A quotation for hanging modular wardrobes usually arrives as a PDF, a set of elevations and a price per running metre. Two proposals that look almost identical on the cover page can carry very different scope underneath it. The buyer who reads past the total figure — and asks what each line actually commits the factory to — is the one who avoids change orders after the containers have shipped.
The notes below follow the order we recommend for reviewing a proposal from any China-based cabinetry supplier, using our own furniture and building materials manufacturer workflow as the worked example. Nothing here is a promise of performance: what a proposal commits to is exactly what its drawings, specification sheets and signed confirmations say.
1. Start with the wall condition the hanging system assumes
A suspended wardrobe carries its load through a wall-mounted rail rather than through a base carcass sitting on the floor. That single difference changes what the supplier needs from you before they can price anything honestly, so check that the proposal states it.
- Wall build-up. The proposal should record the wall type and finish make-up for each room — masonry, stud partition with lining, or an existing finished surface — because fixing detail and tolerance follow from it. If the drawings show a wardrobe against a wall whose construction nobody has confirmed, treat the price as provisional.
- Floor and ceiling levels. Hanging units are set out from a level line, not from the floor. A serious proposal notes that site levels must be verified on site and states who does that verification: the supplier's surveyor, your builder, or you.
- Clearances. Skirting, architrave, cornices, recessed sockets, light switches, air-conditioning outlets and door reveals all interfere with a flush carcass face. Look for a dimensioned section showing the carcass depth including doors and handles, not just the box.
- Access route. Long side panels and full-height doors must travel from the lift or stairwell to the room. Proposals that ignore this produce on-site cutting that voids the finish warranty you were quoted.
2. Read the internal layout as a specification, not a picture
Modular wardrobe collections are configurable precisely because the interior is decided project by project. Our Modular Wardrobes range, for instance, covers open modular wardrobes, drawer focused modular wardrobes and combination modular wardrobes, and each is supplied with made-to-measure sizing, material and finish options and a layout tailored to the project. That flexibility is also where vague proposals hide.
For every bay in the elevation drawing, the proposal should name:
- the number and width of hanging rails, and whether a second rail at height is included or optional;
- shelf counts, shelf depths and whether adjustable shelving is priced as standard;
- drawer stacks by type — the material of the drawer side, runner type and whether soft close is included or an upgrade line;
- any dedicated zones such as trouser slides, jewellery trays, shoe shelving, laundry hamper housings or a mirror-backed panel;
- lighting: whether cabinet lighting is pre-wired, where the transformer sits, and who supplies the electrical feed.
If a bay is drawn but not itemised in the bill of quantities, it is not priced. Ask for a one-to-one match between drawing numbers and line items before you compare prices between suppliers — comparing totals against different bays is meaningless.
3. Check what the finish schedule actually commits to
"Melamine" or "lacquer" is not a specification. For wardrobe projects on this site, door and carcass finishes span melamine, acrylic, lacquer, wood veneer and glass in aluminium frames, and each behaves differently in use. A proposal worth signing states the finish by system, not by adjective.
| Element | What a clear proposal states | Follow-up question to send back |
|---|---|---|
| Door face | Substrate, surface material and finish process, plus edge treatment on all four edges | Which edges are covered by the stated finish, and how are cut-to-size adjustments finished on site? |
| Carcass and interior | Board type, thickness, edge banding colour and whether the interior matches the exterior | Is the interior finish the same material as the exterior, or a lower-cost board with a decorative face? |
| Glass and mirrored panels | Glass type, tint, thickness, safety treatment and frame profile | Is the glazing supplied to a safety specification for bedroom use, and who certifies it? |
| Hardware | Brand or model reference for hinges, runners, hanging rail and handles, with load rating | Are these the exact items quoted, and what is the substitute if a component is out of production? |
| Colour and grain | A named reference plus an approved physical sample per project | Which sample number governs production, and is it signed and dated by both parties? |
The sample point matters more than it appears. Photographs on a screen shift with white balance, and wood veneer varies between cuts of the same log. A proposal that names an approved physical sample gives you something to hold the delivered goods against; a proposal that says "as per image" gives you nothing.
4. Test the made-to-measure claim
Nearly every wardrobe supplier writes "custom sizes". Ask how far that customisation actually goes, because a hanging modular system is only as flexible as its fixing detail and its panel cut sizes.
- Dimensional range. Can the carcass height go to the ceiling line in each room, or does the proposal insert a filler panel at a standard height? Fillers are not a fault, but an unpriced one is a change order.
- Corners and reveals. Ask how the system resolves an inside corner, a return into a doorway, and a wall that is out of plumb. The answer reveals whether the supplier designs for the site or sells fixed modules.
- Door interface. Hinged, sliding and open configurations need different clearances and different track loads. Confirm the door type per bay matches what the hanging rail and carcass are rated for.
- Integration with adjacent work. A wardrobe that meets a window reveal, an custom minimalist bedroom wardrobe run in another room, or a wall panel system needs a joint detail drawn at 1:5. If no such detail exists, request it before production.
5. Verify the process the proposal sits inside
A wardrobe price is only reliable if the workflow behind it is defined. Our project services run through consultation, design and planning, production, logistics, installation and after-sales, with custom and OEM work handled through design and prototyping before bulk production; our interior design service follows brief and proposal, then quotation and detail confirmation, then production and shipment. Whichever supplier you use, check that the same six checkpoints exist in writing:
- Survey or measured drawings. Who measures, when, and what happens if site dimensions differ from the drawings issued for tender.
- Approval drawings. Signed elevations and sections that become the production reference, with a revision number on every sheet.
- Sample sign-off. Finish samples approved before panel cutting begins.
- Production hold points. A stage at which you can still change an interior layout without cost; after that, changes carry a fee. Ask where the line falls.
- Packing and packing list. Crate marks that match drawing numbers, so installation crews know which panel belongs to which bay.
- Snag process. How replacement panels for transit damage are handled, who pays freight on them, and how long the delay is likely to be.
Suppliers offering a one-stop scope can also supply the adjoining finishes — wall panelling, doors, vanities, flooring and lighting from the same order book — which reduces interface disputes between trades. That convenience only holds if each trade's scope is still drawn separately. Bundling products into one invoice is not the same as accepting single-point responsibility for the junctions.
6. Price transparency: what to demand line by line
Compare proposals on unit rates and inclusions, never on the headline total. A workable comparison sheet lists, per bay or per running metre: carcass and panels, doors, hardware, internal fittings, lighting, packing, freight to port of destination, insurance, duties and taxes, inland delivery to site, installation labour, and any site preparation the supplier expects your builder to carry out.
Then check three exclusions that most often surface later:
- site preparation such as packing out walls, relocating sockets, or supplying power to wardrobe lighting;
- making-good finishes around the unit after installation;
- second-visit labour where site conditions differ from the drawings.
Where a supplier states response times, warranty length or installer certification in marketing copy, ask for the same terms written into the contract with their exclusions. Published figures on a website are not contractual commitments until they appear in your agreement.
7. Red flags worth walking away from
- A quotation issued from room dimensions alone, with no measured survey and no note that site verification is required.
- Elevations without sections, so carcass depth, door projection and rail positions cannot be checked.
- One price covering "wardrobes to bedrooms" with no per-bay breakdown.
- Finish described by adjective only, with no approved sample reference.
- No revision control on drawings, or approval requested by message rather than signed sheet.
- Hardware listed as "standard fittings" with no model reference or load rating for the hanging system.
8. A short checklist to send back to the manufacturer
Copy this into an email and ask for a yes-or-no answer against each line. The quality of the reply tells you more about the supplier than the price does.
- Confirm wall type, fixing method and load rating of the hanging rail for each room.
- Issue dimensioned elevations and sections with revision numbers, including door projection.
- List every internal fitting per bay, and state which are standard and which are optional.
- Name substrate, surface material, edge treatment and an approved sample reference for every finish.
- State hardware brand or model, load rating, and the substitute policy.
- Identify all information still outstanding from site, and who supplies it.
- Define the last point at which an interior layout change is free of charge.
- Show packing marks keyed to drawing numbers, plus freight, insurance and delivery terms.
- Set out installation scope, snag handling and replacement-panel terms in writing.
Send us the drawings you already have. SANTERSON manufactures made-to-measure modular wardrobes alongside cabinetry, doors, wall panels, vanities, lighting and flooring for villa, hotel and office projects, with custom and OEM service and door-to-door delivery from our China factory.
Contact PHILLIP by email at santerson@qq.com or by phone/WhatsApp on +86-13928214007, and we will mark up your current proposal against the checklist above before you commit to it.