A backlit feature wall looks simple on a drawing: a lit panel, a shadow gap, a clean finish. On site it is one of the few built-in elements where joinery, electrical work and wall structure all meet, so the quality of your enquiry determines how accurate the quotation is and how few surprises appear during installation. The measurements and inputs below are what we ask buyers, designers and builders to send when they specify Santerson Backlit Feature Walls for a villa, apartment or hospitality project.

Start With the Wall Itself, Not the Panel Size

Send us the overall wall envelope first: full width and full height of the wall in millimetres, taken at high, middle and low points rather than one single reading. Existing walls are rarely square or plumb, and a 10 mm difference between two corners changes how a made-to-measure panel system is detailed and packed. Then mark the fixed constraints on that wall:

  • Finished floor level, and whether the floor screed or covering is already in place or still to come;
  • Ceiling type and the distance from slab soffit to finished ceiling, including any bulkhead or cove;
  • Doors, windows, radiators, switches, sockets and thermostat positions, measured from a fixed corner;
  • Skirting, architrave or cornice that must be removed, scribed or returned into the panel line;
  • Adjacent wall materials, because plasterboard, brick and masonry take fixings and load differently.

Dimensions That Drive the Panel Layout

These listings are made-to-measure systems: layout, finish and dimensions are set per project. The numbers we need in order to draw a workable elevation are:

InputWhat to sendWhy it matters
Overall wall sizeWidth and height in mm, plus corner-to-corner diagonalsSets module widths and reveals whether the wall is out of square
Panel zoneWhere the lit area starts and ends, horizontally and verticallyDetermines panel count, joint positions and driver locations
Screen or artwork positionCentre line, screen size and mounting methodAffects reinforcement, recess depth and cable routes; see Santerson Integrated TV Panels when a screen sits inside the panel field
Niches and shelvingNiche width, height and depth; shelf spansRelated systems such as Custom Niche Paneling need the same datum lines to align
Return and wrap detailsWhether panels return onto side walls or stop with a shadow gapChanges fabrication, edge trim and site sequencing
Access needsEquipment that must stay reachable behind the wallDecides which sections are demountable or hinged

Lighting Inputs: What We Ask Before Quoting

Backlighting is an electrical installation inside a joinery assembly, so we need the lighting brief in writing rather than implied by a reference photo. Please confirm:

  • Whether the light is uniform glow across a diffuser or accent light behind discrete shapes and letters;
  • Desired colour temperature and whether dimming is required, plus the control system in use (wall switch, scene control, smart home platform);
  • The supply available at the wall: voltage, circuit rating and where the driver or transformer will be accessible for service;
  • How much of the assembly must be demountable so a driver can be reached later;
  • Any emergency, signage or safety lighting that shares the same zone.

Where lit joinery continues into cabinetry elsewhere in the project — display units, shelving, wardrobes — send those locations too, so drivers, control gear and finishes are coordinated instead of ordered twice. The same discipline applies to Santerson Illuminated Display Cabinet packages in the living areas.

Finishes and Adjacent Materials

Tell us which finishes sit on either side of the lit zone. A wall that combines veneered or lacquered panelling with stone, mirror or textured surfaces needs joint details agreed at drawing stage, not decided by the fitter on site. Our paneling and cladding ranges are specified the same way — made-to-measure sizing with material and finish options — so send the finish schedule early if you are weighing Santerson Textured Panels or Santerson Acoustic Panels against a fully lit wall. Where acoustic performance matters in a lobby, home cinema or open-plan living room, flag it at enquiry stage because panel build-up and fixing method change with it.

Drawings, Photos and Reference Images

The fastest quotations come from an information pack rather than a single dimension. A useful pack contains:

  • Existing plan and elevation of the room, with the feature wall dimensioned;
  • A sketch or marked-up photo showing the lit zone, joints and any screen position;
  • The finish schedule for the room (veneer, paint colour, stone, metal, glass);
  • Reference images that show the effect you want, with a note on what matters in them — glow, joint width, or the shadow gap;
  • Project location, storey and lift or stair access, which affects packing and delivery.

Site Conditions and Installation Sequence

Backlit walls fail on sequencing more often than on materials. Confirm who prepares the substrate, whether additional framing or reinforcement is needed for a screen or tall panel run, where containment and back boxes are installed, and which trade signs off the circuit before panels close over it. Send us the site programme so we can align production with first-fix electrical, floor finishes and ceiling work. For projects delivered under our Turnkey Villa Furnishing scope, wall systems, cabinetry, loose furniture and lighting are coordinated as one package, which removes the clash between separate trades ordering their own versions of the same wall.

Commercial and Delivery Inputs

  • Quantity: how many walls or rooms repeat the same detail;
  • Delivery address, port or site, and whether door-to-door delivery is required;
  • Packaging preference for glazed and lit components;
  • Any client-approved samples of finish you want matched.

Every Santerson wall system listing on this site is configurable, and the pages state that dimensions, materials, hardware and electrical options must be confirmed for each project. We do not publish fixed sizes, driver wattages or lighting output figures for these systems — those values are set in your drawings once we have the measurements above.

A Simple Way to Check Your Pack Is Complete

Before you send an enquiry, check that a stranger could answer these five questions from your file: How big is the wall and how square is it? Where does the lit area begin and end? What lights it, and who controls it? What finishes meet it on each side? Who prepares the substrate and closes up the wall? If all five are answered, we can return a layout drawing and an itemised quotation instead of a list of follow-up questions.

Send Your Wall Dimensions for a Layout Drawing

Share your drawings, photos and the measurements listed above and we will detail the wall, confirm the lighting specification with you and quote the full assembly. Our Interior Design Services team can also coordinate the feature wall with cabinetry, joinery and loose furniture for the same building.