Swimming Pools and Swim Spas · Poolside Fit-Out

A swim spa rarely fails on its own shell. It fails in the seams: the deck that arrives two centimetres out of level, the lounger whose finish clashes with the cabinet cladding, the power run that was never routed to the control system. The Outdoor Swim Spa WS-PC05ST is a compact 5-metre plunge and swim unit, which makes it a good test case for fit-out coordination, because almost everything around it has to be decided before production starts. The notes below follow the order our project team uses on villa and hospitality packages: envelope first, water plant second, then the surrounding furniture and finishes.

Start With the Footprint, Not the Model Number

The catalogue lists WS-PC05ST at 5000 × 2400 × 1470 mm, with a swim training system, water jets, LED lighting and ozone as the features shown for this configuration. Those figures are the outer shell, not the working zone. Before any other product is specified, three dimensions need to be fixed in writing on the drawing set:

  • Access route. The unit travels to site as a built assembly. Measure gates, side setbacks, turning radii and any overhead obstruction between the delivery point and the final position, then record the tightest clearance rather than the average one.
  • Service envelope. Leave permanent access to the control system, filter pump and the jet circuit. A spa that is boxed in on all four sides becomes a maintenance problem for whoever inherits it.
  • Deck level and drainage fall. The finished deck level decides the step height, and the fall away from the shell decides where splash water goes. Both must be resolved before the paving or decking order is placed.

Catalogue dimensions describe the spa as listed. Included equipment, electrical requirements and any site-built surround are confirmed against the selected configuration at quotation stage, so treat the numbers above as the starting point for your drawing, not as a substitute for it.

Size Up: WS-PC05ST, WS-PC05ST-S and WS-PC05ST-L

The same 5-metre layout is offered in three closely related listings, and choosing between them is a design decision rather than a commercial one. WS-PC05ST-S keeps the 5000 mm length at the same width and depth, while WS-PC05ST-L extends the shell to 5490 mm. If your deck module is a repeating square grid, the shorter variant keeps the joint lines aligned and avoids cutting the last paver; if the spa sits against a boundary fence, the extra half metre usually goes into the swim lane rather than the plant zone. Decide this while the paving layout is still editable.

ItemCatalogue figure for WS-PC05STWhat to do with it during coordination
Shell size5000 × 2400 × 1470 mmSet out the deck grid and step heights from this, plus your own access tolerance.
Total power6.55 kWHand to the electrical contractor early so cable size, protection and routing are on the first drawing revision.
Jet total6 pcsConfirms jet positions before tiling or cladding the adjacent wall.
LED lights4 pcsCoordinate with landscape lighting so one scheme, not two, is switched at night.
Filter pump / control system1 pc / 1 setReserve permanent access and ventilation for both.

Power, Plant and Access Before Any Finish Is Ordered

The single most expensive rework on a swim spa installation is an electrical run that has to be chased out of a finished deck. The catalogue figure for this configuration is 6.55 kW total power. Send that number, together with the position of the control system and filter pump, to the electrical contractor at the same time you send the layout to the tiler. Cable route, isolation point and protection then appear on revision A instead of becoming a site variation.

Water treatment is the second decision. Ozone is shown as a feature on this configuration; the catalogue also lists UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options across the range. Which of them you select changes the plant footprint, the noise profile next to a bedroom window, and whether an insulated shell is worth specifying for a spa that runs through winter nights. Specify the treatment package with the spa, not after it.

Decking, Steps and the Transition Detail

The step option is what turns a 1470 mm shell into something a guest or a child uses without hesitation. Two details are worth fixing on a sketch before ordering: the height of the first lift from deck to coping, and whether the step is integral to the spa or built from the same material as the surrounding deck. An integral step keeps the warranty boundary clean; a built step lets the finish continue uninterrupted, but it needs an agreed junction detail so splash water does not track under it.

For pool surrounds we usually steer hospitality projects towards aluminium sling sun loungers. The textilene mesh drains and dries quickly between splashes, the aluminium frame is treated for chlorine-rich and coastal air, and the range comes in static sled-base, wheeled and folding versions. That variety matters operationally: a resort deck that gets reset daily wants wheeled frames, while a villa terrace with fixed spacing can take sled bases. Frame finish and sling colour are customisable, which is how you keep the loungers from fighting the spa cabinet.

Shade, Privacy and the Hours People Actually Use It

A 5-metre spa on an exposed terrace gets used in a narrow band of the day unless shade is solved. A motorised louvered aluminium pergola next to the shell does three jobs at once: rotating louvers filter sun and close against light rain, built-in LED strips replace a separate lighting fixture, and zip screens on any side cut low sun and wind while keeping the space open. Because bay dimensions, frame colour and screen transparency are made to order, the pergola can be set out on the same grid as the deck. Place it clear of the service envelope, and check that the louver swing does not cross the lift path.

For a hotel pool or a villa that sells an image rather than a lap, cabana daybeds extend the same zone into somewhere people stay for an hour instead of ten minutes. The aluminium cabana daybed collection is offered with a louver-roof version for sun and rain control or a soft fabric canopy with curtains for privacy, both on rust-resistant aluminium frames with outdoor-grade cushions. Frame finish and textile palette are tailored to the project, so the cabana textiles can carry the colour that the loungers only hint at.

Dining and Lounging: Keeping One Material Language

Poolside furniture looks careless when three unrelated finishes sit in one sightline. The cleanest fix is to repeat two materials across every item: the metal of the pergola frame, and a warm slat tone picked up by tables and armrests. Aluminium and teak-look slat dining sets with matching adjustable sun loungers do this in one order: all-aluminium construction, teak-look textured slats that avoid the oiling and cracking of real timber, slatted surfaces that drain rainwater quickly, and reclining loungers in the same finish. For a high-traffic resort deck that low-maintenance combination is usually the deciding factor; for a residential terrace where the furniture sits under cover, it is a matter of taste.

Where the brief calls for a softer look, modern aluminium poolside dining and sun lounger collections pair powder-coated frames with weather-resistant cushions and adjustable recline positions, with finishes and dimensions available for bulk hospitality orders. Whichever route you take, order the spa cabinet colour, the pergola frame colour and the furniture finish from one specification sheet. Three separate colour choices on three separate purchase orders is how a coordinated scheme falls apart.

A Coordination Checklist You Can Hand to the Site Team

  • Access route measured and signed off, with the tightest clearance recorded in writing.
  • Finished deck level, step height and drainage fall drawn before paving or decking is ordered.
  • Control system and filter pump given permanent access and ventilation.
  • Total power figure issued to the electrical contractor on revision A of the drawings.
  • Water treatment package selected with the spa, not after it.
  • Spa cabinet, pergola frame and furniture finishes listed on one specification sheet.
  • Pergola footprint clear of the service envelope and the lift path.
  • Included equipment and electrical requirements confirmed against the final configuration before order confirmation.

Buying It as One Package

SANTERSON manufactures furniture and building materials in the same group, so the spa, the loungers, the pergola and the cabana can be produced against one set of dimensions and shipped together rather than tracked across four suppliers. That is where the coordination work above pays for itself: one drawing revision covers the shell size, the deck grid, the frame finishes and the lighting scheme, and the same team handles production, packing and door-to-door delivery under one order. Enquiries reach us Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8), and we reply within 24 hours with a configuration sheet for the exact model you are specifying.

Questions We Get From Specifiers

Can WS-PC05ST be recessed into a deck?

It can be set into a surround, but the shell needs permanent access to the control system and filter pump, and an insulated and drained perimeter detail. Send us the section drawing before the surround is built so we confirm what the selected configuration supports.

Which variant should I quote if the deck grid is fixed?

Send the grid dimensions. WS-PC05ST and WS-PC05ST-S share the 5000 mm length, while WS-PC05ST-L runs to 5490 mm; we will tell you which one lands on your module lines without cutting the last run of pavers.

Do the loungers and pergola have to come from the same order?

They do not have to, but they should share one finish schedule. Ordering them together means one production window, one set of packing lists and one shipment instead of three deliveries arriving in different weeks.

What do I need to send before you price the package?

A layout with the spa position and access route, the finished deck level, the treatment options you want from the catalogue list, and the furniture quantities for the pool zone. With those four items we can return a configuration sheet rather than a guess.