An eight-metre swim spa is not an item you can order from a model number alone. Outdoor Swim Spa WS-PC08U sits at the long end of our configurable hydrotherapy range, and the price you are quoted depends on decisions only you can make: where it will sit, what it will be built on, how it will be powered, and which extras belong in your scope. Sending those details with your first enquiry is what turns a rough estimate into a firm quotation. Here is exactly what we need from you.
Start From the Base Specification
WS-PC08U is listed in our catalogue with a fixed set of baseline equipment. Confirming that this baseline matches your expectations avoids re-quoting later.
| Item | Catalogue listing for WS-PC08U |
|---|---|
| Overall dimensions | 8000 x 3000 x 1500 mm |
| Control system | 1 set |
| Water pumps | 4 pcs |
| Filter pump | 1 pc |
| Total jet count | 33 pcs |
| LED lighting | 1 |
| Total power | 11.85 kW |
| Features shown | Water jets, LED lighting, ozone sanitisation |
| Swim training system | Not listed in the specification shown for this model |
Treat these figures as the catalogue starting point. Equipment fitted to the unit you receive follows the configuration we agree with you, and electrical requirements are confirmed against that final build.
Tell Us Where the Spa Will Sit
Installation setting drives more of the specification than most buyers expect. Tell us whether the unit goes on a ground-level terrace, a raised timber deck, a sunken pit, a rooftop, or an indoor plant room, and send drawings or photographs if you have them.
- Access and delivery route. A shell this size has to reach the site. Gate widths, stair cores, cranes and tight turns all affect how we pack and ship it.
- Structural support. An 8000 x 3000 mm basin carries a large water load once full. Deck bearers, slab thickness and drainage around the perimeter need confirming before installation.
- Wind, sun and frost exposure. Where the spa is exposed to cold or strong wind, insulation and cover choices change, and so does the quote.
Confirm Your Power Supply Before We Size Anything
The catalogue lists total power of 11.85 kW for this configuration. That figure covers the pumps, jets and control system as specified; a heat pump added to the package increases connected load substantially. Please send us:
- Supply voltage, phase and frequency available at the installation point (single-phase or three-phase).
- Distance from the main switchboard or distribution board to the spa location.
- Whether a dedicated circuit, isolator and residual-current protection have already been provided by your electrician.
- Any local requirement for an electrical certificate or inspection sign-off that we should allow for in the documentation.
We will match the equipment and wiring arrangement to what you confirm, and state clearly in the quotation which side of the boundary each party is responsible for.
Choose Your Options and Accessories
Catalogue-listed options for this range include control system upgrades, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each item against the WS-PC08U build rather than assuming a package carries over.
Two questions settle most of this quickly:
- Year-round use or warm-season use? All-season use points you to a heat pump, insulation and a cover, which is a different running profile from a spa used only in summer.
- Who maintains it? Owner-maintained villas and managed resort or clubhouse installations need different filtration and sanitisation choices, because service access and duty cycles differ.
If your project needs a footprint that does not suit an 8000 mm rectangular shell, our Customizable Shape Outdoor Spa line covers square, round, oval and curved designs in an acrylic shell with structural reinforcement, which is often the better route for irregular terraces and courtyard layouts.
Give Us the Quantity and the Programme
A single villa unit and a multi-unit resort or residential development are quoted differently. Please state:
- How many units, and whether identical specifications or varied by location.
- The required site arrival date and any phased handover.
- Whether the swim spa is part of a wider package. Many of our clients combine pool plant with Outdoor Furniture for Villas and Resorts, sun loungers, pergolas and bathroom fixtures so that one supplier coordinates the whole outdoor and wellness area.
Settle Shipping Terms and Import Responsibility
We arrange freight forwarding by sea, air and rail, with packaging and container loading, customs paperwork and shipment tracking. To quote the right landed arrangement we need:
- Destination port or delivery address, and whether you want door-to-door delivery or delivery to port.
- Your preferred Incoterms, and who is acting as importer of record.
- Whether cargo insurance should be included in our quotation or handled on your side.
Import duties, local permit requirements and site-specific installation standards are confirmed project by project. We do not assume them on your behalf.
What You Receive Back From Us
As a China-based manufacturer of furniture and building materials working on villa, hospitality and office projects since 2008, we handle the swim spa as one element of a larger fit-out rather than an isolated purchase. Our Swimming Pools and Swim Spas range covers several shell lengths and configurations, so mixed specifications across one project can be placed with the same team that supplies your decking furniture and interior fixtures. Our Turnkey Interior Project Solutions cover design consultation and space planning, material and product specification, manufacturing with quality control, project management and site coordination, then installation and handover.
For your enquiry that means a configuration sheet listing every pump, jet, light and control item against the agreed build; a quotation stating what is included and what is excluded; packing and container-loading information matched to your site access; and follow-up on installation and after-sales support. If you are specifying several product groups for one project, we coordinate them under a single programme so that pool, deck furniture and interior fixtures arrive on a schedule your builder can work to.
Send the model reference, site photos or drawings, power supply details and your target arrival date, and we will come back with a specification sheet and a firm price for Outdoor Swim Spa WS-PC08U. Enquiries go through our contact page.