detail where the top returns to a wall, and the sealant colour you expect on site.

For shared bathrooms, a double basin countertop fixes the geometry at both ends of the top; confirm basin spacing and the material you have selected for the surface before any templating happens on site.

4. Plumbing, electrical and lighting set-out

Anything hidden behind or inside the cabinet must be located on the plan, because once the unit is fixed those walls are closed. This is where a mirror with illumination or an LED mirror cabinet changes the trade sequence: the power point has to sit inside the cabinet footprint at the height the fitting requires, and it must be positioned clear of drawers and any internal shelf.

  • Hot and cold inlets and the waste, dimensioned from the finished wall and finished floor level.
  • A dedicated circuit or prepared point for illuminated mirrors and vanity lighting, with the switch location agreed — inside or outside the bathroom.
  • Any socket for a shaver outlet, toothbrush charging or an illuminated cabinet driver, placed to stay accessible for service.
  • Waterproofing zone and floor waste position, checked against the cabinet footprint so the membrane is not cut away by fixings.

5. Delivery, handling and access

A made-to-measure vanity arrives as one assembled unit in most cases, so the route from the vehicle to the bathroom matters. Check lift car dimensions, stair widths, corridor turns and door heights on the floor where it is going, and record them in the plan with the largest single piece. Where a project has several identical bathrooms, agree whether units are delivered together or staged by floor, and label each crate with its room number.

SANTERSON handles freight and door-to-door delivery for project orders, including packaging and container loading, so the receiving plan should say who signs for the shipment, where goods are stored, and how damage is photographed and reported on the day of arrival.

6. Fixing method and site preparation

  • Floor-standing units: confirm the finished floor is level across the full run, and note any upstand or tile edge that the plinth has to sit on.
  • Wall-hung units: blocking must be drawn in at the bracket heights before the lining goes up; this is the single most common omission.
  • Silicone joints to walls and splashbacks: state which surfaces are sealed and which are designed to drain.
  • Protection during the remaining works, since benchtops and integrated basins are usually installed before final painting and fit-off.

7. Snag list and handover

Close out each installation with a short written inspection: doors and drawers aligned and closing squarely, no movement in the cabinet, waste holding water without leaking under the basin, tapware seated correctly, lighting switching as intended, and sealant lines clean and continuous. Keep one signed record per bathroom. Our service covers on-site installation support, inspection and snags, spare parts and maintenance, so a documented handover makes any follow-up straightforward.

Before production, confirm the final dimensions, storage layout, finish, electrical points and sanitary connections for every vanity in the project. The items above are planning guidance; the specification signed off with our team is what governs manufacture.