A submittal is the package a client, consultant or main contractor reviews before they approve a product for manufacture. For Wooden Sliding Panels, the quality of that package usually decides how smoothly the rest of the job runs: approval turnaround, the accuracy of the opening sizes we cut to, and whether the tracks and hardware arrive matching what is on the drawing. Below is the checklist we work to when a sliding panel system goes through review on a villa or residential fit-out.
Because these panels are made to measure rather than stocked to a fixed size, an incomplete submittal does not just delay paperwork. It delays the start of production, and every week lost there is a week taken out of the delivery window at the far end.
1. Scope, schedule reference and who signs what
Start with the boring part that everyone skips. State the project name, the building or unit reference, the drawing revision you worked from, and which rooms or elevations the panels belong to. Sliding panels appear in more than one place on most job schedules, so naming only "sliding panels" invites confusion between the wardrobe run in bedroom two and the screen in the living area.
- Schedule line item or position number that the panel is being submitted against
- Elevation or room reference for every panel group, including any that stop short of a ceiling
- Revision number and date of the architectural drawing your dimensions are taken from
- The reviewer expected to sign: interior designer, architect, main contractor or client representative
If more than one party has to approve, say so on the cover sheet. A package that needs a designer's finish approval and a contractor's dimensional approval at the same time gets answered faster than one where those steps are left implicit.
2. Dimensioned drawings, not just a product photo
A catalogue image tells a reviewer what the panel looks like; it does not tell them whether it fits. The core of the submittal is a set of dimensioned elevations for each panel group, showing overall width and height in the finished opening, the number of panels, the overlap between panels, and where the leading edge finishes against a wall, return or corner.
- Finished opening width and height, plus the floor-to-ceiling height where panels run full height
- Panel count, individual panel widths and the stacking side
- Track position: ceiling-mounted, top-hung or floor-guided, with the set-down from the wall face
- Clearances for skirting, architraves, door handles, light switches and any projection into the travel path
- Out-of-plumb and out-of-square allowances where the walls are not true, which is common in refurbished villas
Our Closet Sliding Panels and Textured Sliding Panels are drawn to the same standard, so if you are submitting panels for several openings in one project, ask for a consistent drawing set across them. Mixed levels of detail across one package is one of the most common reasons a consultant returns the whole thing rather than approving part of it.
3. Substrate, finish and edge details in writing
"Wooden" is not a specification. A reviewer needs to know what the panel core actually is, what the visible face is, and how the edges are treated. Vague wording here is where disputes start later, because two people can read the same sentence and picture different products.
- Panel core and construction type, with the board thickness
- Face material: veneer, laminate, lacquer or paint, with the supplier's reference or sample number
- Grain direction and matching rules across a run of panels, particularly for veneer
- Edge treatment: matched edge banding, solid timber lipping or a shadow gap
- Sheen level, and whether hardware is colour-matched to the frame
Attach physical samples where the reviewer requires them, and record on the transmittal which sample was signed off and by whom. A finish approved against one sample board is far easier to defend at handover than a finish described in an email.
4. Track, hardware and operating mechanism
The moving parts are what wear out, so they get scrutinised. Specify the hanger or roller type, the load rating per panel, the track profile and material, the bottom guide or floor track, and the stoppers. Where panels are wide or heavy, say what the maximum single-panel weight is and how that was determined for the selected hardware.
- Hanger and roller specification with rated load per hanger
- Track profile, material and fixing method to the structure above
- Panel weight range the selected hardware is intended for
- Handles, recessed pulls or push-open detail, and whether a soft-close or damper is included
- Locking requirement where the panels enclose storage in a shared or rental property
If the wall system also has to conceal something behind it, submit that as part of the same package. Our Sliding Panel TV Systems are specified this way: the panel is only one component, and the opening behind it needs its own ventilation, cable routing and access arrangement agreed before manufacture.
5. Interface with structure, services and finishes
Sliding panels rarely fail on their own; they fail at the junction. A ceiling track fixed to plasterboard that was never designed to take a dynamic load is a site problem waiting to happen. Include the fixing detail and confirm who is responsible for what.
| Interface | What the submittal should state |
|---|---|
| Structure above | Substrate the track fixes to, blocking or backing steel if required, and fixing type |
| Floor finish | Final floor build-up and level, so a floor guide is set at the right height after the finish is laid |
| Lighting and services | Any recessed downlight, sprinkler head or cable run inside the travel path of the panel |
| Adjoining finishes | Who supplies and installs the architrave, skirting and any shadow-gap trim |
Where a project also uses other wall finishes on the same elevation, list them so the junction is designed rather than improvised. Panel-to-panel and panel-to-Wall Panel Systems junctions look deliberate when they are drawn; they look accidental when they are not.
6. Quantities, packaging and delivery sequence
Give quantities per opening rather than one total for the job, and state how the panels are packed and labelled. Panel sets destined for different bathrooms arriving in one unlabelled crate is an avoidable problem on multi-unit work.
- Quantity per opening, with each panel group identified by room reference
- Packaging method and labelling convention matched to the site's delivery log
- Delivery stage: early enough for first fix and set-out, but after floor levels are confirmed
- Storage requirement on site, since timber-based panels should not sit in an unconditioned area
For projects ordering across several categories at once, sequence the panel delivery against the wet trades. Panels going in before the paint and flooring are finished tend to get damaged.
7. Installation method, tolerances and aftercare
Close the submittal with how the panels will actually be fitted and handed over. Consultants approve methods, not just products.
- Installation sequence and who performs it: supplier's team or the contractor's fitters
- Adjustment range on the hangers, so small level differences can be taken up after fitting
- Snag and inspection process before handover
- Cleaning and maintenance recommendation for the selected finish
- Spare parts supply for rollers and track components after handover
Our installation and after-sales service covers on-site fitting, inspection with the contractor and spare parts supply, so the people who made the panels can be the ones to resolve an alignment problem instead of directing a fix over the phone.
Common reasons a panel submittal comes back
- Dimensions taken from an early drawing revision that no longer reflects the built opening
- Finish described in words with no sample reference attached
- No fixing detail for the track, leaving the structural responsibility unclear
- Panels specified without accounting for the final floor level
- Several openings grouped under one vague line item, so the reviewer cannot check them individually
Every one of these is avoidable with a complete first submission. If you are preparing a package now and want drawings, hardware data and finish samples assembled to match it, send us the schedule extract and the drawing revision and we will put the submittal together against your format.
Questions buyers ask before submitting
Can you submit to our own template? Yes. Send the form and we will fill it in, which avoids a second round of translation into your consultant's preferred format.
What if the openings are not square? Send the measured high, low, left and right dimensions rather than one average. We cut to the measured condition and build adjustment into the hangers.
Can the same finish be carried through other joinery? Where a project uses matching wardrobes, media walls or panelling, we can specify the same face material and finish across those items so the elevations read as one design.
SANTERSON manufactures made-to-measure furniture and building materials for residential, villa and hospitality projects. For a quotation, a submittal pack prepared to your own template, or finish samples, contact PHILLIP on +86-13928214007 (phone and WhatsApp) or email santerson@qq.com.