A combination modular wardrobe looks simple on a drawing: a run of carcasses, doors in one finish, some hanging space and a few drawers. The problems appear later - a door that fouls the bed frame, a drawer that cannot open because the skirting was not allowed for, a shelf height that does not suit the client's storage habits. Those failures almost never come from the wardrobe range itself. They come from project information that was missing when the layout and quotation were fixed. Below are the details we ask for before a combination modular wardrobe scheme is drawn, priced and put into production.

1. Room dimensions taken as built, not as drawn

Modular wardrobes are made to measure, so the numbers on an architectural plan are only a starting point. Before we detail a scheme we need the finished floor level, the finished wall faces, and the exact position of skirting boards, architraves, cornices and any ceiling bulkhead or drop. A 40 mm difference between structural and finished dimensions can change whether a carcass sits flush against the wall or needs a scribe panel, and it changes door reveal sizes.

Send us the information that shapes the fit:

  • Width, height and depth of the alcove or wall run, measured at floor, middle and ceiling level
  • Out-of-plumb and out-of-square readings where walls are not true, so we can plan scribing rather than assume a perfect box
  • Skirting and cornice profiles with their projection, and whether the wardrobe is to run over them or stop against them
  • Floor build-up and the final floor finish, including any underfloor heating that affects fixings
  • Position of sockets, switches, light points, radiators and air-conditioning grilles that must be kept clear or cut around

2. Access routes to the room, not just the wardrobe size

A wardrobe is built from panels, carcasses and doors, and those components have to travel from the factory to the room. Staircase width and turning landings, lift car dimensions, corridor and doorway clearances, and the service lift at a residential tower all decide whether a full-height side panel can go up whole or has to be split into joined sections. We also check the goods-lift at the loading bay and whether panels have to be craned or carried over a balcony.

This is why we ask for floor plans with vertical circulation, and for confirmation of the delivery route on site. Where access is tight, an early note lets us design jointed carcasses that still read as one continuous run once installed.

3. Who uses the space and how they store things

The interior layout is a project decision, not a catalogue default. The same wall run can be detailed very differently for an owner's bedroom, a guest suite in a villa, or a rental unit handed to different occupants over time. Tell us:

  • Hanging ratio versus folded storage, and whether long garments such as coats and dresses need a dedicated full-height hanging bay
  • Drawer requirements - deep bottom drawers for knitwear, shallow top drawers for accessories, or a drawer-focused modular wardrobe layout where most of the run is drawer boxes
  • Open display niches and lighting versus fully closed storage, and whether dust protection matters for rarely used items
  • Shoe, bag, luggage and ironing storage, plus any mirror, trouser pull or valet rail
  • Whether the room also has to hold a walk-in wardrobe arrangement with an island or peninsular unit, which changes circulation clearances and door swings
For investment and rental projects we usually specify a balanced mix of hanging space, closed drawers and a small number of open niches. It is easier to maintain, and it suits occupants whose storage habits you do not know.

4. Door type and the clearance it needs

Door selection is where room geometry and daily use meet. Hinged doors need a clear swing arc in front of the wardrobe, so the distance to the opposite wall or bed must be checked at every door position. Sliding doors save that swing but require a track zone above or below, and they limit how much of the interior you can see and reach at once. Bi-fold and folding systems sit between the two and depend on track quality and panel width.

Door typeWhat the project must confirm
Hinged / swing doorsClearance in front of each door, handle projection, position of beds and furniture, and whether the door can open fully with the drawer pulled out.
Sliding doorsTrack zone depth, wall or return panel for the doors to stack against, panel width limits, and smooth floor level for the bottom track.
Folding / bi-fold doorsCeiling and floor track alignment, number of hinges per panel, and access route for taller panels.
Glass-fronted doorsGlass type and tint - clear, frosted or smoked - visibility of the interior layout, and cleaning access on upper panels.

5. Finish, substrate and the environment the wardrobe lives in

Finish choices are set by the interior scheme, but they also have to suit the conditions of the room. In a coastal villa or a humid climate we pay attention to moisture content of the wall behind the carcass, ventilation in the bedroom, and edge banding quality on all four edges of exposed panels. For a project with several unit types, consistency across batches matters as much as the sample: state the board supplier, decor code and sheen level in the specification so later production runs match the approved mock-up.

  • Lacquer or acrylic fronts where a high-gloss or matte surface is specified, with the sheen level named
  • Wood veneer fronts where grain direction and colour variation across a run have been agreed on an approved sample
  • Melamine and laminated boards for cost-effective multi-unit schemes, with edge thickness and colour matched to the front
  • Glass fronts in clear, frosted, smoked or ribbed glass, with the interior layout then visible - so shelf and hanging heights must be tidy and correct

6. Hardware, lighting and integrated details

Hardware is usually specified late and it decides how long the fit-out lasts. Specify soft-close hinges and drawer runners by brand or duty class, state load ratings for trouser pulls and pull-down rails, and confirm handleless profiles if a handle-free elevation is drawn. Integrated lighting needs decisions before panels are drilled: sensor type, switch position, driver location for service access, cable routes through the carcass, and colour temperature matched to the room lighting.

Also settle these early, because they affect panel sizes and quotations: integrated mirror panels, matching interior fixtures such as bedside or dresser units in the same finish, concealed doors that continue the wardrobe elevation, and any cut-out for a wall-mounted television or safe.

7. Programme, quantities and site sequence

For multi-unit projects, quantity and repetition change the detail. Repeat layouts are worth standardising so that one set of approved drawings covers several rooms, with exceptions listed separately. We need the unit schedule or room-by-room list, the phasing of handover, and where components can be stored on site before installation.

Sequence matters more than people expect. Wardrobes are measured after wet trades, flooring and decorating are complete, then installed before soft furnishing and final cleaning. Send us the site programme so we schedule a re-measure at the right point and plan the installation window, including who provides power for tools and where packaging is removed.

Our own steps on a wardrobe package run from design consultation and space planning through material selection and specification, manufacturing with quality control, project management and site coordination, then delivery and handover. Freight is arranged door to door with customs paperwork handled, so the goods reach the project address rather than a port.

A practical checklist before you request a quotation

  • Built dimensions of each wardrobe run, measured at three heights, with wall tolerances noted
  • Finished floor levels and skirting details, plus the final floor finish
  • Access route from kerb to room: stairs, lift, doorway widths, turning restrictions
  • User profile per room type and the required mix of hanging, drawer and open storage
  • Door type with clearance confirmed against furniture layout drawings
  • Finish specified by substrate, decor code and sheen, backed by an approved sample
  • Hardware duty class and lighting specification, including driver location
  • Unit schedule, delivery phasing and the installation window in the site programme

If you send those details with your enquiry, we can return a layout that fits the room as built rather than the room as drawn. SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with made-to-measure wardrobes produced alongside cabinetry, doors, wall panelling and joinery in the same finishes, so a whole floor can be specified from one supplier.

Share your drawings, unit schedule and access notes, and we will confirm dimensions, layout and specification for each room before production starts. Contact us to start the specification review.