A swim spa quotation is easy to compare on price and hard to compare on substance. Two proposals can carry the same model code, a similar shell size and almost identical jet counts, yet differ by thousands of dollars because one includes the heat pump, the insulation package and the electrical allowance while the other does not. This guide walks through the line items that decide whether a proposal for Outdoor Swim Spa WS-115FⅬ is complete, comparable and ready to build on.

Start With the Shell, Not the Jet Count

Jet count is the number buyers read first and the one least likely to explain a price gap. Before comparing equipment lists, confirm that both proposals describe the same shell, because length drives transport, siting and civil work more than any other single figure.

The catalogue record for WS-115FⅬ gives overall dimensions of 5000 × 2200 × 1250 mm. Compare that with the shorter variant on the same range, Outdoor Swim Spa WS-115AⅬ, listed at 3880 × 2200 × 1250 mm. Both share the same width and depth, so a proposal that quotes only "the 115 series" hides more than a metre of length and a materially different footprint on a terrace, in a courtyard or beside a villa pool.

Ask the supplier to state length, width and height for the exact model code they are quoting, and to confirm whether those figures include steps, handrails and any external cabinet cladding. A dimension that excludes the steps will not match the space your architect has reserved.

Read the Specification Table as a Bill of Quantities

The published specification block for WS-115FⅬ lists the items below. Treat it as a starting point to be confirmed line by line, not as a delivery schedule.

Specification shown in catalogueWhat to verify in the proposal
Model: WS-115FⅬThe exact model code, including suffixes. Suffix variants in this range differ in equipment and finish.
Catalogue dimensions: 5000 × 2200 × 1250 mmWhether the figures include steps, handrails and cladding, plus clearance for access and maintenance.
Control system: 1 setWhich controller, where it is mounted, and whether a spare or replacement module can be supplied later.
Swim training system: 1 setThe type of swim unit and how its output is described; this is the component that defines lap use.
Water pump: 1 pc / Filter pump: 1 pcPump duty and run-time settings, and whether filtration cycles are covered by the quoted power figure.
Jet total: 24 pcsHow jets are grouped between swim, hydrotherapy and seating zones; identical totals can be distributed very differently.
LED lights: 4 pcsFixture locations, and whether drivers and low-voltage wiring are included or site-supplied.
Total power: 8.05 kWWhether the figure covers only the quoted configuration, and what is added if a heat pump or extra insulation is selected.
Features shown: water jets, LED lighting, ozone, swim training systemOzone output and dosing arrangement, plus the replacement parts you will need to keep on hand.

The power figure deserves particular attention. A total power rating published for a catalogue configuration is not the same as the connected load of your finished unit. If your proposal adds a heat pump, sand filtration or upgraded insulation, ask for a revised electrical schedule rather than assuming the original 8.05 kW still applies.

Separate Standard Equipment from Options

The catalogue lists options for this range that include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option named in a brochure is not automatically available on the model code you are buying.

A practical way to test a quotation is to ask for two versions of the same proposal: one showing what ships as standard on WS-115FⅬ, and one adding every option you have been told about verbally. When both versions arrive, gaps in scope usually become obvious without any negotiation at all.

Questions to send back with your markup

  • Which items on this quotation are standard on WS-115FⅬ, and which are optional extras?
  • If a heat pump is added, what is the revised total connected load and the recommended circuit size?
  • What insulation package is quoted for the shell, base and cabinet, and does it change the external dimensions?
  • Which water treatment is included: ozone only, or ozone plus UV sterilisation?
  • Are steps, handrails and cover included in the price, and are they shipped loose or pre-assembled?
  • Who supplies the electrical connection, the base slab or plinth, and the final site plumbing?

Check Site Conditions Before You Compare Prices

A swim spa is one of the few products where the buyer's own trades affect the delivered cost so directly. A lower quotation can look attractive only because it excludes work you will end up paying for twice.

  • Access and route. Confirm the delivery path from the kerb to the final position, including gate widths, overhead lines and turning space. Length matters here: a 5000 mm shell follows a different route from a 3880 mm one.
  • Support structure. Ask what base or plinth the manufacturer requires, with dimensions and level tolerance, before your contractor pours anything.
  • Power supply. Give the supplier the supply available at the site and ask them to confirm the circuit, protection and cable run for the configuration you intend to order.
  • Drainage and servicing. Confirm clearance around pump, filter and controller, since maintenance space is rarely shown on a marketing image.

Judge the Supplier's Process, Not Just Their Product

Swim spas usually arrive inside a wider package of outdoor and interior products, which makes coordination as important as the unit itself. When SANTERSON quotes a spa for a villa or hospitality project, the same team covers the surrounding scope: custom and OEM service for bespoke finishes and sizing, logistics and door-to-door delivery covering freight arrangements and shipping documentation, and installation and after-sales support for handover and ongoing parts. Ask which of these stages are named in your contract and which remain your responsibility.

For a buyer sourcing the spa alongside other fit-out items, the swimming pool category is where the full configurable range sits, including longer layouts and customised shapes: Swimming pool. Comparing two or three model codes in one enquiry makes it clear which supplier is specifying to your site and which is simply sending a price list.

A Simple Scoring Method Before You Sign

Score each proposal from zero to two on six items: exact model code with suffix; full external dimensions including steps; complete equipment list separated into standard and optional; a revised power figure for the quoted configuration; stated base, access and electrical requirements; and named scope for delivery, installation support and spare parts. A proposal scoring ten or above is usually specific enough to compare directly against another. Anything lower needs one more round of written questions before it can be priced against a competitor.

That single step removes most disputes later, because it forces both suppliers to describe the same product on the same terms.

Product dimensions, equipment counts and power figures quoted here are transcribed from the published catalogue entry for the model discussed. Confirm included equipment, options and electrical requirements for your selected configuration before ordering.