A Flush Wall Aligned Door reads as a continuous wall surface: the leaf sits in the same plane as the finished wall, the frame is hidden, and the opening stays quiet instead of announcing itself. That effect is not created by the door alone. It depends on decisions about size, construction, finish, hardware and opening geometry that have to be agreed before production starts. This guide sets out what buyers, specifiers and contractors should confirm while the drawings are still open, so the door arrives ready for the wall it will be built into.
Why the Detailing Conversation Comes Before the Order
A conventional framed door tolerates variation. Casing covers gaps, and a slightly out-of-plumb opening can be hidden with trim. A wall-aligned door removes that tolerance. Once the wall finish is applied around it, any mismatch in plane, reveal line or edge alignment becomes visible for the life of the project, and correcting it usually means cutting back wall lining, re-working the opening and remaking part of the door.
Because our doors are made to order rather than stocked in fixed sizes, the specification conversation is where most of the value sits. Our Flush / Concealed Doors range is described as made-to-measure, with material, finish and layout options that can be specified for each space, and we ask every buyer to confirm dimensions and selected specifications for their own project before production. The questions below are the ones that determine whether the finished opening looks designed or merely installed.
1. Opening Size, Leaf Height and Wall Build-Up
Send us the structural opening as built, not as drawn on the earliest design sketch, together with the wall make-up you intend to construct around it. What we need on the drawing:
- Clear opening width and height at three points each, plus the diagonal check, so we can see whether the opening is square.
- Total wall thickness including lining, any services cavity, insulation and the finished board thickness on both faces.
- Floor finish build-up above structural slab, so a full-height leaf can be set to the correct level relative to the completed floor.
- Headroom above the opening, particularly under a beam, bulkhead or ceiling grid where a tall leaf may need to be reduced or the opening reframed.
Tell us whether you want the leaf to run to the finished ceiling line or stop at a conventional head height. A full-height leaf is one of the most common reasons buyers specify this type of door, and it changes what the frame, hinge positions and wall support need to do.
2. Reveal Lines and Edge Details
The reveal — the shadow gap between leaf and frame — is the detail people notice first, and it needs to be chosen, not left to site judgement. Agree with us and your wall contractor:
- The width of the reveal on head, lock edge and hinge edge, and whether all four sides carry the same gap.
- Whether the reveal is a clean shadow gap or filled with a matching mastic, which matters where wall finishes are painted rather than clad.
- How the reveal relates to reveals used elsewhere in the project. Where a joinery package, panelling and doors come from one supplier, matching these lines across wardrobes, panelling and openings is far simpler than reconciling three workshops after the fact.
- Corner treatment on the leaf edge: sharp mitred edge, or a small eased edge for areas with heavy use.
3. Core Construction and Leaf Stability
A large, thin-looking leaf still has to stay flat and carry its own weight on the hinges. Discuss core type and leaf thickness against the height you have specified, not against a catalogue default. Points to settle:
- Core construction for the size requested, and how the leaf is stiffened along its length so a tall leaf does not bow over time.
- Hinge edge reinforcement, since concealed hinges on a full-height leaf concentrate load in a narrow zone.
- Whether the opening needs acoustic or privacy performance, which changes core build-up and perimeter detailing.
- Leaf thickness available for your chosen finish. A veneered face, a lacquered face and a decorative surface each need a different substrate build.
4. Finish: Paint, Veneer, Laminate or Decorative Surface
Our Custom & OEM service covers bespoke finishes, textures and materials across wood, metals, engineered stone and laminates, so the finish discussion is genuinely open rather than limited to a colour card. What we need from your side:
- The finish system used on adjacent walls and joinery, with the make and product reference where one has already been selected.
- Whether the door face is meant to disappear into the wall — matching paint or wall covering — or to read as a designed element in its own material.
- Sheen level. A high-sheen leaf held in the same plane as a matte wall will catch light differently and read as an object, not a surface.
- Sample approval before full production, with the sample showing the actual edge treatment, not just a flat colour patch.
Where the door is to be site-painted after installation rather than factory-finished, tell us at specification stage. It changes the substrate we supply and how the edges are prepared.
5. Hardware: Concealed Hinges, Handleless or Pivot
Hardware choice drives almost everything else in the opening. Our range includes handleless concealed doors and hinged variants, so the options to weigh are:
- Hinge type and position. Concealed hinges set into the leaf edge, with their load rating checked against the actual leaf size and weight you have specified. Hinge positions for a 2,400 mm leaf are not those for a 2,100 mm leaf.
- Handleless or recessed pull. A handle-free face keeps the wall plane uninterrupted. Decide between a vertical edge pull, a finger recess in the reveal or a groove in the leaf, and confirm which side of the leaf it sits on relative to the opening direction.
- Lockset and privacy. Concealed magnetic locks with a flush strike keep lines clean; a conventional lever set breaks them. For bathrooms and bedrooms, agree how privacy is indicated without a visible rose.
- Door action. Self-closing where doors are expected to stay shut, and soft-close in hospitality and bedroom settings where noise carries.
- Accessibility. Clear opening width after the leaf and frame are installed, plus the force needed to open — both matter for accessible rooms and should be checked against the project's access requirements rather than assumed.
6. Opening Geometry: Hinged, Sliding or Pocket
Not every opening in a wall-aligned scheme should swing. Where a swinging leaf would obstruct furniture layout or a corridor, the same flush treatment is available in other actions, and it is worth comparing them at design stage rather than after the wall is built:
| Action | Best suited to | What to confirm early |
|---|---|---|
| Hinged | Standard room and bathroom openings where swing space exists | Swing direction, hinge loading for the leaf height, stop detail at the wall |
| Sliding | Tight circulation, pantries, studies, ensuite entries | Wall cavity or surface track, leaf overlap at the closing jamb, clearance for handles |
| Where a full swing is not available and wall thickness allows a pocket | Pocket depth, wall build-up on both faces, access for hardware maintenance |
Our flush sliding doors and pocket door options are specified the same way as hinged leaves — made to measure, with finish and layout set per project. The deciding factor is normally wall thickness and what sits inside the wall.
7. Continuity With Panelling and Joinery
The strongest result comes when the door continues a surface rather than interrupting it. Where panelling, wardrobes and openings are ordered together, we can align grain direction, panel module sizes and reveal lines across them, including integrated door and panelling treatments. Send us the elevation drawings for the whole wall, not just the door schedule, so we can place the opening within the panel layout instead of cutting panels around a fixed position.
8. Site Sequence: Who Does What, and When
Frame installation, wall lining and finishing sit across trade boundaries, and most problems on site come from that seam rather than from the product. Agree in writing:
- Who sets the frame — our installer or your carpenter — and who is responsible for alignment tolerance once it is fixed.
- When the frame goes in relative to lining, rendering and finishing trades, so the reveal can be set before wall finishes are closed up.
- Protection arrangements between installation and handover; a flush leaf in a shared corridor takes knocks before practical completion.
- Final dimensions taken from the built opening at the point of order confirmation, since our doors are made to those confirmed measurements.
What to Send With Your Enquiry
To move from a drawing to a firm quotation in one pass, include:
- Door schedule with opening sizes, wall thickness and floor finish levels for each opening.
- Elevations of the walls the doors sit in, showing panel layout and reveal lines elsewhere.
- Finish references for adjacent surfaces, and whether finishing is factory or site applied.
- Hardware intent: handleless, recessed pull or lockset, plus any privacy or access requirement per room.
- Programme dates for frame installation and wall finishing, so production can be sequenced around them.
Frequently Asked Questions
Can existing openings in a renovation be fitted with wall-aligned doors?
Often, but the wall build-up is the limiting factor. Concealed frames need enough thickness to sit within, and older walls frequently carry less make-up than a new partition. Send the measured wall section with your enquiry and we will confirm what the existing opening can accept before you commit to the detail.
Are these doors made for residential projects only?
The Flush / Concealed Doors range is described for residential door projects, and the same made-to-measure approach applies across villa and hospitality work we deliver as part of a whole-project package. Where an opening carries higher traffic or specific performance demands, raise it at specification stage so core, hardware and finish are matched to that duty.
Do you supply the doors on their own?
Yes, and many buyers order them as part of a wider package alongside joinery, panelling and other fit-out items so finishes and lines match across the project. Our turnkey project solutions cover design coordination, production, delivery and installation support when doors are ordered as part of that package.
Bring Us the Drawing Early
Wall-aligned doors reward buyers who settle the detail before the wall closes up. Size, reveal, core, finish, hardware and opening geometry all interact, and each decision is cheap on paper and expensive on site. Send us your door schedule and wall elevations, tell us how the surrounding surfaces are being finished, and we will come back with a specification you can build to.
To discuss flush and concealed door options for a villa, apartment or hospitality project, contact SANTERSON — send your drawings and dimensions and we will confirm the specification for each opening.