A quotation for a backlit feature wall is only useful if it lets you compare one supplier against another without a phone call. Most disputes on media wall packages do not start with price. They start with a line item nobody read carefully: a "1 set" description, a light kit listed as "standard", or a finish named without a reference code. The checklist below sets out what a proper quote for Santerson Backlit Feature Walls should state, and what to ask for when it does not.

Why backlit feature walls are quoted differently from ordinary wall panelling

A backlit feature wall is two trades in one package: a substrate and finish build-up, plus a light source that has to stay serviceable once the panel is on the wall. Our configurable Media & TV Walls listings take finish, layout and dimensions as project-specific choices rather than fixed catalogue sizes, so the quotation carries more variables than an off-the-shelf item. Read it as a specification you can hold a supplier to, not as a price ticket.

Because these systems are made to order, the same wall drawn twice can be quoted very differently depending on panel split, access provision and how the lighting is wired. Comparing two quotes line by line is therefore worth more than comparing their totals.

1. Dimensions and setting-out: check what was actually measured

A credible quote states overall width and height, the direction of the panel split, and whether the measurement came from architectural drawings or a site survey. On villa and apartment work we have supplied project packages in Sydney, Melbourne, Perth, Willoughby and North Turramurra, and on that kind of job the wall is rarely a clean rectangle: skirting, cornices, door reveals and service runs all change the cut.

  • Overall finished size, plus the size of each individual panel in the split.
  • Whether the quoted figure is a manufactured size or a nominal opening, and who allows for the gap.
  • How internal and external corners are resolved, and whether returns are included or excluded.
  • Whether on-site verification of sizes is carried out before production starts, and who does it.

If a quote gives one number and the phrase "as per drawing", ask for the marked-up drawing back with panel lines and dimensions written on it. That single request removes most change orders later.

2. Finish and material schedule: names are not specifications

Our product pages list finishes as something to specify per project, so the quote should name them concretely. "Grey oak" from one factory is not the same panel as "grey oak" from another.

ItemWhat the quote should state
Surface finishFinish name plus reference or sample code, and whether it is a laminate, veneer, lacquer or paint build-up
SubstrateBoard type and thickness behind the visible face
Edge treatmentMatched edge banding, solid trim, shadow gap or mitred return
Sheen and textureMatt, satin or gloss, and the direction of any grain on adjacent panels
Sample stepWhether a physical sample is supplied before production, and what it costs

Ask for a physical sample when the wall is visible from more than one room. Photographs shift colour with lighting, and a backlit wall changes character completely once the light behind it is switched on.

3. Lighting specification: the part most quotes leave vague

Backlighting is where an attractive drawing becomes either a durable detail or a maintenance problem. The quote should separate the light source from the panel and state how each is reached afterwards.

  • Light type and mounting position: strip, module or line fitting, and which face of the assembly it sits on.
  • Colour temperature and brightness range, so the wall can be matched to the rest of the room's lighting.
  • Driver location and how it stays accessible. A driver sealed behind a fixed panel becomes a demolition job later.
  • Dimming or control method, and its compatibility with the switching already in the wall.
  • Diffusion method, so the light reads as an even wash rather than as hot spots along the edge.

Where the wall sits beside a media unit that has its own lighting, ask for both schedules on one document. Related options such as Santerson Integrated LED Media Units and Santerson Integrated Cabinet Lighting are also specified per project, and one combined lighting schedule stops two suppliers each assuming the other handled the wiring.

Ask directly: which electrical specification sheet will be issued before production, and does it name the driver model, wattage and mounting method? If a supplier cannot answer that, they have quoted the look of the lighting but not the lighting itself.

4. Scope boundaries: what is excluded matters as much as what is included

Backlit walls sit at the seam between joinery and electrical work, so exclusions need to be written down rather than assumed by both parties.

  • First-fix wiring, conduit and back boxes: usually a local electrician, but say who.
  • The isolation point and where it sits relative to the panel split.
  • Wall preparation, packing out or a backing frame, and who supplies it.
  • Finishing trades after installation: making good, paint touch-in, sealants.
  • Protection of the finished wall while other trades are still on site.

Where the wall forms part of a wider fit-out, this is also the moment to confirm whether it is quoted as a standalone item or inside a package. A turnkey interior project solution that bundles wall systems with cabinetry, lighting and flooring should still break the wall out as its own line, with its own specification.

5. Manufacturing route: catalogue item or bespoke build

If your drawing needs a dimension, reveal detail or finish that is not on the listing, the quote should say so and price it accordingly. Our custom and OEM service covers bespoke dimensions, finishes and textures, prototyping, and private labelling for developers ordering repeatedly across units. A correct quote identifies which route your wall is taking; an off-listing size quoted as though it were standard invites an unpleasant surprise at production stage.

6. Packaging, freight and delivery terms

A backlit wall arrives as oversized panels with an electrical assembly in the same shipment, so packaging detail is not a footnote. Ask whether panels are crated individually or banded together, how light components and drivers are packed separately, and what the packing list will show against each crate.

Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading, shipment tracking and delivery to site. The quote should still name the Incoterms, the delivery address, whether unloading and placement inside the building are included, and how damage on arrival is documented. Inspect every crate against the packing list on the day it lands; a damaged panel discovered in a store three weeks later has no clear owner.

7. Installation sequence and site conditions

The quote should state who installs, how long the wall takes, and what it needs from the site on that date: first-fix electrical signed off, walls flat and dry, other trades clear, and covered storage for panels on site. Where installation is included, ask whether inspection and snag items form part of handover. Our installation and after-sales support covers on-site installation, inspection and snags, spare parts and ongoing maintenance.

A practical test: read the install line and check you can name the trade responsible for each of three things, namely wiring to the isolation point, fixing the panels, and making good the perimeter. If any one of them is unnamed, it will be argued about on site.

8. Spares, after-sales and what the warranty actually covers

Light sources fail before panels do. Ask which components are held as spares for your project, how a replacement is ordered, and whether the panel finish will still be available in the same reference when you need a matching piece years later. Then read the warranty terms for what they exclude. Site damage, movement in the substrate, and electrical work carried out by others are common exclusions.

A five-minute check before you sign

1. Panel-by-panel dimensions and split lines, shown on a marked drawing.

2. Finish named with a reference, and a physical sample approved before production.

3. Lighting schedule with driver model, colour temperature, control method and access point.

4. Exclusions listed explicitly: first fix, wall preparation, making good, unloading.

5. Incoterms, delivery address and packing list detail.

6. Installer named, site conditions stated, snag list agreed at handover.

7. Spares policy and the exact scope of the warranty.

If a quotation answers all seven points, compare it with the next one on identical terms. If it answers three, send back the drawing and ask for the specification to be completed before you commit to a date.

SANTERSON has manufactured furniture and building materials since 2008 and supplies wall systems, cabinetry, lighting and finishes as one package through our one-stop furniture and building materials supply service. Send us the wall elevation and we will return a quotation written to the checklist above.