A concealed door only works when the wall, the opening and the leaf are planned together. Order them as an afterthought and you end up with a visible shadow line, a leaf that sits proud of the finish, or an opening that cannot take the hardware you specified. The checklist below follows the same order we use on residential projects, so every decision is made before production starts rather than on site.
1. Confirm what "concealed" has to mean in this room
Before any measurement, agree the visual result with the designer or architect, because it drives everything else. A Santerson Decorative Concealed Doors specification usually aims for one of three outcomes:
- The leaf disappears into a decorated wall, so the door face carries the same wallpaper, paint, panel or veneer as the surrounding surface.
- The leaf stays flush with the wall but reads as its own designed element, which is where a decorative finish becomes part of the interior scheme instead of hiding it.
- No handle or hinge line is allowed at all, which points to the Santerson Handleless Concealed Doors option and its push-open or recessed-edge detailing.
Write the chosen outcome into the enquiry. "Flush door" means different things to a joiner, a plasterer and a hardware supplier, and that single sentence prevents most of the rework.
2. Lock down the opening build-up, not just the leaf size
Made-to-measure sizing only helps if the surrounding construction is fixed at the same time. Collect these items before we quote:
| Finished wall line | Which face of the wall the door must sit flush with, and the total thickness of that build-up including plasterboard, backing and any insulation or acoustic infill. |
| Clear opening dimensions | Width and height of the structural opening, plus the floor finish level on both sides so the threshold and bottom clearance are correct after the final floor covering is laid. |
| Wall substrate | Stud, masonry or a panelled system. Concealed frames need solid fixing points, and a decorative wall build-up has to be tied into the frame line rather than butted against it. |
| Swing and clearance | Opening direction, stop hand, and the furniture or traffic route the leaf will pass through when open. |
Where the door sits inside a larger decorative scheme, coordinate it with the Wall Panel Systems and panelling drawings so the reveal, shadow gap and panel module run continuously across the door face.
3. Match the finish to the wall, sample by sample
Finish selection is where a concealed door either succeeds or becomes the most obvious element in the room. Specify the actual surface treatment for the leaf — paint colour and sheen, wallpaper, laminate, lacquer or a Wood Veneer Panels match — and confirm it against a physical sample under the room's own lighting. Matt and gloss surfaces reflect light differently, and a leaf that matches on the drawing sheet can still read as a rectangle once installed.
Also decide how edges and corners are handled: a continuous decorative surface, an intentional shadow gap, or a deliberate reveal edge. Each needs a different frame detail, so it must be settled at the drawing stage.
4. Specify hardware as part of the door, not as an accessory
- Hinge type and load rating for the finished leaf weight, including the weight of any decorative facing added on site.
- Lock, latch and strike requirements, and whether access control or a privacy set is needed for bathrooms and bedrooms.
- Opening method: handleless push mechanism, recessed pull, or a deliberately minimal handle that becomes a design feature.
- Door closer or soft-close needs on high-traffic villa and hospitality doors.
Hardware choices change the frame groove, leaf thickness and fixing positions, so they cannot be revised after production has started without a new panel.
5. Sequence the order against the site programme
Concealed doors are an early-trade item. The frame and lining go in while walls are still open, and the decorative facing follows the wall finish. Put the door order into the same schedule as the wall build-up, flooring and ironmongery, with one party responsible for confirming dimensions on site before release. Our team can work from your drawings and then confirm the measured openings, so the specification is checked twice rather than once.
6. Close out the commercial details
- Door schedule: one line per opening, with size, swing, finish and hardware referenced to a drawing number.
- Packaging and protection for transit, since decorative faces are the part most easily damaged on site.
- Delivery terms and destination, coordinated with our door-to-door logistics so frames arrive before the wall trade needs them.
- Site acceptance: what is inspected at handover — flushness, operation, finish condition — and who signs it off.
The short version
A complete checklist covers the visual outcome, the wall build-up, measured openings, the decorative finish sample, the hardware set, the site sequence and the commercial terms. When those seven items are agreed in writing, a concealed door becomes a quiet part of the wall; when they are left open, it becomes a variation.