A door schedule that looks complete on paper can still cause trouble on site. The reason is rarely the leaf itself; it is the gap between what the designer drew, what the buyer priced and what the installer was told to fix to the opening. Standard interior hinged doors are the clearest example: they are ordinary, high-volume items on almost every residential fit-out, and that is exactly why small specification gaps multiply across dozens of openings. Below is what we ask design teams and procurement teams to settle before a door package is released for production.
Why hinged doors cause more coordination trouble than they should
A hinged door is judged on three things at handover: how it sits in the opening, how it swings against the room around it, and whether its finish reads consistently next to the joinery and wall finishes. None of those three can be decided by the door supplier alone. The swing direction depends on furniture layout, the reveal depends on the wall build-up, and the finish only reads correctly when the same tone appears in wardrobes, cabinetry and architraves made by someone else.
In a villa or apartment package, doors are also one of the last items specified and one of the first items installed. That ordering is uncomfortable: late decisions meet early site sequences. When the door schedule is confirmed after flooring, skirting and wall finishes have been ordered, the opening heights and floor levels are already fixed by other trades, and any correction becomes a site variation rather than a shop-drawing note.
The five items designers and buyers should sign off together
1. Opening sizes versus the finished floor level
Designers usually dimension an opening from structural slab. A door manufacturer needs the clear opening after screed, adhesive, flooring, threshold and tile beds are accounted for. If those two numbers differ by even a few millimetres across a floor, a batch of doors arrives that either needs trimming or leaves an oversized gap.
- Confirm whether each listed size is the structural opening, the frame outer size or the clear leaf opening.
- State the finished floor level for every room type, including wet areas and thresholds between rooms.
- Ask for undercut and threshold details at the same time as the height, so acoustics, ventilation gaps and floor transitions are decided once.
2. Wall build-up and the depth of the lining
Partition type drives frame depth. A masonry leaf, a stud wall with two layers of board, and a wall that also carries cladding or panelling all need different lining widths. Buyers often order doors before the wall specification is frozen, then find the frames are shallow for the finished wall.
Where the design uses wall panel systems or decorative cladding near an opening, decide early whether the door lining stops at the substrate or wraps into the panel line. That single decision changes both the frame detail and how the architrave is fixed.
3. Hardware set, not hardware category
"Levers and hinges to match" is not a specification. For each door type, confirm leaf thickness and hinge weight, lock case format, latch handing, strike plate finish, and whether closers, privacy sets or accessible furniture apply. Where a project mixes collections, for example classic panel hinged doors in bedrooms and flush hinged doors in corridors, the hardware set should be decided per type rather than once for the whole job.
4. Finish continuity with joinery
Doors rarely stand alone visually. They sit beside wardrobes, media walls and kitchen fronts, and a mismatch in veneer figure or lacquer sheen is obvious the day the protective film comes off. Where the interior uses wood tones, matching door faces to wood veneer hinged doors and to the cabinetry fronts from the same source removes a whole category of colour-matching arguments.
Ask for physical samples of the exact face material, not a catalogue scan, and keep signed samples on site. A door supplier working with made-to-measure sizing and selectable materials and finishes can match to approved samples; they cannot match to an adjective in a schedule.
5. Handing, swing and clearances against the layout
Handing errors are the most common door snag and almost never the manufacturer's invention. They come from furniture layouts moving after the schedule was issued. Reconcile the door schedule with final furniture positions, wardrobe doors that need clearance to open, and any pocket doors or sliding doors in the same wall, because those need pocket and track provisions built into the partition.
A practical split of responsibilities
| Item to align on | Design team confirms | Buyer or contractor confirms |
|---|---|---|
| Sizes and levels | Opening dimensions per room type, finished floor levels, undercut strategy | Site-verified openings, tolerance limits, who re-measures before release |
| Wall interface | Partition build-up, lining depth, architrave or square-edge detail | Fixing method, wall-maker coordination, sequence of wet trades |
| Hardware | Set per door type, fire and accessibility requirements, handing logic | Quantities per set, spares, who supplies locks versus hinges |
| Finish | Approved face material, sheen and sample reference | Sample sign-off record, protection on site after installation |
| Programme | Date the schedule is frozen, layout changes that reopen it | Production release date, delivery window versus site access |
Where made-to-measure production helps
Our standard interior hinged doors are produced as made-to-measure items: sizing, material and finish are set per project, and the layout follows the door schedule rather than a fixed catalogue size. That flexibility only pays off when the information arriving with the order is complete, which is why we ask for a door schedule that carries opening sizes at finished floor level, wall build-up notes, hardware sets by type and approved finish samples.
It also helps to buy doors alongside the joinery they sit next to. A single source producing doors, hinged door wardrobes and cabinetry works from one set of finish references and one set of dimensions, so the reveal, the architrave and the adjacent wardrobe face are drawn against the same information. Our interior design services cover exactly this coordination stage: drawings, production coordination and on-site guidance for projects where several interior elements must agree.
Questions worth answering in the design stage, not on site
- Do any openings need concealed or flush wall aligned doors, where the lining and wall finish detail must be resolved before the partition is built?
- Are full-height or decorative openings part of a panelled wall, so the door and the panelling are drawn as one assembly?
- Which rooms need acoustic, privacy or accessibility hardware, and does that change leaf thickness or undercut?
- Who verifies openings on site after the floor screed is poured, and what tolerance is acceptable?
- What is the last date the schedule can change without reopening production?
Answering these in the design stage costs a coordination meeting. Answering them on site costs variations across every opening of that type.
Door schedule checklist to attach to your enquiry
- Room-by-room door list with sizes at finished floor level and stated tolerance
- Wall build-up per partition type, including lining depth and architrave detail
- Hardware set per door type, with handing marked against the final layout
- Signed finish samples: face material, sheen and edge treatment reference
- Delivery sequence by floor or zone, matched to site access
Send us your door schedule
Share the room list, wall build-ups and finish references for your project and we will confirm dimensions and specifications before production. Enquiries receive a response within 24 hours during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).