A textured feature wall looks straightforward on a mood board and far more complicated on site. Panel sizes meet floor levels that are not quite level, reveal lines collide with door frames and skirting, and a finish approved as a sample behaves differently once it wraps a corner. Most of the rework we see on villa and hospitality projects starts as a coordination gap between the drawing set and the wall substrate, not as a manufacturing fault. This guide walks through how Santerson Textured Panels are specified and made to measure, what has to be settled on the drawings before production starts, and what to check on site so the panels arrive ready to install.

What the Panel System Actually Covers

Santerson Textured Panels sit in our Paneling Systems collection and are made for wall projects where dimensions, layout and finish are set per space rather than picked from a fixed catalogue size. Each order is made to measure, with material and finish selected against the project, so the panel face, the module width and the way edges are finished are all things you decide during specification. Because the listing is configurable rather than a single fixed item, we confirm dimensions and the selected specification for every project before production.

The same logic applies across the related systems, which matters when one drawing shows several wall types. Santerson Textured Sliding Panels carry the textured face onto openings and closet fronts where the wall has to move, while Santerson Acoustic Panels are used where the same visual language also has to serve a noise-control brief. Where a design wants relief rather than a flat textured face, our Luxury Decorative 3D Wall Panel is a lighter, cut-and-fix product used on feature walls in living rooms, hotel lobbies, restaurants and offices, with custom size, colour and pattern available. Choosing between these early avoids a drawing that mixes systems with different fixing methods and different tolerances.

Reading the Design Drawings Before Anything Is Cut

Before we produce a single panel, the drawing set needs to answer five questions. If any of them is still open, the wall will be resolved on site by whoever installs it, which is the expensive way to do it.

  1. Which walls, and where does each one start and stop? Mark the limits in relation to fixed reference points: door openings, window reveals, ceilings, floor finishes and any built-in joinery that abuts the panel.
  2. What is the finished floor level, including the finish build-up? Panel heights are measured from a completed surface. A screed or topping that is still to be laid changes every height on the sheet.
  3. How are corners, reveals and terminations detailed? External corners need a protection or mitre decision; reveals and junctions with plasterboard need a shadow gap, a trim or a butt joint. Each option has its own tolerance.
  4. What sits behind the panel? Switches, sockets, thermostats, handrails, wall-hung basins, TV fixings, brackets and light outlets all need setting-out positions before panels are cut, not after.
  5. Which finish, and on which face? Texture direction, grain direction and sheen read differently under directional lighting. Confirm the approved sample reference in writing against the elevation it applies to.

Where the wall integrates a door, treat the door and the paneling as one detail. Our Integrated Door & Paneling work exists for exactly this case, where the leaf has to disappear into a textured surface and the hinge line, the gap and the handle decision all affect the panel module. The same applies to niche and recessed detailing: Custom Niche Paneling is set out on the drawing with the display recess dimensions fixed, so the frame does not cut awkwardly through a textured module.

Site Requirements That Change the Specification

Once the drawings are settled, the site conditions decide how the panels are built and delivered. These are the items we ask for on every project:

Site item to confirmWhy it changes the panel order
Substrate type and flatnessBattening, fixing method and adhesive choice depend on whether the background is masonry, framed studwork or an existing finished surface. Panels are made to a given size; they cannot correct a wall that is out of plumb.
Completed floor and ceiling levelsFull-height panels need the level the room will actually have at handover, including any screed, waterproofing or finish build-up.
Openings and service runsElectrical boxes, data points, plumbing for wall-hung fixtures and any concealed access panel must be located on the setting-out drawing before cutting.
Wet and humid areasBathroom and spa-adjacent walls need a material and finish selected for that environment. Confirm the exposure with us at specification stage rather than at order stage.
Delivery route and storageLift sizes, stair widths and on-site storage determine module sizes and packing. A panel that cannot reach the room has to be split, which changes the joint pattern.
Installation sequence and trade orderPainting, flooring, lighting and joinery all touch the wall. Agree who completes what, and in which order, so the panels go in when the background is ready.

For projects that combine paneling with other fit-out items, coordinating one supplier for wall finishes, joinery, doors and fixtures removes a whole category of interface risk. Our turnkey solutions cover villas, hospitality and offices across design, production, logistics and installation, and the Wall Panel Systems range can be set out alongside cabinetry and doors on the same drawing package.

A Practical Coordination Sequence

1. Set out on site, then re-measure

Take dimensions from the drawings, then verify them on site against the completed substrate and record actual variations wall by wall. Made-to-measure panels only work if the numbers behind them are the real ones. Where a wall varies along its length, decide in advance whether the design absorbs the variation with a shadow gap or distributes it across modules.

2. Issue a shop drawing for sign-off

We prepare setting-out drawings showing module widths, joint positions, cut-out locations, corner and reveal details, and the finish reference for each elevation. The design team signs that sheet. It becomes the production reference and the installation reference, so the same document answers both questions.

3. Approve a physical sample in the real light

View the approved textured sample against the actual wall, at the distance people will stand, under the lighting that will be installed. Texture and sheen shift noticeably once directional light runs across a face; this is the cheapest correction available on the whole programme.

4. Prepare the background before delivery

Complete first-fix services, level and plumb the substrate, finish wet trades, and set the floor levels. Panels should arrive to a background that is ready for them, not to a wall still being corrected.

5. Install one bay first

Set the first bay or module and check joint alignment, corner detail and reveal before continuing across the wall. A correction here costs minutes; the same correction after the room is complete costs a panel set.

Confirm before you order. Textured panel listings on this site are configurable rather than fixed-specification items. Material make-up, fire performance, acoustic values, panel thickness and finish systems are not stated in the catalogue entry, so do not assume them. Request the specification for your project and have it reviewed against local requirements by your design team or certifier before ordering.

Handover Snag List

  • Joints aligned across openings and corners, with no uneven step between adjacent panels.
  • Cut-outs centred on the setting-out drawing, not adjusted on site.
  • Texture direction consistent across the whole wall, checked under installed lighting.
  • Protection fitted at external corners and high-impact locations where the design calls for it.
  • Spares from the same batch retained for future replacement or repair.

Send us your drawings

If you have elevations for a textured wall, send them with the completed floor levels and the service set-out, and we will return setting-out drawings and a specification for the selected finish. Our interior design services cover drawing and production coordination with on-site guidance, and logistics and door-to-door delivery brings the panels to the project address. Start at our contact page.