A set of flat panel hinged wardrobes looks like a simple line item on a joinery schedule: doors, carcasses, a finish code. In practice it is made-to-measure built-in work that sits inside the critical path of a bedroom or villa fit-out. Most disputes we hear about after the fact trace back to decisions taken before the order was placed, not to the manufacturing itself. The checklist below covers the risks procurement teams should close out while the drawings are still editable.

Risk 1: Dimensions Taken From Drawings Instead of the Built Condition

Wardrobe carcasses are manufactured to fixed sizes, so an opening that has moved by a few centimetres since the tender drawings becomes a site problem. Slab depths change once screed and floor finishes go down, ceiling set-downs shift with services, and skirting or architraves arrive on site after the joinery dimensions were recorded.

  • Re-measure on site after flooring, plasterboard and ceiling levels are complete, and record the date of that survey.
  • State in the order who is responsible for the final dimensional check, and what tolerance applies to the openings you hand over.
  • Confirm how out-of-square walls and uneven floors will be handled: scribing, packing, a filler panel or a site-cut allowance.
  • Note obstructions early - downlights, air-conditioning grilles, curtain boxes, switch plates, door swings and skirting heights.

Risk 2: A Finish Code That Was Never Seen in the Real Room

Flat panel doors show their surface honestly. A matte lacquer, a wood-grain melamine or a high-gloss acrylic reads differently under warm bedside lighting than on a sample card held up to daylight, and grain direction across a run of doors changes the whole elevation.

  • Order physical samples of the exact door panel and edge banding, not just a colour chip, and view them in the installed lighting condition.
  • Agree in writing which sample is the approved reference, and keep the signed sample with the purchase order.
  • Check sheen as well as colour: two finishes can match in hue and still clash in reflectance across a long wardrobe run.
  • Ask how the same finish performs on adjacent items - vanities, tall cabinets and internal doors - if they come from different suppliers.

Risk 3: Hinges, Clearances and Swing Path Left Unspecified

Hinged doors need clearance that sliding doors do not. The swing path interacts with the bed, the bathroom door, a vanity drawer and the room's circulation, and hinge specification decides whether the doors sit proud of the carcass or flush with it.

  • Confirm hinge type, quantity per door and whether soft closing is included, since these are usually priced options rather than defaults.
  • Check handle choice against the swing path: a protruding pull can foul an adjacent wall, mirror or bed frame.
  • Verify the minimum gap required between the door face and the finished floor, especially over thick tile or timber flooring.
  • For tall doors, ask what the maximum single-door height and width is for the selected panel and hinge set before the layout is fixed.

Risk 4: Internal Layout Approved Without the End User's Storage Brief

The door is only the visible part of the cost. Shelves, drawers, hanging rails and their heights are what determine whether the wardrobe works for the household or hotel guest using it, and they are the items most often changed after production has started.

  • Get the storage brief from the client or operator before layout is frozen: long-hang, double hang, drawer count, shoe and linen space, lighting inside the carcass.
  • Confirm which internal fittings are standard and which are extras, so the quotation you compare is a like-for-like one.
  • Check that shelf spans and drawer widths are within the manufacturer's stated limits for the panel thickness on offer.

Risk 5: A Quotation That Is Not Actually Comparable

Comparing wardrobe quotations fails most often because the scope differs. Panel construction, board grade, edge treatment, back panel thickness, integrated lighting and delivery terms all move the price, and cheap-looking numbers usually hide one of them.

Line itemWhat to confirm on every quotation
Panel and boardBoard grade and thickness, door construction, moisture-resistant board where the wardrobe faces a bathroom wall
Edges and surfacesEdge banding material and colour, 2 mm or standard edge, lacquer or laminate build-up, sanding and touch-in allowance
IronmongeryHinge brand and model, soft close, handles, rail and drawer systems, spare-parts availability
Internal fitShelf count and depth, drawer boxes and runners, hanging rails, carcass lighting and its transformer and control
Scope boundarySite survey, packing, freight, insurance, duties, on-site installation, snagging and who supplies plinth, filler and scribe panels
Commercial termsCurrency, Incoterms, payment stages linked to drawing approval and shipment, what happens after a change order

Risk 6: Freight, Packaging and Sequence on Site

Built-in wardrobes are heavy, brittle at the corners and useless until the room is finished. When they land before painting and flooring are done, they sit in a corridor and get damaged; when they arrive after the trades have left, the whole handover slips.

  • Agree packaging standard and container loading plan for panelised joinery, and photograph each crate on receipt against the packing list.
  • Set the delivery window against the site programme, with a named receiving contact and storage that is dry, level and secure.
  • Confirm who installs: the supplier's team, your own joiners, or a local subcontractor working from the supplier's shop drawings.
  • Record serial or room labels on every crate so panels for one wardrobe are not opened across several rooms.

Risk 7: No Clear Route for Snags and Spare Parts

A hinge that fails two years into a hotel's operation or a door panel chipped during handover is a small problem if parts are available, and an expensive one if the original finish is no longer produced.

  • Ask what after-sales support covers in writing, including response times, spare ironmongery and replacement panels in the same finish.
  • Keep the approved shop drawings, finish codes and batch references with the asset file for future maintenance.
  • Run a documented snag inspection at handover, with sign-off on door alignment, soft-close function and surface condition.

How a Single Supplier Reduces These Risks

When one supplier handles the survey, shop drawings, production and delivery, the dimensional risk sits in one place instead of being split between a millwork vendor, a door supplier and a local installer. That is how our custom bedroom wardrobe work is organised: dimensions are confirmed against the built condition, finishes are approved from physical samples, and internal layout follows the client's storage brief before anything enters production.

It also helps when the wardrobe is bought alongside the rest of the room. Wardrobes, vanities, tall cabinets, built-in furniture, wall panelling and flooring from one programme share finish codes and delivery windows, so adjacent surfaces match and site storage is planned once rather than five times. Our custom and OEM service covers bespoke finishes and layouts, and door-to-door logistics brings the joinery to site on the agreed date.

Before you raise the purchase order: re-measure after wet trades and flooring, approve a physical finish sample in the room's lighting, specify hinges and internal fittings line by line, compare quotations on identical scope, and confirm who installs and what after-sales cover applies. Close those six points and a wardrobe order stops being a risk item on the programme.

Questions Procurement Teams Ask Us

Can flat panel hinged doors be made in non-standard sizes? Yes. These wardrobes are made to measure, so width, height and layout are set from the site survey rather than a fixed module.

What finish options are available? Lacquer, acrylic, melamine, veneer and solid-wood doors in matte and high-gloss surfaces, subject to the finish range confirmed at quotation stage for the project.

When should the wardrobe be ordered on a villa or hotel programme? Shop drawings can start from design-stage dimensions, but release for production should wait until the survey after flooring and ceilings are complete, so manufacturing runs while decoration finishes.

Do you ship joinery internationally? Panelised joinery is packed for freight and delivered door to door with customs paperwork handled as part of the order; Incoterms and duties are fixed per project in the quotation.