A shaker style PVC cabinet order for an overseas villa or apartment project rarely arrives on site by accident. The cabinets leave the factory as made-to-measure components, and everything after that — packing, container loading, documents, port clearance and final setting out — decides whether the joinery fits the openings it was measured for. This guide walks through how a project order of Santerson Shaker Style PVC Cabinets moves from confirmed drawings to installation, and what the buyer needs to lock down at each stage.
Start With the Product Definition, Not the Freight Quote
The product page describes this line as a shaker style cabinet design with project-specific dimensions and finish options: made-to-measure sizing, selectable material and finish, and a layout tailored to the project. That wording matters for logistics planning, because there is no standard carton size to plan around. The cube of the shipment depends entirely on your drawings.
Before anyone talks about containers, confirm the following in writing with the factory:
- Final shop drawings for every unit, with overall height, width and depth marked per module, plus clearances for appliances and pipework.
- The selected substrate and door construction for the shaker profile. The catalogue lists this design under both PVC and plywood naming, so the material called out on your quotation should match what you intend to receive.
- Finish selection and any sheen or colour references, particularly where a project mixes shaker doors with other cabinet lines in the same kitchen.
- Which parts ship assembled and which ship flat packed, and how doors, panels and hardware are separated.
These decisions drive the packing list, and the packing list drives the freight cost. A quotation built on an estimated cube rather than a confirmed one will move once the drawings are released.
Choose the Incoterm You Can Actually Manage
SANTERSON describes global freight forwarding by sea, air and rail, together with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. That gives project buyers two practical routes, and the choice depends on who you want to control the ocean leg.
| Route | Who manages what | Best suited to |
|---|---|---|
| Door-to-door service from the supplier | Supplier arranges origin handling, ocean freight, destination clearance coordination and delivery to site; buyer handles local conditions and site access. | Builders and interior firms ordering their first project load, or orders spread across several product categories in one consignment. |
| Freight collected by your own forwarder | Supplier packs, loads and delivers to origin port with documents; your agent books the vessel, handles clearance and on-carries inland. | Buyers with a trusted local forwarder, existing duty arrangements, or a project that must consolidate with other trades. |
Whichever route you pick, put the term on the purchase order in Incoterms form, for example FOB origin port or door-to-door to a named address. A bare "CIF" without a destination port written out is where disputes start.
Read the Packing List as an Installation Document
Cabinets are not bulk cargo; they are a set of interdependent parts. Ask for the packing list to be issued with crate or carton numbers tied back to the drawing numbers, so that crate 3 corresponds to the tall unit on kitchen wall B rather than "some tall cabinet". This single habit saves more time on site than any amount of email follow-up.
- Every crate numbered and cross-referenced to a drawing or room code.
- Doors, carcass panels, toe kicks, shelves and hardware listed as separate line items with quantities.
- Total number of packages, net and gross weight, and total cubic metres stated — the figures your forwarder will quote on.
- Fragile components such as glass-fronted units or stone-look worktops identified separately, with handling instructions on the crate itself.
Where a project also takes other items from the same supplier — bathroom ceramics, lighting, interior fixtures, flooring or wall panels — decide early whether those travel in the same container. Mixed loads reduce the number of shipments to track, but they also mean unloading sequence matters: heavy ceramics and flooring should not be stacked against finished cabinet panels.
Documents: Get Them Right Before the Vessel Departs
The logistics page refers to commercial invoices, packing lists, certificates of origin and import permits. For a cabinets-and-fixtures consignment, ask for the set as drafts before sailing, not as telex releases after arrival.
- Commercial invoice with correct values, currency, Incoterm and a description that matches the goods — "kitchen cabinets, made to measure" rather than a vague "furniture".
- Packing list matching the invoice line for line, with crate numbers.
- Bill of lading or sea waybill showing the correct consignee and notify party for your clearance agent.
- Certificate of origin where your import duty treatment depends on it.
Your own broker should confirm what the destination country requires for a cabinetry consignment: tariff classification, duty rate, any permits, and whether timber-content components attract treatment or declaration requirements. Those are importer-side obligations and vary by country, so they belong on your checklist rather than in the supplier's quotation.
Plan the Arrival Around Site Readiness
The most expensive failure in international cabinetry delivery is not damage; it is a container that arrives before the walls, screed and services are set out. Cabinets need a dry, enclosed storage area at destination, floor protection, and a crew that can start within days of delivery.
- Fix the delivery window against your site programme, not against the vessel's published ETA alone. Add allowance for clearance time and inland transport to site.
- Confirm storage on site: covered, dry, level, and with enough turning space for long panels.
- Inspect within the agreed claim period. Photograph crate condition before opening, then check door squareness, edge banding and panel flatness while the packaging is still available as evidence.
- Lodge shortage or damage claims with photos and the crate number in the same message, so replacements can be produced without re-measuring from scratch.
SANTERSON's service pages list on-site installation, inspection and snagging, spare parts and ongoing maintenance as part of the after-sales scope. Treat what is offered for your project as a written item in the order — who installs, who supervises, and what happens if a panel needs remaking — rather than assuming a crew will appear.
Coordinate Cabinets With the Rest of the Fit-Out
Shaker style doors read as classic detailing, and on real projects they are usually specified alongside other finishes rather than in isolation. Where the same fit-out also includes worktops, splashbacks, wardrobes or a media wall, one party should own the interface dimensions: worktop thickness and edge profile against door height, appliance housing depths, and where cabinet carcasses meet wall panelling or flooring.
This is where a turnkey furniture and building materials approach earns its place on a project. When cabinets, panels, doors, lighting and finishes come from one one-stop furniture and building materials supplier and one shipment plan, the interface dimensions are resolved in one drawing set instead of across four suppliers' emails. Related lines in the same catalogue — Santerson Outdoor Ready PVC Cabinets for external and semi-exposed areas, or Grey Shaker Cabinets where a board-based shaker door is specified — are easier to align when they share one production schedule.
A Practical Timeline to Work Back From
- Before order: site survey, approved drawings, finish samples confirmed, material and construction stated on the quotation.
- Production: deposit released, production slot booked, mid-production photo check for large orders, packing list issued against drawing numbers.
- Dispatch: booking with forwarder, documents checked as drafts, insurance confirmed for the value being shipped.
- In transit: tracking kept by one named person on the project; broker briefed early so clearance paperwork starts before arrival.
- Arrival: inspection against packing list, claim window respected, storage protected, installation crew briefed with the same numbered drawings used at origin.
Transit times, duty rates and clearance durations change by route and by season. Get them from your forwarder and broker for the specific destination, and keep them out of the purchase contract as promises.
Checklist before you place a project order: drawings signed off; construction and finish named on the quotation; packing list format agreed with crate numbers; Incoterm written in full with named destination; documents reviewed as drafts before sailing; site storage and installation crew confirmed for the arrival window.
SANTERSON works as a furniture and building materials manufacturer supplying project orders, with custom and OEM service covering bespoke sizing, material and finish selection. For a shaker style PVC cabinet order, send your drawings and destination address and the same team can price production and the freight options together, so the number you approve covers both.